scholarly journals Revenue Management in a Multi-Stage Make-to-Order Production System

2015 ◽  
Author(s):  
Hendrik Guhlich ◽  
Moritz Fleischmann ◽  
L. MMnch ◽  
Raik Stolletz
1986 ◽  
Vol 24 (3) ◽  
pp. 517-534 ◽  
Author(s):  
SHAWNEE K. VICKERY ◽  
ROBERT E. MARKLAND

2011 ◽  
Vol 317-319 ◽  
pp. 2302-2305
Author(s):  
Ying Ying Guan ◽  
Bi Xi Zhang ◽  
Jing Song

Based on the structural entropy, this paper establishes a model for analyzing the degree of order of different structure of small or medium sized make-to-order stationery enterprise by using system limitation entropy and quality entropy. This quantificational method to evaluate the process optimization of production system is well validated.


2021 ◽  
Vol 1 (2) ◽  
pp. 46-51
Author(s):  
Dwi Ayu Lestari, Vikha Indira Asri

Scheduling is defined as the process of sequencing the manufacture of a product as a whole on several machines. All industries need proper scheduling to manage the allocation of resources so that the production system can run quickly and precisely as of it can produce optimal product. PT. Sari Warna Asli Unit V is one of the companies that implements a make to order production system with the FCFS system. Thus, scheduling the production process at this company is also known as job shop production scheduling. The methods used in this research are the CDS method, the EDD method and the FCFS method. The purpose of this research is to minimize the production time and determine the best method that can be applied to the company. The results of this research showed that the makespan obtained in the company's scheduling system with FCFS rules was 458 minutes, and the results of scheduling using the CDS method obtained a makespan value of 329 minutes, then the best production scheduling method that had the smallest makespan value was the CDS method.


2015 ◽  
Vol 2 ◽  
pp. 46-50
Author(s):  
Shohei Kanda ◽  
Katsuhiko Takahashi ◽  
Katsumi Morikawa

2018 ◽  
Vol 46 ◽  
pp. 231-246 ◽  
Author(s):  
Felixter Leone S. Chua ◽  
Neelesh N. Vasnani ◽  
Lance Brandon M. Pacio ◽  
Lanndon A. Ocampo

2008 ◽  
Vol 184 (3) ◽  
pp. 915-929 ◽  
Author(s):  
Bhaba R. Sarker ◽  
A.M.M. Jamal ◽  
Sanjay Mondal

Sign in / Sign up

Export Citation Format

Share Document