Phase I Cultural Resources Survey and Inventory of the Proposed Vermilion River Dredge Maintenance Project, Lafayette Parish, Louisiana

1999 ◽  
Author(s):  
Randy Lichtenberger ◽  
Dave Robinson ◽  
Ralph Draughon ◽  
Saucier Jr. ◽  
Atens Roger ◽  
...  
Keyword(s):  
Phase I ◽  
2000 ◽  
Author(s):  
David George ◽  
J. B. Pelletier ◽  
Roger Saucier ◽  
Katy Coyle ◽  
Saral Milstead
Keyword(s):  
Phase I ◽  

Author(s):  
Anne Gibson ◽  
Joshua McCormick ◽  
Jamie Vandagriff ◽  
Kevin Stone

This report documents the substantive findings and management recommendations of a cultural resource inventory conducted by Integrated Environmental Solutions, LLC (IES) for the City of Hutto (COH) Transmission and Distribution Pumping Stations Phase I Project in the City of Hutto, Williamson County, Texas. As the COH is a political subdivision of the State of Texas, the COH is required to comply with the Antiquities Code of Texas (ACT). The goal of the survey was to locate, identify, and assess any cultural resources, which include standing buildings/structures and archeological sites that could be adversely affected by the proposed development, and to evaluate such resources for their potential eligibility for listing as a State Antiquities Landmark (SAL) or eligibility for listing in the National Register of Historic Places (NRHP). The cultural resources inventory was conducted by Project Archeologist Anne Gibson and Archeological Field Technician Will Clow on 03 and 04 March 2020, under Texas Antiquities Permit No. 9196. The Area of Potential Effects (APE) encompasses approximately 6.63 acres (ac) and is comprised of three distinct APE areas. The Frame Switch Pumping Station (PS) is 1.2 ac in size and is located approximately 900 feet (ft) south of the intersection of Farm-to-Market Road (FM) 3349 and U.S. Highway (US) 79 midway between the City of Hutto and the City of Taylor. The Inline PS is 4.05 ac in size and is located southwest of the intersection of FM 112 and Williamson County Road (CR) 432. The Shiloh PS is 1.38 ac in size and is located approximately 1,700 ft southwest of the intersection of FM 481 and 482. During the survey, a newly-recorded, historic-period site (41WM1419) was documented within the APE. Based on the lack of association with historically-important individuals or events, absence of significant architectural features, the degree of prior disturbance, and lack of contextual integrity, site 41WM1419 is recommended as not eligible for listing in the NRHP or designation as SALs. In addition, four historic-age architectural resources were identified within the indirect APE during this survey. All records will be temporarily curated at the IES McKinney office and permanently curated at the Center for Archeological Research (CAR) at the University of Texas at San Antonio (UTSA). No further work is warranted. However, if any cultural resources, other than those documented within this report, are unearthed during construction, the operators should stop construction activities, and immediately contact the project environmental representative to initiate coordination with the THC prior to resuming any construction activities.


2001 ◽  
Author(s):  
Kari Krause ◽  
David R. George ◽  
Katy Coyle ◽  
Meredith Snead ◽  
William P. Athens
Keyword(s):  
Phase I ◽  

Author(s):  
Timothy K Perttula ◽  
Daniel J Prikryl ◽  
Bo Nelson ◽  
Sergio A Iruegas

An important part of the mission of the Caddo Lake Institute, Inc. and its Caddo Lake Scholars Program is the preservation and protection of the unique and irreplaceable cultural heritage of Caddo Lake and its bioregion, the Big Cypress Bayou watershed. The archaeology team of the Scholars Program is meeting these objectives with the initiation of the Harrison Bayou project by: (a) offering archaeological education and training of teachers, students, and potential mentors, (b) through fieldwork and research, identifying, assessing, and designating archaeological, historical, and cultural resources of the Caddo Lake bioregion, and ( c) formulating and implementing strategies for protecting the bioregion's significant cultural resources.


2020 ◽  
Vol 29 (4) ◽  
pp. 2109-2130
Author(s):  
Lauren Bislick

Purpose This study continued Phase I investigation of a modified Phonomotor Treatment (PMT) Program on motor planning in two individuals with apraxia of speech (AOS) and aphasia and, with support from prior work, refined Phase I methodology for treatment intensity and duration, a measure of communicative participation, and the use of effect size benchmarks specific to AOS. Method A single-case experimental design with multiple baselines across behaviors and participants was used to examine acquisition, generalization, and maintenance of treatment effects 8–10 weeks posttreatment. Treatment was distributed 3 days a week, and duration of treatment was specific to each participant (criterion based). Experimental stimuli consisted of target sounds or clusters embedded nonwords and real words, specific to each participants' deficit. Results Findings show improved repetition accuracy for targets in trained nonwords, generalization to targets in untrained nonwords and real words, and maintenance of treatment effects at 10 weeks posttreatment for one participant and more variable outcomes for the other participant. Conclusions Results indicate that a modified version of PMT can promote generalization and maintenance of treatment gains for trained speech targets via a multimodal approach emphasizing repeated exposure and practice. While these results are promising, the frequent co-occurrence of AOS and aphasia warrants a treatment that addresses both motor planning and linguistic deficits. Thus, the application of traditional PMT with participant-specific modifications for AOS embedded into the treatment program may be a more effective approach. Future work will continue to examine and maximize improvements in motor planning, while also treating anomia in aphasia.


Sign in / Sign up

Export Citation Format

Share Document