scholarly journals Architectural Steel Structure (Process ^|^amp; Construction) Welding Construction Process and Quality Control in Architectural Iron Frame

2011 ◽  
Vol 80 (6) ◽  
pp. 538-545
Author(s):  
Mitsuhiro KOBAYASHI
2019 ◽  
Vol 2 (5) ◽  
Author(s):  
Tong Wang

The compaction quality of the subgrade is directly related to the service life of the road. Effective control of the subgrade construction process is the key to ensuring the compaction quality of the subgrade. Therefore, real-time, comprehensive, rapid and accurate prediction of construction compaction quality through informatization detection method is an important guarantee for speeding up construction progress and ensuring subgrade compaction quality. Based on the function of the system, this paper puts forward the principle of system development and the development mode used in system development, and displays the development system in real-time to achieve the whole process control of subgrade construction quality.


2011 ◽  
Vol 243-249 ◽  
pp. 4293-4296
Author(s):  
Jing Li Liu ◽  
Lian Yu Wei ◽  
Guo Qiang Zhang

Through the foaming mechanism and foaming effect evaluation, this paper analyzes the production procedure, optimum content and strength of foamed asphalt mixture thoroughly. Combined with the construction process quality control and inspection and acceptance criteria, this paper provides data for reference and theoretical basis for application of cold recycled technology of foamed asphalt to pavement project. Its construction without disrupting traffic, thus shorten the construction period and improve efficiency, which also have advantages such as energy conservation, environment protection and economy. Above all, it is beneficial to foamed asphalt′s popularization and application.


Author(s):  
Bach Duong

Unexpected defects of concrete in a completed bored pile can arise during the construction stage. Therefore, post-construction testing of bored pile concrete is an important part of the design and construction process. The Cross-hole Sonic Logging (CSL) method has been the most widely used to examine the concrete quality. This method requires some access tubes pre-installed inside bored piles prior to concreting; the required quantity of access tubes has been pointed out in few literatures and also ruled in the national standard of Vietnam (TCVN 9395:2012). However, theoretical bases aiming to decide the required quantity of access tubes have not been given yet. A probability approach is proposed in this paper aiming to determine the essential quantity of access tubes, which depend not only on pile diameters, magnitude of defects, but also on the technical characteristics of CSL equipment. Keywords: access tubes; bored piles; CSL method; defects; inspection probability.


2020 ◽  
Vol 39 (6) ◽  
pp. 9015-9026
Author(s):  
Lilin Wang

The light steel structure is always the common material of the movable plank house, and the new bud light steel system is the light steel system used for a long time after the earthquake. This paper discusses the mechanical system of the light steel structure of Huoshenshan hospital, which was built in ten days. In the process of building, the geometric form of roof stress has changed. In the actual structural design, the designer seldom takes the calculation of construction load into account, which is quite different from the actual construction process. So it is very important to simulate and monitor the whole process of structure installation. In this paper, the finite element software MIDAS / Gen is used for simulation analysis to ensure that the simulation analysis results are consistent with the construction process, the model material and the actual size are completely consistent, and the stress simulated by the software can meet the needs of the actual stress through the actual measurement.


2020 ◽  
Vol 143 ◽  
pp. 01046
Author(s):  
Jing Liu ◽  
Fei Meng ◽  
Yingqi Chen ◽  
Zongxue Chen

:Chord dome structure is a new type of hybrid prestressed spatial steel structure system, which is often used in large-span structures. During the construction of the structure, it is necessary to apply prestress to the ring cable. Taking the chord dome roof of Hebei North University gymnasium as an example, the whole process of prestressed cable construction is simulated and analyzed by using the finite element software ANSYS. The hoop cable of the dome roof can slide freely in the hoop direction, and the attribute of free sliding in the ANSYS interface is "coupling". In this paper, two kinds of simulation models, coupling and uncoupling, are established to compare, and then to explore the influence of coupling on the construction process of string dome structure.


2016 ◽  
Vol 16 (04) ◽  
pp. 1640020 ◽  
Author(s):  
Jun Teng ◽  
Wei Lu ◽  
Yan Cui ◽  
Rengui Zhang

The long-span spatial steel structure takes its complex construction process because of its features, such as large scale, wide range, and long cycle duration. Simultaneously, the structural construction process can not only affect the shaping of long-span spatial structure, but also produce a great effect to structural final force state, which makes the construction monitoring of long-span spatial steel structure necessary. The most important construction parts for Shenzhen Bay Stadium steel roof are unloading process and closure process. Considering the structure complexity in the construction phase, a structural health monitoring system was installed, which began to be built in early 2010 and contained two phases: construction monitoring and operation monitoring. In this paper, the temperatures and displacements monitoring in construction phase are firstly described in detail. The monitoring data of temperature and displacement measured in unloading and closure phases are then analyzed, respectively. According to these monitoring data, the comprehensive understanding for the structural performances in construction phase is shown and discussed, which can provide a reference of construction monitoring for the related projects.


2012 ◽  
Vol 226-228 ◽  
pp. 1209-1213
Author(s):  
Wei Lin Zhang ◽  
Zhi Xin Wu ◽  
Bai Hui Chen

The construction process of the large span spatial steel structure was studied by finite element method and the time-varying mechanics. The construction process of complex spatial frame structure was divided into the installation and dismount supporting phase, and each stage was divided into 15 steps in which mainly simulated and analyzed the whole construction process by "life-death" element. The critical control points of each construction step were identified, the stress state, interval value and the maximum stress in the structure of each construction condition were conformed; rod deformation in construction process was analyzed in construction program. The result showed that the large span spatial steel structure construction scheme was numerical simulated and calculated by the method of finite element analysis and the mechanical state, deformation and safety of building structure were predicted accurately during construction.


2013 ◽  
Vol 444-445 ◽  
pp. 971-975
Author(s):  
Zhan Sheng Liu ◽  
Xiao Feng Wu ◽  
Rui Long Xu

Prestressed steel structure is the common form of space structure. BIM technology is used to every field of the construction industry. In order to apply BIM technology to the design and construction of prestressed steel structures, Xuzhou stadium prestressed structure was took as an example with BIM technology. Firstly, development standards of the family are created. Secondly, three-dimensional positioning technology and then establishing three-dimensional models of BIM are designed. Finally, the construction process of Xuzhou stadium is dynamically simulated.


2011 ◽  
Vol 105-107 ◽  
pp. 2010-2014
Author(s):  
Yong Quan Wang ◽  
Zheng Xing Guo ◽  
Bin Luo

In order to ensure the prestress establishment of large-span suspendome, research on the measure-control methods for large-span suspendome during prestress construction process is performed, by summarizing the existing measure and test methods. According to engineering practice at present, the paper classifies the measure-control content of large-span suspendome during prestress construction period into two parts: internal force of cable-strut and deformation of steel structure. Taking practical project of a gymnasium as an example, the axial forces of hoop cables, radial steel tie rods and struts are measured, and also the verticality of struts. The test results are analyzed, and compared with the calculated value. The results show that, the internal forces of cable-strut and verticality of struts can both meet the design requirement, by mechanical analyzing and precise monitoring of the whole prestress construction process. The conclusion is that, before the prestress construction of large-span suspendome, construction mechanics analysis must be carried out in details to determine the control content and its target value, right measure-control methods are chosen, and then the effective establishment of prestress can be achieved.