scholarly journals VALUE STREAM MAPPING AND ITS SIGNIFICANCE IN THE PRODUCTION PROCESS

2015 ◽  
Vol 2 (3) ◽  
pp. 13-16
Author(s):  
Daniela Onofrejova ◽  
Jaroslava Janekova
2018 ◽  
Vol 4 (1) ◽  
pp. 23 ◽  
Author(s):  
Agung Ravizar ◽  
Rosihin Rosihin

This study aims to reduce the waste that occurs on each workstation and has an impact on increasing productivity and reducing production costs caused by waste that occurs during production. The data used for this study is quantitative data obtained by direct observation to the relevant departments regarding the problem of identifying waste that occurs — data taken from observations as much as 30 times the collection of data and historical data used from January 2016 to June 2017. By using the value stream mapping method on lean manufacturing, it can be seen that there are five types of waste from the existing seven waste. The five wastes are unnecessary motion, waiting, reject, transportation and in-process processes. From the results of the value stream mapping carried out a reduction in waste on each workstation with a total reduction of waste that occurs at 66.97 tons / year or 18.6% on waste gel and 88.8 tons / year or 19.3% at waste powder and there was a reduction in the changeover process for 45 minutes or 12.16% of the total changeover time before the improvement. Also, there was also an increase in the production process speed of 2 minutes 47 seconds or 4.52% from the lead time of the previous production process, 61 minutes 34 seconds to 58 minutes 47 seconds.


Author(s):  
Nugraha Nugraha

Inability to fulfill the demand of consumers is becoming the major issues on citronella oil refinery in the village of Cimungkal Sumedang. This study was conducted to formulate alternative measures in order to increase the production of citronella oil distillates in the Cimungkal village. Mapping of the production process is done with Value Stream Mapping (VSM) as a first step to determine the processing time (lead time of production) and identify the waste that occurs, analyze the causes of the problems at the manufacturing level, and formulate remedial measures to increase the production of oil of citronella. The results show some activity in the production process of citronella oil which is a waste and should be minimized. By mapping, it can be seen that the lead time citronella oil refining initial amounted to 647 minutes or 10.78 hours. After repairs (Future State) improvements Total lead time to 274 minutes. Value-added activity increased by 38.93%, non-value added decreased by 3.63%, and necessary but non-value added fell by 35.3%. The study also resulted in the formulation of strategies that can be done to increase the production of oil of citronella. 


Author(s):  
Agustian Suseno ◽  
Hengky Hengky

PT. Trijaya Teknik Karawang is a manufacturing company that produces spare parts, namely the piece pivot. The increased demand make the company parties need to analyze the ability to do the production to make it more effective and efficient in order to win the competition. Preliminary observations on the production floor they still present problems that are categorized as waste. Based on it, lean manufacturing Approach used to solve these problems. First of all the waste identified by mapping the flow of production using Value Stream Mapping (VSM). Then determined the dominant waste going through weighting waste using Waste Assesment Model (WAM) with the result that the inventory is the dominant waste. Next choose a detail mapping tools with Value Stream Analyze Tools (VALSAT) and determine the cause of waste inventory with fishbone diagrams that result, the causes of waste inventory is the breakdown of the machine, the operator of conduct material handling and less nimble, the distance between the machine and the system far, the production batch manufacture. Recommendations for improvements are the application of the system production of one-piece flow with investing buying transfer dies and adds to the human resources division maintenance. The identification of the problem causing factors of the dominant waste activity, namely waste inventory using Fishbone diagrams is lack of engine maintenance because it does not have a maintenance division and the production system used is batch manufacture that produces goods in lot size so that there are WIP parts in each production process.


