Performance of a pilot-scale constructed wetland for stormwater runoff and domestic sewage treatment on the banks of a polluted urban river

2014 ◽  
Vol 69 (7) ◽  
pp. 1410-1418 ◽  
Author(s):  
Weijie Guo ◽  
Zhu Li ◽  
Shuiping Cheng ◽  
Wei Liang ◽  
Feng He ◽  
...  

To examine the performance of a constructed wetland system on stormwater runoff and domestic sewage (SRS) treatment in central east China, two parallel pilot-scale integrated constructed wetland (ICW) systems were operated for one year. Each ICW consisted of a down-flow bed, an up-flow bed and a horizontal subsurface flow bed. The average removal rates of chemical oxygen demand (CODCr), total suspended solids (TSS), ammonia (NH4+-N), total nitrogen (TN) and total phosphorus (TP) were 63.6, 91.9, 38.7, 43.0 and 70.0%, respectively, and the corresponding amounts of pollutant retention were approximately 368.3, 284.9, 23.2, 44.6 and 5.9 g m−2 yr−1, respectively. High hydraulic loading rate (HLR) of 200 mm/d and low water temperatures (<15 °C) resulted in significant decrease in removals for TP and NH4+-N, but had no significant effects on removals of COD and TSS. These results indicated that the operation of this ICW at higher HLR (200 mm/d) might be effective and feasible for TSS and COD removal, but for acceptable removal efficiencies of nitrogen and phosphorus it should be operated at lower HLR (100 mm/d). This kind of ICW could be employed as an effective technique for SRS treatment.

2006 ◽  
Vol 6 (6) ◽  
pp. 43-50 ◽  
Author(s):  
Q. Zhou ◽  
S.L. He ◽  
X.J. He ◽  
X.F. Huang ◽  
B. Picot ◽  
...  

This study focused on the evaluation of performance and mechanisms of a high-rate algal pond system (HRAP System) in nitrogen and phosphorus removal for rural domestic sewage treatment. A pilot scale HRAP System was located at Yangzhu Village, Jiangsu Province, east China, with treatment processes including a septic tank, two stages of HRAPs and an aquatic pond. Results showed that the HRAP System had a good performance in nutrient removal, especially in NH+4-N removal. Total removal efficiencies of COD, TN, NH+4-N and TP were 80, 51.8, 90.2 and 52.1%, respectively. About 61.6% of NH+4-N in the 1st-stage HRAP and 70.9% in the 2nd-stage HRAP were transformed into NO−3-N and NO2−-N through nitrification, and the nitrogen losses via ammonia volatilization was only 2.7% (for 1st-stage HRAP) and 8.8% (for 2nd-stage HRAP). The other 35.7% and 20.3% of NH+4-N removal were achieved by algae assimilation respectively. About 98.0% (for 1st-stage HRAP) and 84.8% (for 2nd-stage HRAP) removal of TN were attributed to algae sedimentation, while those through ammonia volatilization were only 2.0% (for 1st-stage HRAP) and 15.4% (for 2nd-stage HRAP), respectively. Therefore, the main mechanisms of NH+4-N removal in HRAP were nitrification and algae assimilation, and TN was mainly removed by algae sedimentation. About 50.7% (for 1st-stage HRAP) and 53.1% (for 2nd-stage HRAP) of phosphorus in the deposit were organic phosphates respectively, only 20.7% and 27.7% were calcium-bound and magnesium-bound phosphates. The removal mechanism of TP in HRAP could be mainly attributed to algae assimilation in forms of organic phosphate, and chemical precipitation in forms of calcium-bound and magnesium-bound.


2021 ◽  
Author(s):  
Jeyaraman Sethuraman Sudarsan ◽  
Ramasamy Annadurai ◽  
Subramanian Nithiyanantham

Abstract The present study focuses on various aspects of Integrated Constructed Wetland System (ICW) systems with reference to its efficiency, and eco-friendliness in the treatment of domesticwastewater. The biological oxygen demand (BOD) impurity level is in the ranged from 383 mgl-1 to 248 mgl-1, chemical oxygen demand (COD)420 mgl-1 to 340 mgl-1, Total Phosphorus (TP) 10.2 mgl-1 to 5 mgl-1 and Total Nitrogen (TN) 18.9 mgl-1 to 14.8 mgl-1 respectively over a period of one year (SRM University). The influent contaminants are degradable in nature especially with high TP and TN concentrations. Six units of Constructed Wetland System (ICW)units are built with uniform dimensions of 2×1× 0.9 m based on EPA and TVA.The wetland plants chosen areTypha Latifolia and Phragmites Australis. Among the wetland units, Typha oriented units are observed to perform better with a reduction efficiency of 87% for BOD, 86% for COD, 70% for TP and 78% for TN proving that Typha Latifoliais a better aquatic plant for overall wastewater treatment. The removal efficiency increases with time and reaches maximum in 192 hrs. To substantiate the experimental study output, Statistical analysis (ANOVA) and multiple regression analysis with normality plot has carried out. It isevident that thepercentage removal of many parameters especially organic parameters over a period of time in treating with different wetland units is highly significant.


