Improving the Performance of Coiled Tubing Underbalanced Horizontal Drilling Operations

2002 ◽  
Author(s):  
R.G. Fraser R.P.T. ◽  
J. Ravensbergen
2015 ◽  
Author(s):  
A. Ebrahimi ◽  
P. J. Schermer ◽  
W. Jelinek ◽  
D. Pommier ◽  
S. Pfeil ◽  
...  

2017 ◽  
Author(s):  
Zhanke Liu ◽  
Kevin Wiranata ◽  
Arafet Ridene ◽  
Henry Wortmann ◽  
Robert Bucher ◽  
...  

2015 ◽  
Author(s):  
D. J. Schlosser ◽  
M.. Johe ◽  
T.. Humphreys ◽  
C.. Lundberg ◽  
J. L. McNichol

Abstract The Oil and Gas industry has explored and developed the Lower Shaunavon formation through vertical drilling and completion technology. In 2006, previously uneconomic oil reserves in the Lower Shaunavon were unlocked through horizontal drilling and completions technologies. This success is similar to the developments seen in many other formations within the Williston Basin and Western Canadian Sedimentary Basin including Crescent Point Energy's Viewfield Bakken play in southeast Saskatchewan. In the Lower Shaunavon play, the horizontal multistage completion era began in 2006, with horizontal divisions of four to six completion stages per well that utilized ball-drop sleeves and open-hole packers. By 2010, the stage count capabilities of ball-drop systems had increased and liners with nine to 16 stages per well were being run. With an acquisition in 2009, Crescent Point Energy began operating in the Lower Shaunavon area. The acquisition was part of the company's strategy to acquire large oil-in-place resource plays. Recognizing the importance that technology brings to these plays, Crescent Point Energy has continuously developed and implemented new technology. In 2009, realizing the success of coiled tubing fractured cemented liners in the southeast Saskatchewan Viewfield Bakken play, Crescent Point Energy trialed their first cemented liners in the Lower Shaunavon formation. At the same time, technology progressed with advancements in completion strategies that were focused on fracture fluids, fracture stages, tool development, pump rates, hydraulic horsepower, environmental impact, water management, and production. In 2013, another step change in technology saw the implementation of coiled tubing activated fracture sleeves in cemented liner completions. Based on field trials and well results in Q4 2013, Crescent Point Energy committed to a full cemented liner program in the Lower Shaunavon. This paper presents the evolution of Crescent Point Energy's Lower Shaunavon resource play of southwest Saskatchewan. The benefits of current completion techniques are: reductions in water use, increased production, competitive well costs, and retained wellbore functionality for potential re-fracture and waterflooding programs.


2021 ◽  
Author(s):  
Rida Mohamed Elgaddafi ◽  
Victor Soriano ◽  
Ramadan Ahmed ◽  
Samuel Osisanya

Abstract Horizontal well technology is one of the major improvements in reservoir stimulation. Planning and execution are the key elements to drill horizontal wells successfully, especially through depleted formations. As the reservoir has been producing for a long time, pore pressure declines, resulting in weakening hydrocarbon-bearing rocks. Drilling issues such as wellbore stability, loss circulation, differential sticking, formation damage remarkably influenced by the pore pressure decline, increasing the risk of losing part or even all the horizontal interval. This paper presents an extensive review of the potential issues and solutions associated with drilling horizontal wells in depleted reservoirs. After giving an overview of the depleted reservoir characteristics, the paper systematically addresses the major challenges that influence drilling operations in depleted reservoirs and suggests solutions to avoid uncontrolled risks. Then, the paper evaluates several real infill drilling operations through depleted reservoirs, which were drilled in different oilfields. The economic aspect associated with potential risks for drilling a horizontal well in depleted reservoirs is also discussed. The most updated research and development findings for infill drilling are summarized in the article. It is recommended to use wellbore strengthening techniques while drilling a horizontal well through highly depleted formations. This will allow using higher mud weight to control unstable shales while drilling through the production zone. Managed Pressure Drilling should be considered as the last option for highly depleted formations because it will require a greater level of investment which is not going to have a superior rate of return due to the lack of high deliverability of the reservoir. Using rotary steerable systems is favored to reduce risks related to drilling through depleted formations. Precise analysis of different drilling programs allows the drilling team to introduce new technology to reduce cost, improve drilling efficiency and maximize profit. It is the responsibility of the drilling engineer to evaluate different scenarios with all the precautions needed during the planning stage to avoid unexpected issues. The present market conditions and the advancement in technologies for drilling horizontal wells increase the feasibility of producing the depleted reservoirs economically. This paper highlights the challenges in drilling horizontal wells in highly depleted reservoirs and provides means for successfully drilling those wells to reduce risks while drilling


2012 ◽  
Author(s):  
Alex Caccialupi ◽  
Scott Anthony Benzie ◽  
Greg Filippov

2000 ◽  
Vol 122 (3) ◽  
pp. 142-146 ◽  
Author(s):  
Shifeng Tian ◽  
John T. Finger

A model has been developed to simulate multiphase flow in the wellbore and heat transfer processes between the well and formations. The model is capable of handling dynamic well depth during drilling, varying flow regimes in multiphase flow, phase change between liquid and gas, and kicks or lost circulation depending on the pressure difference between the wellbore annulus and formation. The model requires simple data input and is able to handle complicated drilling cases such as casing installation, changing drilling fluids, and drillpipe/coiled tubing connections during drilling operations. [S0195-0738(00)00303-4]


Sign in / Sign up

Export Citation Format

Share Document