Adaptation of the black oil simulator to two-phase and three-phase relative permeability determination using unsteady-state technique. Status report, Project BE1, Task 4
Keyword(s):
Keyword(s):
1966 ◽
Vol 6
(03)
◽
pp. 199-205
◽
Keyword(s):
Keyword(s):
2000 ◽
Vol 171
(1-2)
◽
pp. 127-149
◽
1979 ◽
Vol 19
(01)
◽
pp. 15-28
◽
Keyword(s):
Keyword(s):
Keyword(s):
2021 ◽