The aim of this study was to evaluate how routinely performed phosphorus release tests could be used when modelling enhanced biological phosphorus removal (EBPR) using activated sludge models such as ASM2d. A pilot plant with an extensive analysis programme was used as basis for the simulations. Without any calibration the prediction of phosphorus removal was poor and the initial release rates from the simulations were not similar to those found from the laboratory tests. A period with low organic loading was chosen as a calibration period. In this period averages of daily influent measurements were used as influent parameters. First, calibration was performed in order to fit effluent COD and MLVSS in the sludge. Next, the phosphorus content in the sludge was decreased to the measured level by decreasing the fermentation rate. Finally, the initial phosphorus release rate was calculated from a simulated batch test and the PHA uptake rate was increased to fit this release rate with the average initial rates from laboratory batch tests performed during the period. The calibrated model was verified with data from the subsequent period where acetate was dosed.

1994 ◽  
Vol 30 (6) ◽  
pp. 263-269 ◽  
Author(s):  
T. Kuba ◽  
A. Wachtmeister ◽  
M. C. M. van Loosdrecht ◽  
J. J. Heijnen

The effect of nitrate on phosphorus release by biological phosphorus removing organisms has been studied. Denitrifying (DPB) or aerobic phosphorus removing bacteria were enriched in an anaerobic-anoxic or anaerobic-aerobic sequencing batch reactor (SBR). The enrichment sludges were used in batch tests, in which the effect of simultaneous presence of substrate (HAc) and nitrate was studied on the phosphorus release. It could be concluded that a reduction of the phosphorus release by nitrate in biological phosphorus removal systems is partly due to the presence of DPB, which utilize HAc for denitrification, not for phosphorus release. PHB (poly-β-hydroxybutyrate) was always produced and phosphorus was released by DPB sludge when nitrate and HAc were simultaneously present. The reducing power (NADH2) and the energy (ATP) for this process seemed to be obtained from HAc oxidation by nitrate as well as from polyphosphate degradation. After removal of the HAc, PHB degradation and phosphorus uptake occurred.


1985 ◽  
Vol 17 (11-12) ◽  
pp. 297-298 ◽  
Author(s):  
Takao Murakami ◽  
Atsushi Miyairi ◽  
Kazuhiro Tanaka

In Japan various biological phosphorus removal processes have recently been researched by laboratory or pilot plant scale studies and most of them have shown good results. Based on these results, the Japan Sewage Works Agency has conducted a full scale study of the biological phosphorus removal process from June 1982 until February 1983, which was the first full scale operation of this process in Japan. The main purpose of the study was to evaluate phosphorus removal efficiency and also nitrogen removal efficiency of the process and in addition, to ascertain the important operating factors of the process. For the study a treatment train of a large scale sewage treatment plant was remodelled. The aeration tank of 3.825 m3 volume was divided into four equal cells. The whole train including return sludge line was operated entirely independently of the other trains. During the experiment the train was operated under two different modes, Mode 1 and Mode 2. In Mode 1, the train was operated as an A/O process, the first cell of the aeration tank being anaerobic and the other cells oxic. In Mode 2, the train was operated as a Modified Phoredox process. In this case, the first cell was anaerobic, but the second cell was anoxic and nitrified liquor was returned to it from the end of the oxic cells. Mode 1 and Mode 2 were further divided into many ‘runs' and the flow rate varied between 12,550 m3 d−1 and 25,270 m3 d−1 , corresponding to retention times of 7.3 hours and 3.6 hours, respectively. Throughout the experimental period the mean value of influent (primary effluent) total-P concentration was 3.38 mg 1−1 , and that of the final effluent was 0.47 mg 1−1 . A cumulated frequency curve of the data showed that about 93% of measured effluent total-P was below 1.0 mg l−1 . Therefore, it can be concluded that with these influent total-P levels, biological phosphorus removal processes can sufficiently satisfy the effluent standard of 1 mg 1−1 total-P. Even when the process was operated as a Modified Phoredox Process, no obstruction to phosphorus removal because of nitrification was observed and phosphorus removal remained good. However, since the sewage treatment plant treated influent from a combined sewerage system, phosphorus removal was sometimes affected by heavy rainfalls. In such cases phosphorus release in the anaerobic cell was insufficient because of increased influent NOx concentration and accordingly increased denitrification level in the anaerobic cell. Therefore, as a result, enhanced phosphorus uptake in the following cells could not be observed. Higher process stability can be expected if an effective countermeasure to high influent NOx concentration can be made. Influence of flow rate fluctuation on the process was also studied. The treatment train was operated for a week under a daily flow rate fluctuation pattern which ranged between 460 m3 hr−1 and 820 m3 hr−1 . Nevertheless, the effluent total-P concentration showed no increase and stayed constantly lower than 0.5 mg 1−1. The oxidation reduction potential (ORP) was an effective control index to evaluate the degree of phosphorus release in the anaerobic cell. Water temperature did not affect phosphorus release and uptake rates.


