Distributed generation is one of the most accepted strategies to attend the increase in electrical demand around the world. Since 2014, Colombian government agencies have enacted laws and resolutions to promote and regulate the introduction of different generation technologies into the country’s electrical system. The incorporation of distributed generation systems into conventional distribution networks can cause problems if technical studies are not previously carried out to determine the consequences of the start of the operations of these new generation technologies. This scenario represents a new challenge for distribution networks operators because they must ensure that their systems can integrate these new generation sources without affecting the correct operation of the grid. In this article, the IEEE 13 nodes system is modified by incorporating the load curves of the three types of consumers in the Colombian electricity market into the model. Additionally, distributed generation systems from non-conventional sources of energy are integrated into two system nodes in order to perform a quasi-dynamic analysis of the different electrical variables, which can be used to determine the impact of these new technologies on a local distribution system. The voltage profiles and active and reactive power do not show considerable changes in the behavior of the electrical network; however, in the simulation scenarios where distributed generators are operating, the system exhibits a considerable increase in lines losses. There are two alternatives to manage these unusual levels in the operation of the nodes with distributed generation: (1) operating these new DG nodes in islanded mode or (2) strengthening the local distribution system through the implementation of new distribution lines in the network.

Author(s):  
Sunny Katyara ◽  
Lukasz Staszewski ◽  
Faheem Akhtar Chachar

Background: Since the distribution networks are passive until Distributed Generation (DG) is not being installed into them, the stability issues occur in the distribution system after the integration of DG. Methods: In order to assure the simplicity during the calculations, many approximations have been proposed for finding the system’s parameters i.e. Voltage, active and reactive powers and load angle, more efficiently and accurately. This research presents an algorithm for finding the Norton’s equivalent model of distribution system with DG, considering from receiving end. Norton’s model of distribution system can be determined either from its complete configuration or through an algorithm using system’s voltage and current profiles. The algorithm involves the determination of derivative of apparent power against the current (dS/dIL) of the system. Results: This work also verifies the accuracy of proposed algorithm according to the relative variations in the phase angle of system’s impedance. This research also considers the varying states of distribution system due to switching in and out of DG and therefore Norton’s model needs to be updated accordingly. Conclusion: The efficacy of the proposed algorithm is verified through MATLAB simulation results under two scenarios, (i) normal condition and (ii) faulty condition. During normal condition, the stability factor near to 1 and change in dS/dIL was near to 0 while during fault condition, the stability factor was higher than 1 and the value of dS/dIL was away from 0.


Author(s):  
Adel M Sharaf ◽  
Khaled Mohamed Abo-Al-Ez

In a deregulated electric service environment, an effective electric transmission and distribution networks are vital to the competitive environment of reliable electric service. Power quality (PQ) is an item of steadily increasing concern in power transmission and distribution. The traditional approach to overcoming capacity and quality limitations in power transmission and distribution in many cases is the addition of new transmission and/or generating capacity. This, however, may not be practicable or desirable in the real case, for many of reasons. From technical, economical and environmental points of view, there are two important - and most of the time combined - alternatives for building new transmission or distribution networks to enhance the transmission system capacity, and power quality: the Flexible alternating current transmission devices and controllers, and the distributed generation resources near the load centers. The connection of distributed generation to the distribution grid may influence the stability of the power system, i.e. angle, frequency and voltage stability. It might also have an impact on the protection selectivity, and the frequency and voltage control in the system. This paper presents a low cost FACTS based Dynamic Distribution System Compensator (DDSC) scheme for voltage stabilization and power transfer and quality enhancement of the distribution feeders connected to a dispersed wind generator, using MATLAB/ SimPower System simulation tool.


2021 ◽  
Vol 11 (2) ◽  
pp. 774 ◽  
Author(s):  
Ahmed S. Abbas ◽  
Ragab A. El-Sehiemy ◽  
Adel Abou El-Ela ◽  
Eman Salah Ali ◽  
Karar Mahmoud ◽  
...  

In recent years, with the widespread use of non-linear loads power electronic devices associated with the penetration of various renewable energy sources, the distribution system is highly affected by harmonic distortion caused by these sources. Moreover, the inverter-based distributed generation units (DGs) (e.g., photovoltaic (PV) and wind turbine) that are integrated into the distribution systems, are considered as significant harmonic sources of severe harmful effects on the system power quality. To solve these issues, this paper proposes a harmonic mitigation method for improving the power quality problems in distribution systems. Specifically, the proposed optimal planning of the single tuned harmonic filters (STFs) in the presence of inverter-based DGs is developed by the recent Water Cycle Algorithm (WCA). The objectives of this planning problem aim to minimize the total harmonic distortion (THD), power loss, filter investment cost, and improvement of voltage profile considering different constraints to meet the IEEE 519 standard. Further, the impact of the inverter-based DGs on the system harmonics is studied. Two cases are considered to find the effect of the DGs harmonic spectrum on the system distortion and filter planning. The proposed method is tested on the IEEE 69-bus distribution system. The effectiveness of the proposed planning model is demonstrated where significant reductions in the harmonic distortion are accomplished.


