scholarly journals AN EXPLORATION OF THE INTERACTION BETWEEN BIM TECHNOLOGY AND THE BUSINESS PROCESS OF A CONSTRUCTION ORGANIZATION IN BIM IMPLEMENTATION

Author(s):  
BING CHEN ◽  
ANITA M. M. LIU ◽  
YUANYUAN HUA
Author(s):  
Dina Fitrianingrum ◽  
Sulastiningsih Sulastiningsih

The objective of the research is to evaluate performance of Madubaru firm. This research use the methode of Balanced Scorecard which balancing measurement of non finance performance and finance performance. In the perspective learning and growth emphasize on the education and employees training, and also employees satisfaction. In the perspective of internal business process, it emphasize at the the level of success and organizational development. In perspective of customer emphasize at the customer satisfaction. In perspective of finance can see from finance ratio. The research have result learning and growth perspective with good performance, internal business process perspective with very good performance, customer perspective with enough performance, financial perspective estimation with good performance. At general we can assesd performanced of Madubaru firm is good and expected to be improved again. Keyword : Balanced Scorecard, Learning and Growth Perspective, Internal Business Process Perspective, Customer Perspective, Financial Perspective.


2013 ◽  
pp. 25-30
Author(s):  
Arkadiusz Jurczuk

W artykule przedstawiono istotę i zasady oceny dojrzałości procesowej przedsiębiorstw oraz rolę modeli dojrzałości w podnoszeniu efektywności organizacji w kontekście paradygmatu Business Process Management. Zasadniczym celem poznawczym artykułu jest określenie zasad oceny dojrzałości według modelu CMMI oraz prezentacja nakładów i efektów wynikających z wdrożenia tego modelu. Wskazano także czynniki determinujące sukces wdrożenia modeli dojrzałości w praktyce biznesowej. (abstrakt oryginalny)


Author(s):  
Bibit - Sudarsono ◽  
Umi - Faddillah

Printing service order information systems sometimes experience problems in completing running business processes including, frequent loss and inaccuracy in registering orders from customers, often also losing order data from customers, recording orders often experience errors, resulting inaccurate reporting of order data. A computerized ordering service information system will greatly help improve performance and accuracy in making reports on business processes running at a company. The existence of enterprise modeling of information systems ordering printing services with the TOGAF framework will be a method that greatly helps management make a decision that will synergize with the business process activities at the company. So that the objectives of the system can be achieved properly. The TOGAF framework can be a solution and will help to produce a system architecture design, a business process architecture, a technology architecture, a number of proposed business opportunity strategy proposals and an ongoing system change proposal.


2019 ◽  
Vol 10 (1) ◽  
pp. 1-27
Author(s):  
Aniek Wijayanti

Business Process Analysis can be used to eliminate or reduce a waste cost caused by non value added activities that exist in a process. This research aims at evaluating activities carried out in the natural material procurement process in the PT XYZ, calculating the effectiveness of the process cycle, finding a way to improve the process management, and calculating the cost reduction that can achieved by activity management. A case study was the approach of this research. The researcher obtained research data throughout deep interviews with the staff who directly involved in the process, observation, and documentation of natural material procurement. The result of this study show that the effectiveness of the process cycle of natural material procurement in the factory reached as much as 87,1% for the sand material and 72% for the crushed stone. This indicates that the process still carry activities with no added value and still contain ineffective costs. Through the Business Process Mechanism, these non value added activities can be managed so that the process cycle becomes more efficient and cost effectiveness is achieved. The result of the effective cycle calculation after the management activities implementation is 100%. This means that the cost of natural material procurement process has become effective. The result of calculation of the estimated cost reduction as a result of management activity is as much as Rp249.026.635,90 per year.


The author analyzes the reasons that objectively reduce the importance and quality of the organizational and technological solutions of work production plans and the content of their main documents. Based on a generalization of practical experience, one of the real ways of increasing the level of work production plans is proposed as a result of the development of "The Unified Rules for Work Production on the Site" as part of the construction organization project, in the form of fundamental requirements, followed by the inclusion of this document in the work production plan as an input document. The structure and content of the Unified Rules are described with the disclosure of the main documents - calendar plans of work, construction master plans, technological schemes of works. The first section of the document contains requirements for the content of tasks for the development of the project of work execution, the order of its approval, and requirements for the quality of solutions. The second section presents principal solutions, methods of work execution and their technological schemes. The organizational and technological solutions adopted in the proposed document are specified and detailed by the General Contractor Construction Organization with due regard for the resource capabilities and the actual conditions of construction or reconstruction.


Sign in / Sign up

Export Citation Format

Share Document