Interim report No. 6 production test No. 106-52-P, graphite expansion: Gun barrel clearance
Mapping Intimacies
◽
10.2172/10162315
◽
1947
◽
Author(s):
W.R. Lewis
◽
R.A. Rohrbacher
Keyword(s):
Production Test
◽
Interim Report
◽
Gun Barrel
Download Full-text
Related Documents
Cited By
References
Interim report III, production test IP-560-A: Half-plant low dichromate, low pH water treatment at C Reactor
10.2172/10152550
◽
1963
◽
Author(s):
R.G. Geier
Keyword(s):
Water Treatment
◽
Low Ph
◽
Production Test
◽
Interim Report
Download Full-text
Technical evaluation of E-N demonstration loading: (Interim report, production test IP-350-C)
10.2172/10151754
◽
1962
◽
Author(s):
R.D. Carter
◽
W.S. Nechodom
◽
R.D. Shimer
◽
G.C. Fullmer
Keyword(s):
Production Test
◽
Interim Report
◽
Technical Evaluation
Download Full-text
Production Test IP-98-I revised tube charge pattern for graphite annealing: Interim Report
10.2172/10177033
◽
1958
◽
Author(s):
S.M. Graves
Keyword(s):
Production Test
◽
Interim Report
Download Full-text
Interim report, Production Test 105-522-E, Examination of pile process tubes removed from 100-C, D and F piles
10.2172/10141738
◽
1955
◽
Author(s):
D.E. Strege
Keyword(s):
Production Test
◽
Interim Report
Download Full-text
Interim report, production test-105-522-E, examination of pile process tube removed from 100-B and 100-H Piles
10.2172/10125261
◽
1955
◽
Author(s):
D.E. Strege
Keyword(s):
Production Test
◽
Interim Report
◽
Process Tube
Download Full-text
Production test-080 - physics tests at D reactor deactivation interim report - experimental data
10.2172/10120733
◽
1967
◽
Author(s):
G.F. Bailey
Keyword(s):
Experimental Data
◽
Production Test
◽
Interim Report
Download Full-text
Interim report on production test 105-2-P: Activity of pile discharge water (retention basin performance)
10.2172/7176027
◽
1945
◽
Author(s):
J O'Connor
◽
J West
Keyword(s):
Water Retention
◽
Production Test
◽
Interim Report
◽
Discharge Water
◽
Retention Basin
Download Full-text
Interim report, Operational physics aspects of supplement A: Production test IP-14-AC, Use of E metal in shield protection
10.2172/10147484
◽
1958
◽
Author(s):
W.L. Bunch
Keyword(s):
Production Test
◽
Interim Report
Download Full-text
Interim report VII, production test IP-549-A half-plant low alum feed water treatment at F Reactor
10.2172/10178591
◽
1964
◽
Author(s):
R.G. Geier
Keyword(s):
Water Treatment
◽
Feed Water
◽
Production Test
◽
Interim Report
Download Full-text
Interim report No. 1 on Production Test 105-407-P -- Pile test of magnesium front dummies
10.2172/10126529
◽
1951
◽
Author(s):
M. Lewis
◽
S. Goldsmith
Keyword(s):
Production Test
◽
Interim Report
◽
Pile Test
Download Full-text