2019 ◽  
Author(s):  
◽  
Kate Lusiba

Lean manufacturing is an optimum approach for the reduction and elimination of waste within an organization. The case study company is based in South Africa and produces heat exchangers through main processes or fractals, which include pre-assembly, core building, brazing and final assembly. A walk through the plant showed that there was a large amount of inventory awaiting final assembly and that the brazing furnace often waited for material from core building. This was an indication that there could be an imbalance between the three fractals in terms of cycle time. Thus, the aim of this study was to improve the manufacturing processes for heat exchangers at the automotive manufacturing company through the deployment of value stream mapping, subsequent line balancing and developing a roadmap for reduction of waste. The case study research strategy was adopted for the study since it provided an in-depth view of phenomena. The first objective was to outline the production flow for the manufacture of automotive heat exchanger parts. The method used was a walk through the plant and observations were made to gain an understanding of the production steps from logistics production planning to shipping of the finished goods, and subsequently to a mapping-out of the production process flow was undertaken. The results showed that there was a large amount of inventory awaiting final assembly and that the brazing furnace often waited for material from core building. It was concluded that there was need to conduct a detailed process analysis to identify sources of waste. The second objective was to conduct value stream mapping for assessing the value- and non-value-adding activities in the manufacture of automotive heat exchangers components. A value stream map was developed through walking to Gemba and mapping out the production process, collecting data and pinpointing waste activities or areas to be improved. The kaizen flashes from the value stream map also revealed that operators were not fully utilizing the capacity of the bottleneck workstations. It was concluded that two instead of one planning points, and inefficiency at assembly were root causes of the high work-in-process level. The third objective was to conduct a line balancing analysis for the three production fractals. The method used was a Pareto analysis for evaluating the products, analysing the product mix and line balancing analysis of the production line. The results revealed that the furnace was run on two shifts while the subsequent assembly and preceding core building were running on three shifts causing a work-in-process build-up, thereby resulting in line imbalance. It was concluded that it was imperative to change the scheduling approach, and adopt one that prioritised and spread the cores that had relatively short cycle times, and also reduce downtime, change-over time as well as additional time for scrap and defects, and a future-state balance chart revealed that the fractals imbalance had been reduced. The fourth objective was to develop a roadmap for reduction of waste in the manufacture of car heat exchangers components. The method used was to develop proposals and assess the feasibility and cost implications of implementing each option. Recommendations were made for continuous process improvement and a roadmap for reduction of waste was proposed. In order to improve the output of assembly, training for the operators was recommended since it would also enable the removal of the second planning point at assembly. Further research could also be conducted to develop an optimal scheduling algorithm for allocation of products to work centres to ensure high utilization of work centres and reduce work-in-process inventory.


2019 ◽  
Vol 27 (4) ◽  
pp. 850-871 ◽  
Author(s):  
Shuqiang Wang ◽  
Jia Tang ◽  
Yiquan Zou ◽  
Qihui Zhou

Purpose The purpose of this paper is to investigate the process optimization of a precast concrete component production line by using value stream mapping. Design/methodology/approach This paper is an empirical focused on of lean production theory and value stream mapping. The data in the case study were collected in real time on-site for each process during the production process of a prefabricated exterior wall. Findings The results of the current value stream map indicate that the main problems of the current production process are related to equipment, technology and organization. The equipment problems include simple demolding and cleaning tools and the lack of professional transfer channels. The technology problems include the lack of a marking mechanism and pipeline exit mechanism. There is a lack of standard operating procedures and incomplete process convergence. A comparison and analysis of the current value stream and the future value flow indicate that optimizations of the process flow, the production line layout, and the standard operating procedures have shortened the delivery cycle, reduced the number of workers, improved the operator’s operating level and balanced the production line. Practical implications The results of this study provide practitioners with a clear understanding of the optimization of the precast concrete component production and represent a method and basis for the process optimization of a factory production line; the approach is suitable for process optimization in other areas. Originality/value This research represents an innovative application of lean production theory and value stream mapping in a complex production line of precast concrete components and thereby fills the gap between the theory and practice of the optimization of a precast concrete component production line.


2019 ◽  
Vol 19 (3) ◽  
pp. 405-423 ◽  
Author(s):  
Adefemi Aka ◽  
Abosede Adebisi Bamgbade ◽  
Ibrahim Saidu ◽  
Oladimeji Moses Balogun

Purpose Non-value adding activities or waste have been a major challenge for the construction industry. Researchers worldwide have investigated how such activities can be reduced or overcome in the industry. However, much has not been done regarding waste in the production process of building blocks. Therefore, this study aims to investigate the various waste in sandcrete blocks production process (SBPP). The study also aims to find out the causes of the waste and their impacts on the factory performance. Design/methodology/approach To achieve the aims of this study, a qualitative study was conducted in five sandcrete blocks firms in Minna. Physical observation and interviews were the main instruments used for data collection. The data obtained were analyzed through content analysis. Samples of blocks (low standard only) were also taken to the laboratory for compressive and porosity tests. Thereafter, questionnaires were administered to other sandcrete blocks producers in six firms. The essence of this was to investigate the applicability of the identified waste in other factories in the study context and for further data analysis. Findings Typical forms of waste in SBPP are excessive stocking of sand and cement, long distance covered from the store to the mixing or production location, excessive quantity or over design of materials and over vibration or compaction of the newly produced blocks. It is anticipated that adoption of lean concepts, tools and techniques in the production of sandcrete blocks will help to eradicate the identified waste in the process and stimulate a future state value stream mapping (VSM). The practicality of the expected future state VSM is presently being investigated by one of the five firms in the study context. Research limitations/implications The findings of the study mainly provide further insights on the various process waste in Nigerian sandcrete blocks production. Practical implications The study provides knowledge on how lean thinking can be adopted to identify and reduce waste in SBPP. Such knowledge may be beneficial to the present and prospective sandcrete blocks producers. The study also provides insight on how the overall cost of production of sandcrete blocks and the quantity of CO2 that is being released into the atmosphere in the production process can be reduced. The VSM in the proposed framework also serves as a tool that can be globally adopted for waste identification by producers of other forms of blocks such as bricks. Originality/value This paper satisfies all the tenets of originality as it has not been previously published and all the information obtained from other studies have been duly referenced. The study is also original as it is first in the study context to propose for a lean framework that can be used to reduce waste in SBPP.


