scholarly journals Chapter 23: Combined Heat and Power Evaluation Protocol. The Uniform Methods Project: Methods for Determining Energy Efficiency Savings for Specific Measures

2017 ◽  
Author(s):  
Charles W. Kurnik ◽  
George Simons ◽  
Stephan Barsun
Vestnik MEI ◽  
2020 ◽  
Vol 4 (4) ◽  
pp. 89-97
Author(s):  
Yuriy V. Yavorovsky ◽  
◽  
I′ldar A. Sultanguzin ◽  
Aleksey I. Bartenev ◽  
Stanislava A. Prishchepova ◽  
...  

2014 ◽  
Vol 472 ◽  
pp. 1052-1056
Author(s):  
Chun Hui Liao ◽  
Zhi Gang Zhou ◽  
Jia Ning Zhao

For evaluating the performance of combined heat and power district heating (CHP-DH) system, some thermodynamic indicators of CHP system, include energy efficiency, exergy efficiency, RPES and RAI, are introduced in this paper. Based on two condensed and heating dual purpose plants, the values of these indicators are calculated with different extraction ratio. The results show that RAI and RPES are more reasonable to be used to assess CHP-DH system and there is a minimum extraction ratio for each unit, which is 0.4 for given plants in this paper, to keep CHP-DH beneficial compared with separate heat and power (SHP) system. Besides, the minimum heat demand of CHP-DH system should be larger than the supplied heat correspond to minimum extraction ratio.


Author(s):  
Mario Schmidt ◽  
Hannes Spieth ◽  
Christian Haubach ◽  
Christian Kühne

2010 ◽  
Vol 14 (suppl.) ◽  
pp. 27-40 ◽  
Author(s):  
Milun Babic ◽  
Dusan Gordic ◽  
Dubravka Jelic ◽  
Davor Koncalovic

Today, in Serbia there are several sites with installed combined heat and power facilities. The most of these plants, for various reasons, do not produce electricity. One such plant is "Energetika" (Kragujevac, Serbia), which is primarily a district heating company. Steam generator in the plant has been installed in the 1970's and has worked in one short period of time. Installed steam turbines are 8 MW and 20 MW rated power. ?Energetika? in accordance with the general trend of increasing energy efficiency of production process initiated revitalization of the plant. This revitalization started with a study which approach and the results are briefly given in the paper. All results show that retrofit of facility should be acceptable for the management. Developed scenarios indicate that in the case of the limited resources optimal retrofit should start with smaller turbine (8 MW rated power) then after providing the funds should continue with the retrofit of 20 MW turbine.


2018 ◽  
Vol 20 ◽  
pp. 86-97
Author(s):  
Jan Slad ◽  
Andreas Pickard ◽  
Frank Strobelt

The transition of energy mix in Europe is placing greater focus on energy efficiency. Lawmakers in some of EU countries have already recognized that combined heat and power generation (cogeneration, CHP) can help increase energy efficiency. Targeted promotion and subsidization have raised the cost-effective profitability of cogeneration plants significantly. But how can the economic value of this investment be maximized?


Sign in / Sign up