DEVELOPMENT AND VERIFICATION OF A SEISMIC SURVEY METHOD AHEAD OF THE TUNNEL FACE USING DRILLING VIBRATION DATA OF ULTRA-LONG CONTROLLED BORING
2019 ◽
Vol 75
(1)
◽
pp. 26-39
2014 ◽
Vol 875-877
◽
pp. 416-422
2017 ◽
Vol 16
(4)
◽
pp. 304-312
2018 ◽
Keyword(s):
2016 ◽
Vol 72
(2)
◽
pp. 53-66
◽
2018 ◽
Vol 6
(4)
◽
pp. 113
◽
Keyword(s):
Keyword(s):