Dynamic simulation for upgrading of wastewater treatment plants—an assessment of treatment plant performance with regard to the EC-directive concerning urban wastewater treatment

1998 ◽  
Vol 37 (9) ◽  
pp. 73-79
Author(s):  
A. Sintic ◽  
T. Rolfs ◽  
M. Freund ◽  
E. Dorgeloh

This paper shows how the dynamic simulation of municipal wastewater treatment plants can be used for assessing the performance of a plant under different legal requirements. In this study, the situation is described, when it was uncertain, how the requirements of the German law (ARA-V 1991) would be adapted to the requirements given by the EC-directive concerning urban wastewater treatment (EC directive, 1991). The requirements of these two are compared to each other. A simulation study is described, in which the future results of a plant to be extended are calculated for the period of one year. It is shown that, concerning the effluent concentrations of ammonia and total nitrogen, this plant will be able to meet both laws.

1999 ◽  
Vol 40 (7) ◽  
pp. 55-65 ◽  
Author(s):  
Mohamed F. Hamoda ◽  
Ibrahim A. Al-Ghusain ◽  
Ahmed H. Hassan

Proper operation of municipal wastewater treatment plants is important in producing an effluent which meets quality requirements of regulatory agencies and in minimizing detrimental effects on the environment. This paper examined plant dynamics and modeling techniques with emphasis placed on the digital computing technology of Artificial Neural Networks (ANN). A backpropagation model was developed to model the municipal wastewater treatment plant at Ardiya, Kuwait City, Kuwait. Results obtained prove that Neural Networks present a versatile tool in modeling full-scale operational wastewater treatment plants and provide an alternative methodology for predicting the performance of treatment plants. The overall suspended solids (TSS) and organic pollutants (BOD) removal efficiencies achieved at Ardiya plant over a period of 16 months were 94.6 and 97.3 percent, respectively. Plant performance was adequately predicted using the backpropagation ANN model. The correlation coefficients between the predicted and actual effluent data using the best model was 0.72 for TSS compared to 0.74 for BOD. The best ANN structure does not necessarily mean the most number of hidden layers.


2019 ◽  
Vol 81 (7) ◽  
pp. 1365-1374 ◽  
Author(s):  
Matteo Giberti ◽  
Recep Kaan Dereli ◽  
Damian Flynn ◽  
Eoin Casey

Abstract Demand response (DR) programmes encourage energy end users to adjust their consumption according to energy availability and price. Municipal wastewater treatment plants are suitable candidates for the application of such programmes. Demand shedding through aeration control, subject to maintaining the plant operational limits, could have a large impact on the plant DR potential. Decreasing the aeration intensity may promote the settling of the particulate components present in the reactor mixed liquor. The scope of this study is thus to develop a mathematical model to describe this phenomenon. For this purpose, Benchmark Simulation Model No.1 was extended by implementing a dual-layer settling model in one of the aerated tanks and combining it with biochemical reaction kinetic equations. The performance of this extended model was assessed in both steady-state and dynamic conditions, switching the aeration system off for 1 hour during each day of simulation. This model will have applications in the identification of potential benefits and issues related to DR events, as well as in the simulation of the plant operation where aerated tank settling is implemented.


1994 ◽  
Vol 30 (4) ◽  
pp. 211-214 ◽  
Author(s):  
E. Brands ◽  
M. Liebeskind ◽  
M. Dohmann

This study shows a comparison of important parameters for dynamic simulation concerning the highrate and low-rate activated sludge tanks of several municipal wastewater treatment plants. The parameters for the dynamic simulation of the single-stage process are quite well known, but parameters for the high-ratellow-rate activated sludge process are still missi ng, although a considerable number of wastewater treatment plants are designed and operated that way. At present any attempt to simulate their operation is restricted to the second stage due to missing data concerning growth rate, decay rate, yield coefficient and others.


2021 ◽  
Vol 6 (4) ◽  
pp. 244-250
Author(s):  
Serhii Protsenko ◽  
◽  
Mykola Kizyeyev ◽  
Olha Novytska ◽  
◽  
...  

The possibility of increasing the efficiency of municipal wastewater treatment plant (WWTP) operation by changing the flow diagram of biological wastewater treatment in aeration tanks at minimum expenses for their reconstruction is shown in the paper on the example of one of the regional centres of Ukraine. The technology of nitri-denitrification of wastewater according to the flow diagram of the two-stage modified Ludzak-Ettinger process is offered for the considered conditions. The distribution of wastewater flows and internal nitrate recycling between the individual stages of this flow diagram has been optimized in order to minimize the residual content of total nitrogen in the treated effluents. Computer dynamic modelling of biochemical processes has proved the high efficiency and reliability of the flow diagram proposed by the authors.


