scholarly journals RDA-DC-3 and Program X, process tube assembly -- Design criteria (preliminary)

1952 ◽  
Author(s):  
J.F. Nesbitt
2020 ◽  
Vol 1 (2) ◽  
pp. 34-56
Author(s):  
Elyna Amir Sharji ◽  
Lim Yan Peng ◽  
Peter Charles Woods ◽  
Vimala Perumal ◽  
Rose Linda Zainal Abidin

The challenge of transforming an empty space into a gallery setting takes on the concept of place making. A place can be seen as space that has meaning when the setting considers space, surroundings, contents, the people and its activities. This research concentrates on investigating how visitors perceive the space by gauging their sense of place (sense of belonging towards a place). Galleries are currently facing changes in this technological era whereby multiple content and context, space and form, display modes, tools and devices are introduced in one single space. An observational study was done during the Foundation Studies Annual Exhibition held at Faculty of Creative Multimedia, Multimedia University. The exhibition was curated and managed by staff and students of Foundation Year showcasing an array of design works. Analogue and digital presentations of paintings, drawings, sculptures, photography and video works were displayed.. The outcome of this research will contribute towards a better design criteria of place making which affects individual behaviour, social values and attitudes. Characterizing types of visitor experience will improve the understanding of a better design criteria of place making, acceptance, understanding and satisfaction.


PCI Journal ◽  
2007 ◽  
Vol 52 (1) ◽  
pp. 82-100 ◽  
Author(s):  
Neal S. Anderson ◽  
Donald F. Meinheit

Author(s):  
Y. D. Mulia

For S-15 and S-14 wells at South S Field, drilling of the 12-1/4” hole section became the longest tangent hole section interval of both wells. There were several challenges identified where hole problems can occur. The hole problems often occur in the unconsolidated sand layers and porous limestone formation sections of the hole during tripping in/out operations. Most of the hole problems are closely related to the design of the Bottom Hole Assembly (BHA). In many instances, hole problems resulted in significant additional drilling time. As an effort to resolve this issue, a new BHA setup was then designed to enhance the BHA drilling performance and eventually eliminate hole problems while drilling. The basic idea of the enhanced BHA is to provide more annulus clearance and limber BHA. The purpose is to reduce the Equivalent Circulating Density (ECD,) less contact area with formation, and reduce packoff risk while drilling through an unconsolidated section of the rocks. Engineering simulations were conducted to ensure that the enhanced BHA were able to deliver a good drilling performance. As a results, improved drilling performance can be seen on S-14 well which applied the enhanced BHA design. The enhanced BHA was able to drill the 12-1/4” tangent hole section to total depth (TD) with certain drilling parameter. Hole problems were no longer an issue during tripping out/in operation. This improvement led to significant rig time and cost savings of intermediate hole section drilling compared to S-15 well. The new enhanced BHA design has become one of the company’s benchmarks for drilling directional wells in South S Field.


Author(s):  
Jerome Hall ◽  
Daniel Turner

The conception, development, and adoption of early AASHO highway design criteria are documented. Examining the early efforts states used to select a design vehicle and develop horizontal curve design criteria illustrates why AASHO’s leadership was necessary. AASHO’s slow and somewhat haphazard criteria development, and the disparity from state to state, demonstrated the need for a national consensus in highway design parameters. AASHO’s role in providing these criteria is outlined through its initial development of policy booklets, followed by its 1954 publication of the landmark Blue Book. The processes by which nine states adopted the AASHO guidance are briefly reviewed. In several cases, the AASHO policy was embraced immediately, and in others it was accepted slowly as states clung to their independent design processes and only gradually updated their design criteria. A few simple conclusions are drawn about the development and adoption process, particularly as it may relate to tomorrow’s highway design criteria.


Sign in / Sign up

Export Citation Format

Share Document