Preliminary estimates of the total-system cost for the restructured program: An addendum to the May 1989 analysis of the total-system life cycle cost for the Civilian Radioactive Waste Management Program
Keyword(s):
Keyword(s):
2013 ◽
Vol 1
(1)
◽
pp. 9-27
◽
Keyword(s):