Scaleup tests and supporting research for the development of duct injection technology: Topical report No. 3, Task 3.2: Scale-up testing; Topical report No. 4, Task 3.3: Advanced configurations; Topical report No. 5, Task 3.4: Process controls; Topical report No. 6, Task 3.5: Failure modes; Task 3.6: Waste characterization, Duct Injection Test Facility, Muskingum River Power Plant, Beverly, Ohio
Keyword(s):
Scale Up
◽
1992 ◽
Keyword(s):
1992 ◽
Keyword(s):
1992 ◽
Keyword(s):
Keyword(s):
Keyword(s):
2018 ◽
Vol 336
◽
pp. 154-162
◽
Keyword(s):
2005 ◽
Vol 127
(3)
◽
pp. 230-236
◽
Keyword(s):
2016 ◽
Vol 8
(02)
◽
pp. 79-86
Keyword(s):