Estimaciin del costo de capital modelo de riesgo contable (Estimated Cost of Capital Accounting Risk Model)

2007 ◽  
Author(s):  
Enrique Barriga-Manrique
Keyword(s):  
2007 ◽  
Vol 6 (1) ◽  
pp. 46-46
Author(s):  
L FRANKENSTEIN ◽  
L INGLE ◽  
A REMPPIS ◽  
D SCHELLBERG ◽  
C SIGG ◽  
...  

The issues of determining the estimated cost of capital construction projects with the involvement of Federal budget funds at the stage of development of project documentation, during verification of the accuracy of determining the estimated cost and the initial (maximum) contract price are considered. On the basis of the assessment of amendments to urban planning legislation for the purpose of implementing a state contract by the contractor ( based on the results of competitive procedures or without competitive procedures by decision of state authorities), the procedure for forming the estimate as part of a state (municipal) contract, the price of which is firm, is presented. For the purpose of mutual settlements between the customer and the contractor for the work performed, the formation of primary accounting documentation, as well as for checking the work performed by regulatory authorities, an example of drawing up an estimate of the state (municipal) contract on the basis of grouping costs according to structural elements and complexes of work is given. The result of the research conducted was the development of regulations and the formation of criteria for their practical application by state bodies, institutions, organizations and other participants in the investment-construction process, as well as recipients of budget funds, who perform the functions of the state (municipal) customer, developer and technical customer.


1968 ◽  
Vol 24 (4) ◽  
pp. 113-116
Author(s):  
William C. Keefe

2010 ◽  
Vol 9 (2) ◽  
pp. 223-229
Author(s):  
Ignasi Rodriguez-Roda ◽  
Jordi Dalmau ◽  
Joaquim Comas ◽  
Eric Latrille ◽  
Jean-Philippe Steyer

2019 ◽  
Vol 3 (2) ◽  
pp. 111-122
Author(s):  
Michal Plaček ◽  
Milan Půček ◽  
František Ochrana ◽  
Milan Křápek ◽  
Ondřej H. Matyáš

This paper deals with the analysis of risks which threaten the future sustainability and operations of agricultural museums in the Czech Republic. In the section on methodology, an applicable risk model has been proposed regarding the condition of museums in the Czech Republic. Using this model, the directors of agricultural museums can assess the most significant risks which may jeopardize the sustainability of museum operations over a three-year period. The greatest risks, according to museum directors, are a lack money for investment, the inability to retain high-quality staff, and issues with technical support for exhibitions. Assessing the importance of risk is positively associated with previous experiences of a particular type of risk, whereas the association of the importance of risk with previous managerial practice is rather inconclusive.


Sign in / Sign up

Export Citation Format

Share Document