scholarly journals Review of nuclear power plant offsite power source reliability and related recommended changes to the NRC rules and regulations

1980 ◽  
Author(s):  
R.E. Battle ◽  
F.H. Clark ◽  
T.W. Reddoch
Author(s):  
Zhang Zhichao

At present, in the typical design of China’s nuclear power plant, main generation system is connected to the power grid by 500 kV system. 500 kV system as a priority power source, 220kV system as an auxiliary power source. Independent operation of 500kV and 220kV system, improved the reliability of power supply of nuclear power plant. However, the DC 220V power system used to control the 500kV and 220kV system in the switch station of partial nuclear power project is not independently configured, and the design form of one set of DC system is used in the transformer station. In recent years, there are many accidents that AC power enters into the DC power system, resulted in the loss of power source in the transformer station. The loss of external power source in the whole plant is very significant. In this paper, the influence of AC power entering into DC power system on relay protection device is analyzed, the measures to prevent the AC power into DC power system are discussed, the necessity of independent configuration of DC control power system for the 500kV priority power system and 220kV auxiliary power supply system is analyzed.


2020 ◽  
Vol 39 (5) ◽  
pp. 6339-6350
Author(s):  
Esra Çakır ◽  
Ziya Ulukan

Due to the increase in energy demand, many countries suffer from energy poverty because of insufficient and expensive energy supply. Plans to use alternative power like nuclear power for electricity generation are being revived among developing countries. Decisions for installation of power plants need to be based on careful assessment of future energy supply and demand, economic and financial implications and requirements for technology transfer. Since the problem involves many vague parameters, a fuzzy model should be an appropriate approach for dealing with this problem. This study develops a Fuzzy Multi-Objective Linear Programming (FMOLP) model for solving the nuclear power plant installation problem in fuzzy environment. FMOLP approach is recommended for cases where the objective functions are imprecise and can only be stated within a certain threshold level. The proposed model attempts to minimize total duration time, total cost and maximize the total crash time of the installation project. By using FMOLP, the weighted additive technique can also be applied in order to transform the model into Fuzzy Multiple Weighted-Objective Linear Programming (FMWOLP) to control the objective values such that all decision makers target on each criterion can be met. The optimum solution with the achievement level for both of the models (FMOLP and FMWOLP) are compared with each other. FMWOLP results in better performance as the overall degree of satisfaction depends on the weight given to the objective functions. A numerical example demonstrates the feasibility of applying the proposed models to nuclear power plant installation problem.


Sign in / Sign up

Export Citation Format

Share Document