2017 ◽  
Vol 76 (2) ◽  
pp. 434-442 ◽  
Author(s):  
Xuan Cuong Nguyen ◽  
Dinh Duc Nguyen ◽  
Nguyen Thi Loan ◽  
Soon Woong Chang

In this study, a pilot-scale integrated constructed wetland with vertical flow (VF) and horizontal flow (HF) in series was designed and investigated to evaluate sewage wastewater treatment capacity. The VF unit was planted with Canna indica and was 1.2 m long, 1.2 m wide, and 1.2 m high; whereas the HF unit contained Colocasia esculenta and was 3.0 m long, 1.0 m wide, and 1.0 m high. The system was operated under different hydraulic loading rates (HLRs) of 0.1, 0.2, and 0.15 m/d. The effluent concentrations differed as HLR changed, and the means were total suspended solids (TSS): 87 mg/L; biological oxygen demand (BOD5): 31 mg/L; chemical oxygen demand (CODCr): 59 mg/L; ammonium nitrogen (NH4-N): 5.3 mg/L; nitrate nitrogen NO3-N: 8.4 mg/L; total nitrogen (TN): 7.1 mg/L; phosphate (PO4-P): 0.9 mg/L; and total coliforms (TCol): 1,485 most probable number (MPN)/100 mL. The average removal efficiencies for TSS, BOD5, TN, NH4-N, PO4-P, and TCol were 28.3, 74.9, 79, 76.2, 3.6, and 82%, respectively. There were significant differences in the effluent concentrations among the three HLRs (P < 0.05), except for PO4-P.


2015 ◽  
Vol 71 (7) ◽  
pp. 1088-1096 ◽  
Author(s):  
B. Kim ◽  
M. Gautier ◽  
G. Olvera Palma ◽  
P. Molle ◽  
P. Michel ◽  
...  

The aim of this study was to characterize the efficiency of an intensified process of vertical flow constructed wetland having the following particularities: (i) biological pretreatment by trickling filter, (ii) FeCl3 injection for dissolved phosphorus removal and (iii) succession of different levels of redox conditions along the process line. A pilot-scale set-up designed to simulate a real-scale plant was constructed and operated using real wastewater. The influences of FeCl3 injection and water saturation level within the vertical flow constructed wetland stage on treatment performances were studied. Three different water saturation levels were compared by monitoring: suspended solids (SS), total phosphorus (TP), dissolved chemical oxygen demand (COD), ammonium, nitrate, phosphate, iron, and manganese. The results confirmed the good overall efficiency of the process and the contribution of the trickling filter pretreatment to COD removal and nitrification. The effects of water saturation level and FeCl3 injection on phosphorus removal were evaluated by analysis of the correlations between the variables. Under unsaturated conditions, good nitrification and no denitrification were observed. Under partly saturated conditions, both nitrification and denitrification were obtained, along with a good retention of SSs. Finally, under saturated conditions, the performance was decreased for almost all parameters.


2016 ◽  
Vol 74 (7) ◽  
pp. 1509-1517 ◽  
Author(s):  
Linan Zhu ◽  
Hailing He ◽  
Chunli Wang

The hybrid membrane bioreactor (HMBR) has been applied in ship domestic sewage treatment under high volumetric loading for ship space saving. The mechanism and influence factors on the efficiency, including hydraulic retention time (HRT), dissolved oxygen (DO) of chemical oxygen demand (COD) removal were investigated. The HMBR's average COD removal rate was up to 95.13% on volumetric loading of 2.4 kgCOD/(m3•d) and the COD concentration in the effluent was 48.5 mg/L, far below the International Maritime Organization (IMO) discharge standard of 125 mg/L. DO had a more remarkable effect on the COD removal efficiency than HRT. In addition, HMBR revealed an excellent capability of resisting organics loading impact. Within the range of volumetric loading of 0.72 to 4.8 kg COD/(m3•d), the effluent COD concentration satisfied the discharge requirement of IMO. It was found that the organics degradation in the aeration tank followed the first-order reaction, with obtained kinetic parameters of vmax (2.79 d−1) and Ks (395 mg/L). The original finding of this study had shown the effectiveness of HMBR in organic contaminant degradation at high substrate concentration, which can be used as guidance in the full scale of the design, operation and maintenance of ship domestic sewage treatment devices.


