PROPOSAL TO IRRADIATE INTENTIONALLY DEFECTED MIXED-OXIDE FUEL RODS IN THE ETR M-3 LOOP FACILITY. THE 23 kW/ft TEST SERIES: (BNW-5-1 THROUGH -6).
1972 ◽
1970 ◽
Vol 9
(2)
◽
pp. 233-241
◽
Keyword(s):
Keyword(s):
2013 ◽
Vol 255
◽
pp. 132-137
◽
2000 ◽
Vol 307
(1-2)
◽
pp. 1-9
◽
Failure behavior of plutonium-uranium mixed oxide fuel under reactivity-initiated accident condition
1992 ◽
Vol 188
◽
pp. 154-161
◽