scholarly journals Development of high-temperature turbine subsystem technology to a technology readiness status Phase II. Quarterly report, January-March 1982

1982 ◽  
Author(s):  
M. W. Horner
Author(s):  
M. W. Horner ◽  
A. Caruvana

Final component and technology verification tests have been completed for application to a 2600°F rotor inlet temperature gas turbine. These tests have proven the capability of combustor, turbine hot section, and IGCC fuel systems and controls to operate in a combined cycle plant burning a coal-derived gas fuel at elevated gas turbine inlet temperatures (2600–3000°F). This paper presents recent test results and summarizes the overall progress made during the DOE-HTTT Phase II program.


Sign in / Sign up

Export Citation Format

Share Document