Revised FINAL?REPORT NO. 2: INDEPENDENT CONFIRMATORY SURVEY SUMMARY AND RESULTS FOR THE ENRICO FERMI ATOMIC POWER PLANT, UNIT 1, NEWPORT, MICHIGAN (DOCKET NO. 50 16; RFTA 10-004) 2018-SR-02-1
Transactions of the American Institute of Electrical Engineers Part III Power Apparatus and Systems
◽
1959 ◽
Vol 78
(3)
◽
pp. 71-76