Phosphorus removal by the use of apatite in constructed wetlands: Design recommendations

2011 ◽  
Vol 6 (3) ◽  
Author(s):  
P. Molle ◽  
S. Martin ◽  
D. Esser ◽  
S. Besnault ◽  
C. Morlay ◽  
...  

Phosphorus (P) removal in constructed wetlands (CWs) has received particular attention during the last decades by using specific materials which promote P adsorption/precipitation phenomena. Recent studies have shown an interest in using apatite materials to promote P precipitation onto their surface. About ten years of experiments at different scales (laboratory, pilot, full scale) have passed. The process is now open in France. This paper presents the first design recommendations according to the apatite mineral quality and treatment outlet requirements. Kinetics and their evolution with the material saturation degree are presented based on the k-C* model. The process can achieve 1 mgP.l−1 for long term while using surface P removal filter area of 0.5 m2.p.e.−1. With a low land footprint and high P removal efficiency, the interest of the process also result in the orthophosphates accumulation on a phosphate mineral which makes easier to reuse phosphorus from wastewater once saturated

2011 ◽  
Vol 63 (8) ◽  
pp. 1629-1637 ◽  
Author(s):  
N. Harouiya ◽  
S. Martin Rue ◽  
S. Prost-Boucle ◽  
A. Liénar ◽  
D. Esser ◽  
...  

Phosphorus (P) removals in constructed wetlands (CWs) have received particular attention in recent decades by using specific materials which promote adsorption/precipitation mechanisms. Recent studies have shown interest in using apatite materials to promote P precipitation onto the particle surface. As previous trials were mainly done by lab experiments, this present study aims to evaluate the real potential of apatites to remove P from wastewater in pilot units and a full-scale plant over a 2 year period. P retention kinetics of two qualities of apatites are presented and discussed. In this work apatite appears to have high retention capacity (>80% of P removal) and is still an interesting way for P removal in CWs for limiting the risk of eutrophication downstream of small communities. Nevertheless, the apatite quality appears to be of great importance for a reliable and long term P removal. The use of materials with low content of apatite mineral (40–50%) seems to be not economically relevant.


2010 ◽  
Vol 61 (7) ◽  
pp. 1793-1800 ◽  
Author(s):  
Dwight Houweling ◽  
Yves Comeau ◽  
Imre Takács ◽  
Peter Dold

The overall potential for enhanced biological phosphorus removal (EBPR) in the activated sludge process is constrained by the availability of volatile fatty acids (VFAs). The efficiency with which polyphosphate accumulating organisms (PAOs) use these VFAs for P-removal, however, is determined by the stoichiometric ratios governing their anaerobic and aerobic metabolism. While changes in anaerobic stoichiometry due to environmental conditions do affect EBPR performance to a certain degree, model-based analyses indicate that variability in aerobic stoichiometry has the greatest impact. Long-term deterioration in EBPR performance in an experimental SBR system undergoing P-limitation can be predicted as the consequence of competition between PAOs and GAOs. However, the observed rapid decrease in P-release after the change in feed composition is not consistent with a gradual shift in population.


2001 ◽  
Vol 44 (11-12) ◽  
pp. 85-92 ◽  
Author(s):  
M.A. Lund ◽  
P.S. Lavery ◽  
R.F. Froend

A constructed wetland design, consisting of 16 repeating cells was proposed for Henley Brook (Perth, Western Australia) to optimise the removal of FRP from urban stormwater. Three replicate experimental ponds (15×5 m), were constructed to represent at a 1:1 scale a single cell from this design. Three 5 m zones of each pond were sampled: shallow (0.3 m) vegetated (Schoenoplectus validus) inflow and outflow zones and a deeper (1 m), V-shaped central zone. In 1998/99, inflows and outflow waters were intensively sampled and analysed for FRP and Total P. In addition, all major pools of P (plants, sediment) within the ponds, and important P removal processes (benthic flux, uptake by biofilm and S. validus) were quantified. A removal efficiency of 5% (1998) and 10% (1999) was obtained for FRP. Initial uptake was mainly in plant biomass, although the sediment became an increasingly important sink. Benthic flux experiments showed that anoxia did not cause release of P from sediments, indicating that most of the P was bound as apatite rather than associated with Fe or Mn. The highly coloured waters were believed responsible for the very low biofilm biomass recorded (<1 g.m-2). We have demonstrated that constructed wetlands can be effective for removing FRP immediately after construction, although their long-term removal capacity needs further research.


1994 ◽  
Vol 29 (7) ◽  
pp. 153-156 ◽  
Author(s):  
D. Wedi ◽  
P. A. Wilderer

Most of the fundamental processes responsible for enhanced biological phosphorus removal (EBPR) were obtained through laboratory tests under defined conditions with pure or enriched cultures. Acinetobacter sp. was identified as the most important group of bacteria responsible for bio-P removal. Full scale data showed, however, that laboratory results do not match full scale results well enough. There is a lack of data on the effects of sub-optimal process conditions such as inadequate availability of volatile fatty acids (VFA), high nitrate recycle, storm water inflow or low temperatures. In this paper the results of full scale experiments on P-release are presented and compared with theoretical values. Measurements at a full scale Phoredox-system showed a surprisingly low P-release in the anaerobic reactor. Only 4 to 10% of the phosphorus in the activated sludge was released in the bulk liquid. With laboratory batch-tests, a maximum of 20% of the P in the sludge could be released. It is assumed that under the prevailing process conditions either the fraction of Acinetobacter sp. was very small, or bacteria other than Acinetobacter sp. were responsible for the P-removal, or most of the phosphorus was bound chemically but mediated by biological processes.


2003 ◽  
Vol 48 (1) ◽  
pp. 87-94 ◽  
Author(s):  
B. Lesjean ◽  
R. Gnirss ◽  
C. Adam ◽  
M. Kraume ◽  
F. Luck

The enhanced biological phosphorus removal (EBPR) process was adapted to membrane bioreactor (MBR) technology. One bench-scale plant (BSP, 200-250 L) and two pilot plants (PPs, 1,000-3,000 L each) were operated under several configurations, including pre-denitrification and post-denitrification without addition of carbon source, and two solid retention times (SRT) of 15 and 26 d. The trials showed that efficient Bio-P removal can be achieved with MBR systems, in both pre- and post-denitrification configurations. EBPR dynamics could be clearly demonstrated through batch-tests, on-line measurements, profile analyses, P-spiking trials, and mass balances. High P-removal performances were achieved even with high SRT of 26 d, as around 9 mgP/L could be reliably removed. After stabilisation, the sludge exhibited phosphorus contents of around 2.4%TS. When spiked with phosphorus (no P-limitation), P-content could increase up to 6%TS. The sludge is therefore well suited to agricultural reuse with important fertilising values. Theoretical calculations showed that increased sludge age should result in a greater P-content. This could not be clearly demonstrated by the trials. This effect should be all the more significant as the influent is low in suspended solids.