2020 ◽  
Vol 80 (2) ◽  
pp. 431-436 ◽  
Author(s):  
A. S. Bertan ◽  
F. P. Baumbach ◽  
I. B. Tonial ◽  
T. S. Pokrywiecki ◽  
E. Düsman

Abstract Whereas the effects of the substances found in domestic sewage on live organisms is important to evaluate the use of plants to remove pollutants from the environment. The objective of this study was to assess the phytoremediation activity of Allium cepa L. (onion) roots exposed to raw sewage, as well as the acute toxic activity of this effluent for the bioindicators A. cepa, through a cytotoxicity test, and Artemia salina L., through a mortality/immobility test. The physicochemical assessments of the sewage were conducted in two scenarios: immediately after collection and after being in contact with onion roots (phytoremediation) for 24 hours. The physicochemical data indicate there was a reduction in nitrogen and phosphorus levels and in biochemical oxygen demand in sewage treated. The results from the cytotoxicity test with A. cepa indicated a reduction in the mitotic cell divisions of the onions treated with the raw sewage. The mortality/immobility test with A. salina indicated that the concentrations with 50 and 100% of raw sewage induced the mortality of the nauplii. Thus, the data suggest new studies that seek greater efficiency, efficacy and viability of onion phytoremediation.


2020 ◽  
Vol 81 (9) ◽  
pp. 2023-2032
Author(s):  
Jingqing Gao ◽  
Lei Yang ◽  
Rui Zhong ◽  
Yong Chen ◽  
Jingshen Zhang ◽  
...  

Abstract The environmental problems related to rural domestic sewage treatment are becoming increasingly serious, and society is also concerned about them. A baffled vertical flow constructed wetland (BVFCW) is a good choice for cleaning wastewater. Herein, a drinking-water treatment sludge-BVFCW (D-BVFCW) parallel with ceramsite-BVFCW (C-BVFCW) planted with Oenanthe javanica (O. javanica) to treat rural domestic sewage was investigated, aiming to compare nitrogen and phosphorus removal efficiency in different BVFCWs. A removal of 23.9% NH4+-N, 24.6% total nitrogen (TN) and 76.7% total phosphorus (TP) occurred simultaneously in the D-BVFCW; 56.4% NH4+-N, 60.8% TN and 55.2% TP respectively in the C-BVFCW. The root and plant height increased by an average of 7.9 cm and 8.3 cm, respectively, in the D-BVFCW, and by 0.7 cm and 1.1 cm, respectively, in the C-BVFCW. These results demonstrate that the D-BVFCW and C-BVFCW have different effects on the removal of N and P. The D-BVFCW mainly removed P, while C-BVFCW mainly removed N.


Water ◽  
2019 ◽  
Vol 11 (5) ◽  
pp. 1100 ◽  
Author(s):  
Ya-Wen Wang ◽  
Hua Li ◽  
You Wu ◽  
Yun Cai ◽  
Hai-Liang Song ◽  
...  

Rural runoff with abundant nutrients has become a great threat to aquatic environment. Hence, more and more attention has been focused on nutrients removal. In this study, an improved aerobic/anaerobic/aerobic three-stage water spinach constructed wetland (O-A-O-CW) was used to improve the removal of nitrogen and phosphorus of rural runoff. The removal rate of the target pollutants in O-A-O-CW was compared with the common matrix flow wetland as well as the no-plant wetland. The results showed that the O-A-O-CW significantly increased the chemical oxygen demand, total phosphorus, ammonium-nitrogen, nitrate, and total nitrogen removal rate, and the corresponding removal rate was 55.85%, 81.70%, 76.64%, 89.78%, and 67.68%, respectively. Moreover, the best hydraulic condition of the wetland, including hydraulic retention time and hydraulic loading, was determined, which were 2 days and 0.45 m3·m−2·day−1, respectively. Furthermore, the removal mechanism of the constructed wetland was thoroughly studied, which included the adsorption of nitrogen and phosphorus by the matrix and water spinach, and the nitrification and denitrification by the bacteria. The results demonstrated that the mechanisms of nitrogen removal in the new type wetland were principally by the nitrification and denitrification process. Additionally, adsorption and precipitation by the matrix are mainly responsible for phosphorus removal. These results suggested that the new O-A-O-CW can efficiently removal nutrients and enhance the water quality of the rural runoff.


Sign in / Sign up

Export Citation Format

Share Document