Formation Evaluation While Underbalanced Drilling of Horizontal Wells With Coiled Tubing Technology

10.2118/99-53 ◽  
1999 ◽  
Author(s):  
F. Azar-Nejad
2021 ◽  
Author(s):  
Usman Ahmed ◽  
Zhiheng Zhang ◽  
Ruben Ortega Alfonzo

Abstract Horizontal well completions are often equipped with Inflow Control Devices (ICDs) to optimize flow rates across the completion for the whole length of the interval and to increase the oil recovery. The ICD technology has become useful method of optimizing production from horizontal wells in a wide range of applications. It has proved to be beneficial in horizontal water injectors and steam assisted gravity drainage wells. Traditionally the challenges related to early gas or water breakthrough were dealt with complex and costly workover/intervention operations. ICD manipulation used to be done with down-hole tractor conveyed using an electric line (e-line) cable or by utilization of a conventional coiled tubing (CT) string. Wellbore profile, high doglegs, tubular ID, drag and buoyancy forces added limitations to the e-line interventions even with the use of tractor. Utilization of conventional CT string supplement the uncertainties during shifting operations by not having the assurance of accurate depth and forces applied downhole. A field in Saudi Arabia is completed with open-hole packer with ICD completion system. The excessive production from the wells resulted in increase of water cut, hence ICD's shifting was required. As operations become more complex due to fact that there was no mean to assure that ICD is shifted as needed, it was imperative to find ways to maximize both assurance and quality performance. In this particular case, several ICD manipulating jobs were conducted in the horizontal wells. A 2-7/8-in intelligent coiled tubing (ICT) system was used to optimize the well intervention performance by providing downhole real-time feedback. The indication for the correct ICD shifting was confirmed by Casing Collar Locator (CCL) and Tension & Compression signatures. This paper will present the ICT system consists of a customized bottom-hole assembly (BHA) that transmits Tension, compression, differential pressure, temperature and casing collar locator data instantaneously to the surface via a nonintrusive tube wire installed inside the coiled tubing. The main advantages of the ICT system in this operation were: monitoring the downhole force on the shifting tool while performing ICD manipulation, differential pressure, and accurately determining depth from the casing collar locator. Based on the known estimated optimum working ranges for ICD shifting and having access to real-time downhole data, the operator could decide that required force was transmitted to BHA. This bring about saving job time while finding sleeves, efficient open and close of ICD via applying required Weight on Bit (WOB) and even providing a mean to identify ICD that had debris accumulation. The experience acquired using this method in the successful operation in Saudi Arabia yielded recommendations for future similar operations.


2021 ◽  
Author(s):  
Nadir Husein ◽  
Jianhua Xu ◽  
Igor Novikov ◽  
Ruslan Gazizov ◽  
Anton Buyanov ◽  
...  

Abstract From year to year, well drilling is becoming more technologically advanced and more complex, therefore we observe the active development of drilling technologies, well completion and production intensification. It forms the trend towards the complex well geometry and growth of the length of horizontal sections and therefore an increase of the hydraulic fracturing stages at each well. It's obvious, that oil producing companies frequently don't have proved analytical data on the actual distribution of formation fluid in the inflow profiles for some reasons. Conventional logging methods in horizontal sections require coiled tubing (CT) or downhole tractors, and the well preparation such as drilling the ball seat causing technical difficulties, risks of downhole equipment getting lost or stuck in the well. Sometimes the length of horizontal sections is too long to use conventional logging methods due to their limitations. In this regard, efficient solution of objectives related to the production and development of fields with horizontal wells is complicated due to the shortage of instruments allowing to justify the horizontal well optimal length and the number of MultiFrac stages, difficulties in evaluating the reservoir management system efficiency, etc. A new method of tracer based production profiling technologies are increasingly applied in the global oil industry. This approach benefits through excluding well intervention operations for production logging, allows continuous production profiling operations without the necessity of well shut-in, and without involving additional equipment and personal to be located at wellsite.


2021 ◽  
Author(s):  
Alexander Katashov ◽  
Igor Novikov ◽  
Evgeny Malyavko ◽  
Nadir Husein

Abstract Over the past few years, the oil and gas industry has faced a situation of high fluctuations in hydrocarbon prices on the world market. In addition, the trend for the depletion of traditional hydrocarbon reservoirs and the search for new effective solutions for the management and control of field development using horizontal and multilateral wells is still relevant. The most common method for horizontal wells testing is production logging tools (PLT) on coiled tubing (CT) or downhole tractor, which is associated with HSE risks and high cost, especially on offshore platforms, which limits the widespread use of this technology. The solution without such risks is the method of marker well monitoring, which allows obtaining information about the profile and composition of the inflow in a dynamic mode in horizontal wells without well intervention. There are several types of tracer (marker) carriers and today we will consider an approach to placing marker monitoring systems as part of a completion for three-phase oil, water and gas monitoring.