2003 ◽  
Vol 48 (1) ◽  
pp. 87-94 ◽  
Author(s):  
B. Lesjean ◽  
R. Gnirss ◽  
C. Adam ◽  
M. Kraume ◽  
F. Luck

The enhanced biological phosphorus removal (EBPR) process was adapted to membrane bioreactor (MBR) technology. One bench-scale plant (BSP, 200-250 L) and two pilot plants (PPs, 1,000-3,000 L each) were operated under several configurations, including pre-denitrification and post-denitrification without addition of carbon source, and two solid retention times (SRT) of 15 and 26 d. The trials showed that efficient Bio-P removal can be achieved with MBR systems, in both pre- and post-denitrification configurations. EBPR dynamics could be clearly demonstrated through batch-tests, on-line measurements, profile analyses, P-spiking trials, and mass balances. High P-removal performances were achieved even with high SRT of 26 d, as around 9 mgP/L could be reliably removed. After stabilisation, the sludge exhibited phosphorus contents of around 2.4%TS. When spiked with phosphorus (no P-limitation), P-content could increase up to 6%TS. The sludge is therefore well suited to agricultural reuse with important fertilising values. Theoretical calculations showed that increased sludge age should result in a greater P-content. This could not be clearly demonstrated by the trials. This effect should be all the more significant as the influent is low in suspended solids.


2003 ◽  
Vol 47 (11) ◽  
pp. 115-122 ◽  
Author(s):  
J. Manga ◽  
J. Ferrer ◽  
A. Seco ◽  
F. Garcia-Usach

A mechanistic mathematical model for nutrient and organic matter removal was used to describe the behavior of a nitrification denitrification enhanced biological phosphorus removal (NDEBPR) system. This model was implemented in a user-friendly software DESASS (design and simulation of activated sludge systems). A 484-L pilot plant was operated to verify the model results. The pilot plant was operated for three years over three different sludge ages. The validity of the model was confirmed with data from the pilot plant. Also, the utility of DESASS as a valuable tool for designing NDEBPR systems was confirmed.


2002 ◽  
Vol 45 (6) ◽  
pp. 61-76 ◽  
Author(s):  
H. Siegrist ◽  
L. Rieger ◽  
G. Koch ◽  
M. Kühnl ◽  
W. Gujer

An additional module for the prediction of enhanced biological phosphorus removal is presented on the basis of a calibrated version of ASM3. The module uses modified processes from ASM2d but neglects the fermentation of readily degradable substrate. Biomass decay is modeled in the form of endogenous respiration as in ASM3. The glycogen pool and biologically induced P-precipitation is not taken into account. The module was systematically calibrated with experimental data from various batch experiments, a full-scale WWTP and a pilot plant treating Swiss municipal wastewater. A standard parameter set allowed all data to be simulated.


1984 ◽  
Vol 16 (10-11) ◽  
pp. 173-185 ◽  
Author(s):  
D Malnou ◽  
M Meganck ◽  
G M Faup ◽  
M du Rostu

The biological phosphorus removal phenomenon has been studied in a modified “Phoredox” type pilot plant. The interpretation of the results obtained was facilitated by batch tests on the sludge. The influence of the duration of anaerobiosis, the presence of nitrates and various organic substances in the anaerobic zone were thus studied successively. The results obtained tend to confirm the hypothesis that biological phosphorus removal is due primarily to the bacterial strain Acinetobacter. Microbiological examination of the sludge has revealed the presence of these bacteria and that of acidogenic bacteria producing volatile fatty acids promoting the growth of Acinetobacter. Pure culture tests have confirmed the possibility of a greater phosphorus storage capability of Acinetobacter.


1993 ◽  
Vol 28 (10) ◽  
pp. 377-385 ◽  
Author(s):  
K. Moriyama ◽  
M. Takahashi ◽  
Y. Harada

Some experiences concerning a retrofit design and operation for nutrients removal in small extended aeration plants are presented. In this study a new biological phosphorus removal process as well as a biological nitrogen removal process based on a sequential oxic-anoxic-oxic process is investigated. The denitrification in the first oxic zone has a high removing effect for nitrogen, and the oxidation reduction potential (ORP) value and dissolved oxygen (DO) concentration are useful indexes to maintain the optimum conditions of the first oxic zone for simultaneous denitrification. It is verified that the simultaneous denitrification can alleviate the alkalinity deficit problem against full nitrification by a stoichiometric analysis of alkalinity throughout the entire process. Additionally, a biological phosphorus removal process which uses a sludge blanket zone of secondary settling tank for phosphorus release is proposed.