Solid Management Optimization for Offshore Big Bore HP/HT Sour Gas Well Cleanup

2020 ◽  
Author(s):  
Ardian Nengkoda ◽  
Abdallah Qahtani ◽  
Sami Logan ◽  
Mostafa Youssef ◽  
Alastair Sinker
2011 ◽  
Author(s):  
Mohammed Jasem Al-Saeedi ◽  
Fayez Abdulrahman Al Fayez ◽  
Dakhil Rasheed Al Enezi ◽  
mahesh sounderrajan ◽  
Mishary Najeeb Al-Mudhaf ◽  
...  
Keyword(s):  
Gas Well ◽  

2015 ◽  
Author(s):  
A. Ebrahimi ◽  
P. J. Schermer ◽  
W. Jelinek ◽  
D. Pommier ◽  
S. Pfeil ◽  
...  

2021 ◽  
Author(s):  
Ying Wang ◽  
Xin Zheng ◽  
Li Li ◽  
Jianbo Yuan ◽  
Minh Vo ◽  
...  

Abstract This paper describes the successful resin squeeze operation to seal off a micro-annulus between the 7" and 9-5/8" casings on a sour gas well located in Sichuan Basin, China. Integrated plug and abandonment were also essential to eliminate the risk of potential H2S exposure presented to the residents around this area. Resin, as a new alternative sealing technology, was technically evaluated, laboratory tested, and then chosen for squeezing into a micro-annulus to stop gas migration for its solids-free and low-viscosity properties compared to a conventional cement. The squeeze job was designed by taking the casing yield strength as the pressure limit (Confirmed by caliper log the casing was in good condition) and determining the resin pumping volume based on estimated resin squeeze volume and the remaining resin plug length. A "Braden-head" squeeze method was selected considering the low injection rate observed during the water injection test. Both stage-up and stage down squeezing techniques (hesitation squeeze of increasing and decreasing wellhead pressure stage by stage) were performed to maximize the injected volume of the resin sealant. A total of 800 L of 9.16 lb/gal resin was placed into a 4 ft milled interval, and 50 L were successfully squeezed into the 7" × 9-5/8" casing annulus. An operational learning was that resin injection is greatly improved during the stage-down process while keeping the casing annulus open. Evidence that the micro-annulus leak path had been sealed was an observation of 0 psi on the 7" × 9-5/8" casing annulus after resin fully set. The method of locating the optimal spot to squeeze resin involved noise logging to analyze for a potential gas source in the annulus. The post job results confirmed that resin acts effectively as an annular barrier in the repair of gas leaks in the small volume situations where micro-annulus exists in the cement sheath. For large voids such as inside 7" casing, a combination of cement plug plus mechanical barrier is recommended to be placed directly above resin plugs to complete permanent plug and abandonment of the wellbore.


2013 ◽  
Vol 712-715 ◽  
pp. 1096-1099
Author(s):  
Ling Feng Li

For natural gas well in sour gas reservoirs, very serious corrosion in the completed well system is an important factor of gas production system life. In order to ensure the long-term development of gas wells, this paper mainly introduces material corrosion prevention technology in the completed well system, such as corrosion-resistant alloy steel corrosion control technology, bimetallic combination tubing, corrosion inhibitor technology and so on. By taking LJ Gas Field as an example, this paper introduces the material corrosion prevention technology in the completed well system in LJ Gas Field. For application in the completed well system in LJ Gas Field, the technology above have good performance of corrosion resistance.


2013 ◽  
Vol 690-693 ◽  
pp. 1516-1519
Author(s):  
Ling Feng Li

For natural gas well in sour gas reservoirs, very serious corrosion in the gas well string is an important factor of gas production system life. In order to ensure the long-term development of gas wells, this paper mainly introduces the tubing and casing corrosion in sour gas reservoirs, corrosion-resistant material selection of tubing and casing in sour gas reservoirs and proposes the optimization idea and technique of tubing material selection.. By taking W 63 well as an example, this paper optimizes the material selection of production casing for W 63 well. For application, the optimal materials of gas well string in W 63 well have good performance of corrosion resistance.


2012 ◽  
Vol 29 ◽  
pp. 4267-4272 ◽  
Author(s):  
Zeng Shun-peng ◽  
Yang Xiu-wen ◽  
Zhang Qi-min ◽  
Xu Chun-bi ◽  
Liu Jingcheng ◽  
...  

2011 ◽  
Author(s):  
Gustioro Purwagautama ◽  
Idi Yusup Afandi ◽  
John M. Vincent
Keyword(s):  
Gas Well ◽  

2012 ◽  
Vol 485 ◽  
pp. 429-432
Author(s):  
Ling Feng Li ◽  
Xiao Ming Liu ◽  
Zhi Qiang Huang

For natural gas well with high content of CO2 and H2S, very serious corrosion in the gas well string is an important factor of gas production system life. In order to ensure the long-term development of gas wells, this paper mainly study the corrosion-resistant material selection of tubing and casing in sour gas reservoirs under coexistence of H2S and CO2 and proposes the optimization idea and technique of tubing and casing material selection. By taking Puguang gas field as an example, this paper optimizes the material selection of production casing for Puguang gas field. By testing, the optimal materials of gas well string in Puguang gas field have good performance of erosion resistance


1980 ◽  
Vol 30 (7) ◽  
pp. 787-789 ◽  
Author(s):  
Douglas M. Leahey ◽  
Gordon L. Brown ◽  
Ronald L. Findlay
Keyword(s):  
Gas Well ◽  

Sign in / Sign up

Export Citation Format

Share Document