Intelligent distributed control for nuclear power plants. Final (third annual) technical progress report, September 1991--June 1993 (September 1989--June 1993): Includes no-cost extension period from September 1992--June 1993
Keyword(s):
2003 ◽
1989 ◽
pp. 15-16
2011 ◽
Vol 2011.19
(0)
◽
pp. _ICONE1943-_ICONE1943