2008 ◽  
Vol 57 (10) ◽  
pp. 1487-1493 ◽  
Author(s):  
S. Lindtner ◽  
H. Schaar ◽  
H. Kroiss

During a six-year period the Austrian Benchmarking System was developed. The main objectives of this benchmarking system are the development of process indicators, identification of best performance and determination of cost reduction potentials. Since 2004 this system is operated via an internet platform and automated to a large extent. Every year twenty to thirty treatment plants use the web-based access to this benchmarking platform. The benchmarking procedure comprises data acquisition, data evaluation including reporting and organised exchange of experience for the treatment plant managers. The process benchmarking method links the real costs with four defined main processes and two support processes. For wastewater treatment plants with a design capacity >100,000 PE these processes are further split up into sub-processes. For each (sub-) process the operating costs are attributed to six cost elements. The specific total yearly costs and the yearly operating costs of all (sub-)processes are related to the measured mean yearly pollution load of the plant expressed in population equivalents (PE110: 110 gCOD/d corresponding to 60 g BOD5/d)). The specific capital costs are related to the design capacity (PE). The paper shows the benchmarking results of 6 Austrian plants with a design capacity >100,000 PE representing approximately 30% of the Austrian municipal wastewater treatment plant capacity.


2018 ◽  
Vol 4 (12) ◽  
pp. 1988-1996 ◽  
Author(s):  
Yan He ◽  
Yishuang Zhu ◽  
Jinghan Chen ◽  
Minsheng Huang ◽  
Guohua Wang ◽  
...  

The tense deficiency of available land resources is becoming one of the bottlenecks in dealing with wastewater treatment plant (WWTP) management issues.


Water ◽  
2019 ◽  
Vol 11 (3) ◽  
pp. 423 ◽  
Author(s):  
Encarnación Moral Pajares ◽  
Leticia Gallego Valero ◽  
Isabel Román Sánchez

The principle of cost recovery established by the Water Framework Directive underlines the need for tax rates, which can raise enough revenue to finance the cost of treatments applied to wastewater. The objective of this research is to gain an understanding the different types of charges related to urban wastewater treatment that can be levied by the authorities responsible for this service. This paper also aims to determine whether these taxes contribute to guaranteeing the economic feasibility of the wastewater treatment plants. The proposed methodological approach is applied to 18 municipalities of a province in southern Europe in 2017. The results confirm that in most of these cases, the taxes levied do not guarantee adequate tax revenues to cover the running, maintenance and investment costs of municipal wastewater treatment plants. This situation leads to a lack of financial self-sufficiency in the wastewater management service, meaning that the imbalance between income and expenditure has to be covered by government subsidies. The results of this study will help guide authorities around the world that are in charge of managing urban wastewater treatment services.


Membranes ◽  
2020 ◽  
Vol 10 (12) ◽  
pp. 421
Author(s):  
Dimitra C. Banti ◽  
Michail Tsangas ◽  
Petros Samaras ◽  
Antonis Zorpas

Membrane bioreactor (MBR) systems are connected to several advantages compared to the conventional activated sludge (CAS) units. This work aims to the examination of the life cycle environmental impact of an MBR against a CAS unit when treating municipal wastewater with similar influent loading (BOD = 400 mg/L) and giving similar high-quality effluent (BOD < 5 mg/L). The MBR unit contained a denitrification, an aeration and a membrane tank, whereas the CAS unit included an equalization, a denitrification, a nitrification, a sedimentation, a mixing, a flocculation tank and a drum filter. Several impact categories factors were calculated by implementing the Life Cycle Assessment (LCA) methodology, including acidification potential, eutrophication potential, global warming potential (GWP), ozone depletion potential and photochemical ozone creation potential of the plants throughout their life cycle. Real data from two wastewater treatment plants were used. The research focused on two parameters which constitute the main differences between the two treatment plants: The excess sludge removal life cycle contribution—where GWPMBR = 0.50 kg CO2-eq*FU−1 and GWPCAS = 2.67 kg CO2-eq*FU−1 without sludge removal—and the wastewater treatment plant life cycle contribution—where GWPMBR = 0.002 kg CO2-eq*FU−1 and GWPCAS = 0.14 kg CO2-eq*FU−1 without land area contribution. Finally, in all the examined cases the environmental superiority of the MBR process was found.


Sign in / Sign up

Export Citation Format

Share Document