2017 ◽  
Vol 17 (3) ◽  
pp. 143-148
Author(s):  
R. Władysiak ◽  
T. Pacyniak ◽  
J. Trzoska

AbstractThe paper presents the technology and organization of the artistic cast production. On the basis of the actual cast production system, the manufacturing process was shown, in particular sand–piece moulding, which is a very important process and a time-consuming part of the entire manufacture of the casts. The current state of the production process as well as the organization of the work and production technology were analysed with the use of methods and techniques of production improvement, the Lean Manufacturing concept and computer systems. The results of the analysis and studies were shown with use of schemes and graphs of the layout of the production resources, a flow chart of the production process, value stream mapping, and a costs table for the production and modernization of the moulding stage. The work has shown that there are possibilities to improve the artistic cast production system. This improvement leads to increased productivity, lower production costs of artistic casts and increased competitiveness of the foundry.


2020 ◽  
Vol 13 (1) ◽  
Author(s):  
Haris Dwi Armyanto ◽  
Dwi Djumhariyanto ◽  
Santoso Mulyadi

CV.X merupakan salah satu perusahaan pengolahan sarden yang terletak di Banyuwangi. Pada proses produksi di perusahaan masih ditemukan beberapa pemborosan (waste). Untuk mengurangi pemborosan yang terjadi digunakan pendekatan lean manufacturing dengan metode Value Stream Mapping (VSM) untuk pemetaan aliran produksi dan aliran informasi terhadap proses produksi dari awal bahan baku hingga produk jadi dan dikirim ke konsumen, serta analisis dengan metode Failure Mode and Effects Analysis (FMEA) untuk mengetahui penyebab kegagalan proses yang paling prioritas dan perlu dilakukan perbaikan dengan segera. Identifikasi pemborosan diawali dengan penggambaran current state map, lalu dilakukan analisis pemborosan ke dalam kategori 7 pemborosan [1]. Pada analsis tersebut ditemukan 3 jenis pemborosan yaitu waiting time, unnecessary inventory dan defect (kembung). Setelah itu dilakukan analisis akar penyebab timbulnya pemborosan menggunakan fishbone diagram, dan analis FMEA untuk mengetahui nilai RPN tertinggi yang selanjutnya akan menjadi prioritas pemberian usulan perbaikan yang tepat dan sesuai dengan masalah dan kondisi proses produksi sarden 125g di CV.X. Rekomendasi perbaikan yang diberikan terhadap pemborosan dengan nilai RPN tertinggi antara lain Menambahkan mesin pencuci produk untuk mengurangi penumpukan produk dan waktu tunggu yang ada sehingga pemborosan waiting time dan unnecessary inventory dapat berkurang, mengganti sarung tangan kain dengan lateks, serta menjaga kebersihan nampan ikan. CV.X is a sardine processing company located in Banyuwangi. In the company production process there are some wastes. To reduce the waste that occurs, lean manufacturing approach using Value Stream Mapping (VSM) method is used to map the production flow and information flow to the production process from the beginning of the raw material to the finished product and sent to consumers, as well as analysis using the Failure Mode and Effects Analysis (FMEA) method. ) to find out what causes the most priority process failures and needs immediate improvement. Waste identification is preceded by a depiction of the current state map, then waste analysis is conducted into category 7 waste. In this analysis, there are 3 types of waste, which are waiting time, unnecessary inventory and defects. After that an analysis of the root causes of waste occurs using fishbone diagrams, and FMEA analysts to find out the highest RPN value which will then be prioritized for giving recommendations for an appropriate improvement and in accordance with the problems and conditions of the 125g sardine production process in CV.X. Improvement recommendations given for waste with the highest RPN value include adding a product washer to reduce product buildup and waiting times so that waiting time and unnecessary inventory waste can be reduced, replacing cloth gloves with latex, and keeping the fish tray clean.


2014 ◽  
Vol 612 ◽  
pp. 89-95 ◽  
Author(s):  
B. Vijaya Ramnath ◽  
Vishal Chandrasekhar ◽  
C. Elanchezhian ◽  
L. Bruce Selva Vinoth ◽  
K. Venkatraman

The main objective of this paper is to improve the productivity of a carburetor production processes using lean manufacturing technique. The current system of the carburetor production process has been mapped using electronic Value Stream Mapping (eVSM) tool which is a lean manufacturing tool and the wastages in the current system are identified. Then future state was drawn by using eVSM tool which has an enhanced process ratio by decreasing maximum possible waste in the production process. The current and future state of the carburetor production has been created as model and simulated using Arena software. The simulation shows a significant decrease in Non-Value added time and production lead time, thereby indicating increase in productivity and better work flow in production processes.


Sign in / Sign up

Export Citation Format

Share Document