scholarly journals A combined Health, Safety and Environment (HSE) Risk Assessment Model Based on PMBOK Project Management Guide; a Case Study: Development Plan of the Islamic Consultative Assembly of Iran

2018 ◽  
Vol 4 (4) ◽  
pp. 47-58
Author(s):  
Ehsan Jafarnia ◽  
Ahmad Soltanzadeh ◽  
Samira Ghiyasi ◽  
◽  
◽  
...  
2016 ◽  
Vol 11 (2) ◽  
pp. 694-721 ◽  
Author(s):  
Charalampos Apostolopoulos ◽  
George Halikias ◽  
Krikor Maroukian ◽  
Georgios Tsaramirsis

Purpose This paper aims to take the challenge to propose a novel modelling approach named Change Risk Assessment Model (CRAM), which will contribute significantly to the missing formality of business models especially in the change risk assessment area and decision-making. Organisational change risks are assessed with the aid of analytic hierarchy process (AHP) in an attempt to define the internal dynamics of organisational change management within project management eliciting also risk cause-and-effect relationships. Design/methodology/approach The study discusses interviews/survey/AHP. Findings The study presents the following findings. Change risk factors assessment (identification and prioritisation) recommendations (see Case Study) integration of change management; project management; risk management top four risk factors, namely, leadership, communication, project management team and culture. Research limitations/implications As projects can be different in a variety of factors (quality, scope), an exhaustive list of risk factors cannot be identified. There is a continuous risk identification process throughout the projects’ life cycle. For example, many risks can be classified initially as unknown and can be refined after the initiation phase of the project. AHP factors limitation (eight per level) possible bias (survey analysis). Practical implications With the aid of modelling and especially CRAM, business change risks can be assessed numerically and prioritised. Several risk factors and related attributes were identified and categorised. This empowers project managers or other stakeholders to make proper decisions about whether to take on or abandon respective organisational or project changes. Social implications One of the values of CRAM is that it can be regarded as a global change risk assessment method that can be applied regardless of project type, size or organisation. Moreover, it has the advantage that it can be used by any kind of project, as the method is designed to be tailored to specific needs, taking significant environmental change risk factors into account. AHP has numerous uses in operational research, in project management and in general in areas where decisions (evaluation and selection) have to be made. The analysis of the case study presented, indicated that it is vital to assess the degree (impact) that each risk attribute poses to address complex organisational decisions. Originality/value CRAM aims to bridge the gap between theoretical and applied work in the integrated research field of change management, project management and risk management. Furthermore, the approach attempts to develop a novel systematic methodology (model) for assigning probabilities in attributes (criteria) pair-wise comparison and more specifically, modelling and assessing change management risks, adding a different perspective and technique to the research area.


2020 ◽  
Vol 27 (8) ◽  
pp. 1813-1833 ◽  
Author(s):  
Wenpei Xu ◽  
Ting-Kwei Wang

PurposeThis study provides a safety prewarning mechanism, which includes a comprehensive risk assessment model and a safety prewarning system. The comprehensive risk assessment model is capable of assessing nine safety indicators, which can be categorised into workers’ behaviour, environment and machine-related safety indicators, and the model is embedded in the safety prewarning system. The safety prewarning system can automatically extract safety information from surveillance cameras based on computer vision, assess risks based on the embedded comprehensive risk assessment model, categorise risks into five levels and provide timely suggestions.Design/methodology/approachFirstly, the comprehensive risk assessment model is constructed by adopting grey multihierarchical analysis method. The method combines the Analytic Hierarchy Process (AHP) and the grey clustering evaluation in the grey theory. Expert knowledge, obtained through the questionnaire approach, contributes to set weights of risk indicators and evaluate risks. Secondly, a safety prewarning system is developed, including data acquisition layer, data processing layer and prewarning layer. Computer vision is applied in the system to automatically extract real-time safety information from the surveillance cameras. The safety information is then processed through the comprehensive risk assessment model and categorized into five risk levels. A case study is presented to verify the proposed mechanism.FindingsThrough a case study, the result shows that the proposed mechanism is capable of analyzing integrated human-machine-environment risk, timely categorising risks into five risk levels and providing potential suggestions.Originality/valueThe comprehensive risk assessment model is capable of assessing nine risk indicators, identifying three types of entities, workers, environment and machine on the construction site, presenting the integrated risk based on nine indicators. The proposed mechanism, which adopts expert knowledge through Building Information Modeling (BIM) safety simulation and extracts safety information based on computer vision, can perform a dynamic real-time risk analysis, categorize risks into five risk levels and provide potential suggestions to corresponding risk owners. The proposed mechanism can allow the project manager to take timely actions.