Subsystem and coupling cost considerations using a visual dependency structure matrix
Keyword(s):
2019 ◽
Vol 1355
◽
pp. 012024
2005 ◽
Vol 23
(3)
◽
pp. 223-230
◽
Keyword(s):
2000 ◽
Vol 18
(2)
◽
pp. 173-182
◽
2009 ◽
Vol 17
(4)
◽
pp. 595-626
◽
2008 ◽
Vol 5
(9)
◽
pp. 274-297
◽