Author(s):  
Mahesh Kumar ◽  
Perumal Nallagownden ◽  
Irraivan Elamvazuthi ◽  
Pandian Vasant ◽  
Luqman Hakim Rahman

In the distribution system, distributed generation (DG) are getting more important because of the electricity demands, fossil fuel depletion and environment concerns. The placement and sizing of DGs have greatly impact on the voltage stability and losses in the distribution network. In this chapter, a particle swarm optimization (PSO) algorithm has been proposed for optimal placement and sizing of DG to improve voltage stability index in the radial distribution system. The two i.e. active power and combination of active and reactive power types of DGs are proposed to realize the effect of DG integration. A specific analysis has been applied on IEEE 33 bus system radial distribution networks using MATLAB 2015a software.


Author(s):  
Zuhaila Mat Yasin ◽  
Izni Nadhirah Sam’ón ◽  
Norziana Aminudin ◽  
Nur Ashida Salim ◽  
Hasmaini Mohamad

<p>Monitoring fault current is very important in power system protection. Therefore, the impact of installing Distributed Generation (DG) on the fault current is investigated in this paper. Three types of fault currents which are single line-to-ground, double line-to-ground and three phase fault are analyzed at various fault locations. The optimal location of DG was identified heuristically using power system simulation program for planning, design and analysis of distribution system (PSS/Adept). The simulation was conducted by observing the power losses of the test system by installing DG at each load buses. Bus with minimum power loss was chosen as the optimal location of DG. In order to study the impact of DG to the fault current, various locations and sizes of DG were also selected. The simulations were conducted on IEEE 33-bus distribution test system and IEEE 69-bus distribution test system. The results showed that the impact of DG to the fault current is significant especially when fault occurs at busses near to DG location.</p>


2019 ◽  
Vol 63 (4) ◽  
pp. 295-300 ◽  
Author(s):  
Tamás Huzsvár ◽  
Richárd Wéber ◽  
Csaba János Hős

One of the basic infrastructures of every settlement is the water distribution system, which provides clean and potable water for both private houses, industrial consumers and institution establishments. The operational robustness and vulnerabilities of these networks is an essential issue, both for the quality of life and for the preservation of the environment. Even with frequent and careful maintenance, unintentional pipe bursts might occur, and during the reparation time, the damaged section must be isolated hydraulically from the main body of the water distribution network. Due to the size and complexity of these networks, it might not be trivial how to isolate the burst section, especially if one wishes to minimize the impact on the overall system. This paper presents an algorithmic method that is capable of creating isolation plans for real-life networks in a computationally efficient way, based on the graph properties of the network. Besides this segmentation plan, the topological behavior of the structural graph properties was analyzed with the help of the complex network theory to create a method for the quantitative topology based categorization of the water distribution networks.


2014 ◽  
Vol 668-669 ◽  
pp. 749-752 ◽  
Author(s):  
Xiao Yi Zhou ◽  
Ling Yun Wang ◽  
Wen Yue Liang ◽  
Li Zhou

Distributed generation (DG) has an important influence on the voltage of active distribution networks. A unidirectional power distribution network will be transformed into a bidirectional, multiple power supply distribution network after DGs access to the distribution network and the direction of power flow is also changed. Considering the traditional forward and backward substitution algorithm can only deal with the equilibrium node and PQ nodes, so the other types of DGs should be transformed into PQ nodes, then its impact on active distribution network can be analyzed via the forward and backward substitution algorithm. In this paper, the characteristics of active distribution networks are analyzed firstly and a novel approach is proposed to convert PI nodes into PQ nodes. Finally, a novel forward and backward substitution algorithm is adopted to calculate the power flow of the active distribution network with DGs. Extensive validation of IEEE 18 and 33 nodes distribution system indicates that this method is feasible. Numerical results show that when DG is accessed to the appropriate location with proper capacity, it has a significant capability to support the voltages level of distribution system.


Author(s):  
M Thomson ◽  
D Infield

This paper investigates potential technical effects that a high take up of domestic micro-CHP could have on an electricity distribution system. This study is based on a combination of house-by-house energy use modelling and network power-flow analysis. A variety of micro-CHP technologies are represented, including Stirling engines, internal combustion engines, and fuel cells. These have different heat-to-power ratios and thus different impacts on the electricity system. The results and discussion focus on voltage rise, which is considered to be the primary constraint on allowable penetration.


2015 ◽  
Vol 785 ◽  
pp. 388-392 ◽  
Author(s):  
Hasmaini Mohamad ◽  
Shahrani Shahbudin ◽  
Nofri Yenita Dahlan

Interconnection of Distributed Generation (DG) in distribution system presents many potential benefits as well as drawbacks. The impacts of DG might vary with the types of generator. This paper presents a study on the impacts of synchronous DG's interconnection in distribution system. Steady state analysis is carried out to analyze the impact of DG on voltage profile and short circuit current considering before and after DG interconnection. Dynamic analysis is also performed for investigating the performance of DG when a part of distribution system is being islanded. Results show that the penetration of DG contributes to the changes of power flow in the system, hence give impacts to the overall system performance.


Sign in / Sign up

Export Citation Format

Share Document