Full Field Reservoir Simulation Study of an Oil Rim in a Field Offshore Abu Dhabi (UAE)

2000 ◽  
Author(s):  
Bruno Decroux ◽  
Medhat El Emam ◽  
Omar Nassar ◽  
Talal Kadada ◽  
Hagop Harakhanian
2021 ◽  
Author(s):  
Bondan Bernadi ◽  
Ihab Nabil Mohamed ◽  
Ahmed Mohamed Al Bairaq ◽  
Mariam Ahmed Al Hosani ◽  
Azer Abdullayev ◽  
...  

Abstract A comprehensive study of a giant onshore Abu Dhabi gas field using a next-generation commercial numerical simulator has been conducted. The objective was to identify the distribution and track the movement of the gas condensate in the reservoir, and to develop strategies to minimize the condensate drop-out and improve condensate recovery from the field. The field contains a large gas cap and an oil rim. We have identified the distribution of the gas condensate throughout the reservoir and were able to track its movement using the advanced fluid tracking option in the simulator. Once the gas condensate drop-out regions in the reservoir are identified, sensitivity runs with localized changes are carried out to improve the recovery from the reservoir. The strategies to mitigate drop-out include adding infill wells, drilling multi-lateral wells, reinjecting CO2 and dry gas into the reservoir, and hydraulic fracturing near the well bore. We were able to track the distribution of the condensate throughout the reservoir and identified key condensate drop-out regions. Adding infill wells improved the recovery of the condensate. Implementing multi-lateral wells also showed improved condensate recovery in the field. Hydraulic fracturing near the wellbore reduced condensate banking near the wellbore. Injecting dry gas improved the condensate recovery by a re-vaporization process where the liquid condensate is absorbed by dry gas. This paper discusses a comprehensive study on tracking the condensate distribution in a giant onshore field using a commercial simulator. The authors have performed a thorough investigation to identify an optimal condensate recovery strategy for the field, by comparing various recovery strategies using the full field reservoir simulation model.


2021 ◽  
Vol 73 (09) ◽  
pp. 41-42
Author(s):  
Chris Carpenter

This article, written by JPT Technology Editor Chris Carpenter, contains highlights of paper SPE 202747, “Fluid-Tracking Modeling for Condensate/Oil Production and Gas Use Allocation: An Abu Dhabi Onshore Example,” by Yun Wang and Gary Jerauld, SPE, BP, and Yatindra Bhushan, SPE, ADNOC, et al., prepared for the 2020 Abu Dhabi International Petroleum Exhibition and Conference, Abu Dhabi, held virtually 9–12 November. The paper has not been peer reviewed. A reservoir in a giant field onshore Abu Dhabi has been producing for 6 decades. The reservoir was already saturated at the time of production commencement, with a large oil rim and a gas cap. This paper presents a comprehensive comparison of two modeling-based approaches of fluid tracking for condensate allocation and gas usage: a tracer modeling option in a commercial reservoir simulator and a full-component fluid-tracking approach. Introduction Examples of benchmarking fluid-tracking options against an independent fluid-tracking approach are rare in the literature. The goal of this paper, therefore, is to document a comprehensive and detailed comparison between the fluid-tracking option (TRACK) in NEXUS (a commercial reservoir simulator used by companies of the coauthors of this paper) and a full-component fluid-tracking (FCFT) approach. This work is motivated by the commercial arrangement of a concession covering an onshore field in Abu Dhabi. Because of different equity entitlements among the shareholders for the oil rim and gas cap per the concession commercial terms, a need exists to allocate the condensate vs. oil-rim oil production and the injected lean-gas usage. FCFT The idea of FCFT is relatively straightforward. Before discussing the approach, it is important to note that the focus of this paper is to compare the modeling of different tracking approaches. It is assumed that a fit-for-purpose fully compositional reservoir simulation model already exists. For fluid-tracking modeling with a full-field model (FFM), this means that the compositional reservoir model has already been history matched properly at both field and individual well levels and that no additional reconciliation is required before the hydrocarbon liquid and vapor streams are split into tracked substreams. In this paper, FCFT is completed on the field level for the comparison with the TRACK option in NEXUS. One could easily extend the field level tracking to either regional well-group levels or individual well levels. In the case of the onshore reservoir, lean-gas injection has been active during much of the producing history. In future development schemes under consideration, lean-gas injection, carbon dioxide (CO2) injection, and gas lift are all possible scenarios, raising the question of how to treat injected gas components within the FCFT framework. Different approaches exist to handle the injected gas components. One may treat the injected gas components as either the gas-cap components, the oil-rim components, or entirely new components. Lean gas injected in the onshore field example is actually a dry gas, according to the 11-component equation-of-state (EOS) prediction. Thus, the lean gas can be reasonably modeled with only one new component as long as that component replicates the volumetric behavior of the injected lean gas.


2014 ◽  
Author(s):  
Shotaro Nakayama ◽  
Khalfan Al-Mansouri ◽  
Mark Allen Benson ◽  
Gary Mercado ◽  
Kamel Belaid

Sign in / Sign up

Export Citation Format

Share Document