Standpipe-Bubbler pump level control study: 1E-3862, controlled clearance pump/system model analysis (Task A) W. P. 7373. Engineering memorandum 0190. [LMFBR]
Keyword(s):
2012 ◽
Vol 546-547
◽
pp. 784-789
2011 ◽
Vol 130-134
◽
pp. 1605-1608
Keyword(s):
2019 ◽
Vol 174
◽
pp. 1279-1289
◽
1996 ◽
Vol 263
(1373)
◽
pp. 1071-1078
◽
Keyword(s):
Keyword(s):
2006 ◽
Vol 64
(4)
◽
pp. 1255-1264
◽
Keyword(s):