Rapid Start-Up of Photo-Granule Process in a Photo-Sequencing Batch Reactor Under Low Aeration Condition: Impact of Inoculum Ags Size

2021 ◽  
Author(s):  
Bing Zhang ◽  
Wei Li ◽  
Wenxin Shi ◽  
Piet N.L. Lens
2009 ◽  
Vol 60 (4) ◽  
pp. 1049-1054 ◽  
Author(s):  
S. López–Palau ◽  
J. Dosta ◽  
J. Mata-Álvarez

Aerobic granular sludge was cultivated in a sequencing batch reactor (SBR) in order to remove the organic matter present in winery wastewater. The formation of granules was performed using a synthetic substrate. The selection parameter was the settling time, as well as the alternation of feast-famine periods, the air velocity and the height/diameter ratio of the reactor. After 10 days of operation under these conditions, the first aggregates could be observed. Filamentous bacteria were still present in the reactor but they disappeared progressively. During the start-up, COD loading was increased from 2.7 to 22.5 kg COD/(m3 day) in order to obtain a feast period between 30 and 60 minutes. At this point, granules were quite round, with a particle diameter between 3.0 and 4.0 mm and an average density of 6 g L−1. After 120 days of operation, synthetic media was replaced by real winery wastewater, with a COD loading of 6 kg COD/(m3 day). The decrease of the organic load implied a reduction of the aggregate diameter and a density increase up to 13.2 g L−1. The effluent was free of organic matter and the solids concentration in the reactor reached 6 g VSS L−1.


2012 ◽  
Vol 66 (3) ◽  
pp. 543-548
Author(s):  
Binbin Wang ◽  
Shunlian Liu ◽  
Hongmei Zhao ◽  
Xinyan Zhang ◽  
Dangcong Peng

Variations of extracellular polymeric substances (EPS) and its components with sludge granulation were examined in a lab-scale sequencing batch reactor (SBR) which was fed with sodium nitrate and sodium acetate. Ultrasonication plus cation exchange resin (CER) were used as the EPS extraction method. Results showed that after approximately 90 d cultivation, the sludge in the reactor was almost granulated. The content of extracellular polysaccharides increased from 10.36 mg/g-VSS (volatile suspended solids) at start-up with flocculent sludge to 23.18 mg/g-VSS at 91 d with matured granular sludge, while the content of extracellular proteins were almost unchanged. Polysaccharides were the major components of EPS in anoxic granular sludge, accounting for about 70.6–79.0%, while proteins and DNA accounted for about 16.5–18.9% and 4.6–9.9%, respectively. It is proposed that EPS play a positive role in anoxic sludge granulation and polysaccharides might be strongly involved in aggregation of flocs into granules.


2012 ◽  
Vol 65 (5) ◽  
pp. 840-844 ◽  
Author(s):  
D. Wu ◽  
T. Hao ◽  
H. Lu ◽  
H. K. Chui ◽  
M. C. M. van Loosdrecht ◽  
...  

This study explored a sulfur cycle-associated biological phosphorus (P) removal process in a covered and non-aerated sequencing batch reactor (SBR) fed with volatile fatty acid (VFA) and sulfate separately. During the 60-day start-up, both phosphate release and uptake rates increased, while poly-phosphate cyclically increased and decreased accordingly. The P-release and P-uptake rates were associated with VFA uptake and sulfate reduction. The average ratio of potassium to phosphate during the P-uptake and P-release was also determined to be 0.29–0.31 mol K/mol P, which is close to a reported value (0.33) for biological phosphorus removal. All this evidence confirmed there was biological P removal in this reactor, in which metabolism could be different from conventional biological P removal.


2012 ◽  
Vol 610-613 ◽  
pp. 1454-1458
Author(s):  
Ming Fen Niu ◽  
Hong Jing Jiao ◽  
Li Xu ◽  
Yan Yu ◽  
Jian Wei

A2N is two-sludge system, by using the method that first bringing up the cultivation of denitrifying phosphorus removing bacteria (DPB) and nitrification biofilm separately then connecting them, which can start up A2N system successfully. Nitrification biofilm was cultivated in a sequencing batch reactor (SBR). After 30 days, NH4+-N effluent concentration steadily stayed below 0.5mg·L-1.In another SBR, the activated sludge for the enrichment of DPB is from the anaerobic tank, which was firstly operated under anaerobic/aerobic (A/O) condition. After 20 days, PAOs was successfully enriched. Then, the activated sludge was conducted under anaerobic/anoxic/aerobic (A/A/O) condition, maintaining the anaerobic time, gradually increased anoxic time and induced aerobic time. After 30 days DPB was successfully enriched, two phases totally take 50 days. The removal efficiency of total nitrogen and phosphorus are above 85 % and 95 %, so that A2N system was started up successfully.


2002 ◽  
Vol 46 (9) ◽  
pp. 219-227 ◽  
Author(s):  
S. Murat ◽  
E. Atesş Genceli ◽  
R. Tasşli ◽  
N. Artan ◽  
D. Orhon

The paper evaluates the organic carbon and nitrogen removal performance of the sequencing batch reactor (SBR), technology for tannery wastewater. For this purpose, a pilot-scale SBR was installed on site to treat the plain-settled tannery effluent. The study involved wastewater characterization, start-up and operation of the reactor for carbon and nitrogen removal and model evaluation of system performance. Its removal efficiency was compared with that of the existing continuous-flow activated sludge system providing full treatment to wastewater from the Istanbul Tannery Organized Industrial District.


Sign in / Sign up

Export Citation Format

Share Document