Evaluating the Role Played by BIM in Successful Execution of Construction Projects in Iran

2020 ◽  
Author(s):  
milad Soleimani ◽  
Masoud Ahmadvand ◽  
Hossein Eghbali
2020 ◽  
Vol 5 (9) ◽  
pp. 1049-1053
Author(s):  
Onyekachukwu G. Odenigbo ◽  
Koleola T Odusami ◽  
Kevin C. Okolie ◽  
Vincent C. Okafor

Delay in payment to contactors and other relevant parties have caused serious problem on the successful execution of construction projects in the country. It causes several problems to the contractor and other participants. The aim of this study is to determine the causes of delayed payments in the construction industry. The objective of this study is to identify the causes of delayed payment. In order to obtain valid data for the study, questionnaires were designed and distributed to a randomly selected sample of one hundred individuals among contractors, subcontractors, consultant and clients in the Nigerian construction industry. In total, eighty five completed questionnaires were returned and then analysed statistically. The total mean score was used to determine the ranking of the results of the study. Client’s disagreeing on the valuation of work done, slow processing of variation orders and poor quality of works were the major causes of delayed payment identified in the study. It was recommended that the stakeholders should work as a team in the execution of project to avoid bottlenecks usually encountered in agreeing contractors‟ payment. In conclusion, if the necessary action can be enforced, the problem of delayed payment can be reduced drastically.


Author(s):  

There is considerable growth in the construction projects in Khartoum State. That growth makes progressive organizations, in the construction sector, embark on a journey of applying concept and principles of executing project management. Based on that, there is great increase in the number of residential complexes in Khartoum State. These housing projects have been executed by companies adapting project management philosophy. And to obtain the best results from the process of executing construction projects, many factors should be given a huge consideration. One of these factors is logistics services. Logistics services play a significant role in the success of any construction project. All construction projects materials are obtained through logistics channels. Therefore, any issue in logistics process will seriously affect the output of the construction projects. And these issues have been affecting many construction projects and seriously affect the quality, cost and time of the final outputs of the construction projects. This research found that logistics strategy plays a significant role in the successful execution of the construction projects. Moreover, this research tested the moderator role of lean logistics in the relationship between logistics strategy and the successful execution of the construction projects.


2017 ◽  
Vol 24 (5) ◽  
pp. 757-773 ◽  
Author(s):  
Ephrem Girma Sinesilassie ◽  
Syed Zafar Shahid Tabish ◽  
Kumar Neeraj Jha

Purpose Time overrun is one of the most significant issues being faced by Ethiopian construction industry today. For effective time performance, the successful execution of construction projects and keeping them within prescribed schedule is very important. The purpose of this paper is to determine the factors responsible for impacting performance of Ethiopian public construction projects. Design/methodology/approach Based on the literature and personal interviews of key construction professionals in Ethiopia, a list of 35 project performance attributes having strong effect on performance of the projects were identified and a questionnaire using these attributes were prepared and administered in Ethiopia. Statistical analysis of responses on the attributes segregated them into distinct sets of success attributes and failure attributes. The attributes were also subjected to factor analysis separately for better understanding and it resulted into six success factors and six failure factors. The relative importance of these factors was established with multiple regression analysis. Findings It is concluded that the success factor “owners’ competence” can significantly contribute to schedule performance of Ethiopian public construction projects. On the other hand, “conflict among project participants,” “poor human resource management,” and “project manager’s ignorance and lack of knowledge” are detrimental to schedule performance of Ethiopian public construction project. Research limitations/implications As with any other opinion-based study, the present study also has some limitations. The majority of respondents have evaluated the projects in their execution stage only and very few have evaluated the performance of projects in planning and operation stages and also the study has been carried out in the Ethiopian context. Hence the study has a limitation in these regard. Originality/value The results presented in this study provide sufficient evidence and useful understanding to researchers and industry practitioners to focus on a few factors than giving attention to all the factors and take proactive measures for the timely delivery of public construction projects.


2014 ◽  
Vol 501-504 ◽  
pp. 2664-2667
Author(s):  
Hai Xie ◽  
Xuan Liu

In the fields of architecture and civil engineering, construction is a process that consists of the building or assembling of infrastructure. Far from being a single activity, large scale construction is a feat of human multitasking. Normally, the job is managed by a project manager, and supervised by a construction manager, design engineer, construction engineer or project architect. For the successful execution of a project, effective planning is essential. Those involved with the design and execution of the infrastructure in question must consider the environmental impact of the job, the successful scheduling, budgeting, construction site safety, availability of building materials, logistics, and inconvenience to the public caused by construction delays and bidding.


2021 ◽  
Vol 147 (3) ◽  
pp. 04021002
Author(s):  
Clara Mariana Katsuragawa ◽  
Gunnar Lucko ◽  
Shabtai Isaac ◽  
Yi Su

The issues of determining the estimated cost of capital construction projects with the involvement of Federal budget funds at the stage of development of project documentation, during verification of the accuracy of determining the estimated cost and the initial (maximum) contract price are considered. On the basis of the assessment of amendments to urban planning legislation for the purpose of implementing a state contract by the contractor ( based on the results of competitive procedures or without competitive procedures by decision of state authorities), the procedure for forming the estimate as part of a state (municipal) contract, the price of which is firm, is presented. For the purpose of mutual settlements between the customer and the contractor for the work performed, the formation of primary accounting documentation, as well as for checking the work performed by regulatory authorities, an example of drawing up an estimate of the state (municipal) contract on the basis of grouping costs according to structural elements and complexes of work is given. The result of the research conducted was the development of regulations and the formation of criteria for their practical application by state bodies, institutions, organizations and other participants in the investment-construction process, as well as recipients of budget funds, who perform the functions of the state (municipal) customer, developer and technical customer.


Improving the efficiency of life cycle management of capital construction projects using information modeling technologies is one of the important tasks of the construction industry. The paper presents an analysis of accumulated domestic practices, including the legal and regulatory framework, assessing the effectiveness of managing the implementation of investment construction projects and of complex and serial capital construction projects, as well as the life cycle management of especially dangerous technically complex and unique capital construction projects using information modeling technologies, especially capital construction projects, as well as their supporting and using systems, primarily in the nuclear and transport sectors. A review of modern approaches to assessing the effectiveness of life cycle management systems of complex engineering systems in relation to capital construction projects is carried out. The presented material will make it possible to formulate the basic principles and prospects of applying approaches to assessing the effectiveness of the life cycle management system of a capital construction project using information modeling technologies.