2017 ◽  
Author(s):  
Ricardo de Paula Carvalho ◽  
Robledo Wakin Barros ◽  
Felipe Toloi Gastaldo ◽  
Alexandre Amorim ◽  
Jean Narlon Moreira ◽  
...  

2005 ◽  
Vol 8 (05) ◽  
pp. 445-451
Author(s):  
Huanwen Cui ◽  
Yannong Dong ◽  
Shekhar Sinha ◽  
Rintu Kalita ◽  
Younes Jalali

Summary A method is presented for estimating the distribution of a parameter related to the productivity index along the length of a liner-completed horizontal well, using measurements of well flowing pressure at multiple points along the path of flow in the wellbore. This is the concept of near-wellbore diagnosis with multipoint pressure measurements, which in principle can be made with fiber-optic sensors. The deployment mechanism of the sensors is not modeled in this study, although the temperature version of such sensors has been deployed in horizontal wells on an extended-tail-pipe or stinger completion. (The temperature sensors also have been deployed in horizontal wells with sand-screen completions, in direct contact with the formation, but that configuration is not investigated in this study.) The parameter that is estimated is known in reservoir-simulation terminology as the connection factor (CF), which represents the hydraulic coupling or connectivity between the reservoir and the wellbore (between formation gridblocks and well segments). Parameter CF has units of md-ft, similar to flow capacity, or productivity index multiplied by viscosity. Specifically, the parameter is directly proportional to the geometric mean of the permeability perpendicular to the horizontal axis of the well and is inversely related to skin. No attempts are made in this study to estimate these parameters individually, which may require recourse to other methods of well diagnosis(e.g., dynamic formation testing, transient analysis, and production logging). The method applies to flow under constant-rate conditions and yields estimates of the CF, which represents the quality of the formation in the vicinity of the well and the integrity of the completion along the well trajectory. The quality of the inversion is determined by the spatial density and accuracy of the multipoint measurements. Inversion quality also depends on knowledge of the wellbore hydraulic characteristics and the relative permeability characteristics of the formation. The basic configuration investigated in this study consists of a five-node pressure array in a 2,000-fthorizontal well experiencing a total pressure drop of approximately 60 psi when produced at 10,000 STB/D. A reasonable estimate of the distribution of the parametric group CF is obtained even when allowing for measurement drift and errors in liner roughness and relative permeability exponent. Also, the inversion can be rendered insensitive to knowledge of the far-field permeability through a scaling technique. Therefore, good estimates of the near-wellbore CF profile can be obtained with uncertain knowledge of the reservoir permeability field. This is important because the technique can be applied not only to early-time but also to late-time data. The application of the multipoint pressure method is illustrated through a series of examples, and its potential for near-wellbore formation evaluation for horizontal wells is described. Introduction Horizontal wells can be diagnosed on the basis of information derived from openhole and cased-hole surveys. These include petrophysical logs, dynamic formation testers, production logging, and pressure-transient testing. With the advent of permanent sensing technologies and the development of methods of production-data inversion or history matching, a new form of cased-hole diagnosis can be envisaged, with improved spatial and temporal coverage and without the need for in-well intervention and interruption of production. The impact of such methods on reservoir-scale characterization can also be significant. There are two main preconditions for the development of such a methodology, one concerning sensing technology and the other concerning interpretation methodology. Permanent sensing technology has made great progress during the last decade, with the development of single-point and distributed measurements that can be deployed with the completion (pressure, flow rate, and distributed temperature). However, these systems are typically developed as stand alone measurement units and do not enjoy the required degree of integration. Current modeling methods, however, can be used to provide an incentive for such integration. The well-diagnosis problem is decoupled in our investigation into diagnosis of flow condition in the wellbore and diagnosis of near-wellbore formation characteristics. (By "near-wellbore," we mean the wellbore gridblock scale.)This is partly to adhere to the conventional demarcation between production logging and dynamic formation evaluation and partly to show the natural consequence of the mathematical problem. Basically, the wellbore-diagnosis problem (determination of flux distribution, as in production logging) can treat the formation simply as a boundary condition, but the formation-evaluation problem cannot do the same (i.e., treat the wellbore interface as a boundary condition) because evaluation is based on measurements made inside the wellbore. Thus, both the wellbore and the formation have to betaken into account. (Sensors that are in direct contact with the formation, as mentioned in the Summary, are emerging.8 Therefore, the evolution of this problem is to be expected.) In this study, the permanent or in-situ analog of dynamic formation evaluation is investigated. The in-situ analog of production logging is investigated in a parallel study.


Sign in / Sign up

Export Citation Format

Share Document