scholarly journals Production test IP-520-A in-reactor testing with coolant prepared in the water treatment pilot plant

1962 ◽  
Author(s):  
R.G. Geier
1998 ◽  
Vol 37 (9) ◽  
pp. 105-112 ◽  
Author(s):  
Ana María Ingallinella ◽  
Luis María Stecca ◽  
Martin Wegelin

This paper presents the methodology used for the rehabilitation of the pretreatment stage in a water treatment plant for a village located in Bolivia which has 3500 inhabitants. The treatment plant was initially composed by horizontal-flow roughing filters and slow sand filters, but due to the high contents of colloidal turbidity of the providing source, it did not work properly. A plan of rehabilitation was made which comprised laboratory tests, pilot tests and proposal of modifications based on the results of previous stages. The laboratory tests were made in order to find the optimum conditions to coagulate the raw water. It was found that horizontal-flow roughing filters must be turned into up-flow roughing filters, so a pilot plant was built and was operated for three months in order to find suitable design parameters. The results obtained obtained during the operation of the pilot plant and the proposal of modifications are presented. The results of operation of the final plant, which are also reported, demonstrated the advantages of the up-flow roughing filtration as a pretreatment stage when it is necessary to add chemical products in small treatment plants.


1998 ◽  
Vol 37 (9) ◽  
pp. 121-126 ◽  
Author(s):  
T. Hedberg ◽  
T. A. Wahlberg

The paper describes how waterworks can be upgraded by the use of microbiologically unit operations to make it possible to remove manganese from groundwater and surface water. Pilot plant studies and full-scale plant studies show that conventional oxidants as permanganate may be replaced by biooxidation thus reducing the use of chemicals in water treatment. Water containing high amounts of Fe and/or Mn and organic matter may be difficult to treat and pilot plant studies are therefore recommended. This study shows that one ground waterworks and one surface waterworks succed in removing manganese where previous treatment with permangante had failed.


2010 ◽  
Vol 10 (6) ◽  
pp. 961-968 ◽  
Author(s):  
J. E. Drewes ◽  
J. A. McDonald ◽  
T. Trinh ◽  
M. V. Storey ◽  
S. J. Khan

A pilot-scale plant was employed to validate the performance of a proposed full-scale advanced water treatment plant (AWTP) in Sydney, Australia. The primary aim of this study was to develop a chemical monitoring program that can demonstrate proper plant operation resulting in the removal of priority chemical constituents in the product water. The feed water quality to the pilot plant was tertiary-treated effluent from a wastewater treatment plant. The unit processes of the AWTP were comprised of an integrated membrane system (ultrafiltration, reverse osmosis) followed by final chlorination generating a water quality that does not present a source of human or environmental health concern. The chemical monitoring program was undertaken over 6 weeks during pilot plant operation and involved the quantitative analysis of pharmaceuticals and personal care products, steroidal hormones, industrial chemicals, pesticides, N-nitrosamines and halomethanes. The first phase consisted of baseline monitoring of target compounds to quantify influent concentrations in feed waters to the plant. This was followed by a period of validation monitoring utilising indicator chemicals and surrogate measures suitable to assess proper process performance at various stages of the AWTP. This effort was supported by challenge testing experiments to further validate removal of a series of indicator chemicals by reverse osmosis. This pilot-scale study demonstrated a simplified analytical approach that can be employed to assure proper operation of advanced water treatment processes and the absence of trace organic chemicals.


2013 ◽  
Vol 825 ◽  
pp. 149-152
Author(s):  
Michael Schlömann ◽  
Judith Kipry ◽  
Sophie Mosler ◽  
Anja Poehlein ◽  
Andreas Keller ◽  
...  

Ferrovum is a recently found new genus of acidophilic iron-oxidizing bacteria.Ferrovumspp. dominate the microbial community of a pilot plant for biological mine-water treatment and together with someGallionellarelatives appear to be key players of the process. Isolation ofFerrovumstrains should greatly be facilitated by a new APPW medium. Sequencing of the genome ofFerrovumsp. JA12 so far did not point to any alternative electron donors and also did not reveal genes for nitrogen fixation.


2017 ◽  
Vol 17 (6) ◽  
pp. 1793-1800
Author(s):  
Y. Yan ◽  
M. Carter ◽  
A. Mercer

Abstract Pilot plant testing is invaluable for ascertaining the robustness of water treatment processes against raw water quality events such as turbidity and colour spikes, whether it be for stress testing of an existing process or designing of a new process. Unfortunately, the natural occurrence of such events (particularly colour) can be difficult to predict and commercial humic materials generally fail to closely match the indigenous natural organic matter (NOM) present in the raw water. Therefore, it is highly desirable to be able to simulate NOM event conditions. This paper describes a simple brewing method that we developed and used in our recent pilot plant evaluation of a proposed DAF/Ozone/BAC process for drinking water treatment. Using this method we successfully prepared, by using fallen leaves etc. collected from the local catchment area, large quantities of a concentrated NOM stock solution with its specific ultraviolet absorbance (SUVA), when diluted, very close to the median SUVA of historical NOM events. The brewed solution showed broadly similar NOM characteristics to those of the raw water encountered during the pilot investigation period in terms of molecular weight distribution and fractionation. The coagulation behaviour was also examined for the spiked and non-spiked raw water.