LOFT LOCE TRANSIENT THERMAL ANALYSIS FOR 6 IN., 8 IN., 10 IN., and 12 IN. PRIMARY COOLANT BLOWDOWN PIPING
2009 ◽
Vol 8
(3)
◽
pp. 271-280
◽
Keyword(s):
Keyword(s):
Keyword(s):
2018 ◽
Vol 2018
(HiTEC)
◽
pp. 000028-000031
◽
Keyword(s):