Harking Up The Wrong (L1) Tree: How Not To Get Procurement Reform All Wrong and Big Time Too!

2020 ◽  
Author(s):  
Sandeep Verma
Keyword(s):  
2018 ◽  
Vol 57 (2) ◽  
pp. 145-174
Author(s):  
Pervez Zamurrad Janjua ◽  
Malik Muhammad ◽  
Muhammad Usman

This study examines the impact of foreign aid instruments, namely Project Aid and Programme Aid, on economic growth of 27 aid-receiving countries. The study constructs a system of three equations, i.e. growth, investment and human capital. Using the Generalised Method of Moment estimation technique, the study concludes that while Project Aid has a positive and significant impact on economic growth, Programme Aid has an insignificant impact on economic growth. Additionally, the study finds that economic policies do enhance effectiveness of aid at aggregate level. Therefore, the capacity of aid-recipient countries to effectively use their resources for economic development needs due consideration. Keywords: Project Aid, Programme Aid, Economic Growth, Conditionality, Procurement Reform, System Equation Method, Generalised Method of Moment (GMM), Principal Component Analysis


Author(s):  
SABBATH M. UROMI

This article seeks to find out challenges facing the procurement laws in Africa. The article examines the meaning and purpose of public procurement, drawing parallels between its essential elements, and stages with the need and requirement to enhance transparency and accountability to attain its objectives. It also seeks to provide analysis of traditional procurement reform objectives and identifies the importance of transparency and accountability as well as value for money in procurement to their achievement of joint goals. The article then examines broadly the access to information provisions of the procurement laws in a number of African countries namely -South Africa, Zimbabwe, Uganda and Tanzania and concludes that these laws contribute to improving access to information across Africa, particularly where an access to information law is absent, but are not robust enough to sufficiently provide comprehensive access to information. It examines the level of constraint posed by administrative charges for access to information. Also the article concludes based on the Tanzanian experience that limited access to information, laws already exist may be more as a result of; limited capacities in both the citizens sector and public sector to capture and maintain information in a retrievable format; deliberate delays by public officers to frustrate applications for access; poor information management practices and half hearted efforts within the citizens sector to apply existing law, than any application of administrative fee or other limiting provisions of the law, WITTING, W.A (2002).


Author(s):  
Eduard Yurii ◽  
Viktoriia Yuziuk

The article examines the features of public procurement in Ukraine and their compliance with EU standards, the factors that affect their effectiveness. The problems of tender purchases that exist in Ukraine during the process are considered. The changes that took place in the implementation of procurement after the introduction in 2020 of a new version of the Law of Ukraine "On Public Procurement" are assessed. A detailed description of Poland's experience in public procurement is provided. The number and types of contracts concluded during procurement are analyzed. The main existing shortcomings in the field of public procurement, ways to solve and improve them are considered. The key EU rules on public procurement to be used in Ukraine have been identified. It was established that it is important to bring the mechanism of public procurement in Ukraine closer to the EU requirements, which will allow our country to raise the issue of joining this organization in the future. The purpose of the article is to analyze the features and problems of public procurement in Ukraine and find ways to overcome them. The main task of reforming the sphere of public finances in our country is to introduce an effective mechanism for the use of public procurement in accordance with the principles and approaches applied by EU countries, which should ensure financial efficiency and transparency of the procurement procedure. Public procurement is one of the tools to regulate supply and demand for specific publications. To increase the transparency and efficiency of use in our country, it is necessary to study the experience of EU member states, especially Poland. Analysis of the experience of public procurement in the EU will be able to identify effective approaches to their implementation in Ukraine, thanks to the main tasks of public procurement reform in our country will introduce an effective system in accordance with the principles and approaches used by EU countries. It is necessary to investigate the change that has taken place in public procurement after the introduction in 2020 of a new version of the Law of Ukraine "On Public Procurement", there are both positive and negative aspects that are due to the existence of corruption schemes in tenders.


Significance The September 1 blast at the Cape Canaveral launching site is a setback for Musk's goal of breaking open the market for government and private sector space launch contracts. SpaceX has attempted to demonstrate that it can compete with established launch companies, which are backed by US aerospace giants Lockheed Martin and Boeing. SpaceX's entrepreneurial methods have suggested significant disruption to the global launching business. Impacts Defence procurement reform would boost the US military's capacity to leverage private sector technological innovations. Efforts to reduce US dependence on Russian-manufactured rockets may lose steam if hawkish Senator John McCain is not re-elected. Washington's deployment of THAAD missile defence systems to South Korea will spur Beijing's efforts to develop anti-satellite capabilities.


2002 ◽  
Vol 2 (2) ◽  
pp. 261-268 ◽  
Author(s):  
Rob Verhage ◽  
Johan van de Gronden ◽  
Kofi Awanyo ◽  
Samuel Boateng

Sign in / Sign up

Export Citation Format

Share Document