Although the microhole coiled tubing drilling rigs have been used extensively in Canada, their application in the U.S. has been very limited. In an effort to introduce this technology to the U.S. operators, GTI, with the support of DOE∕NETL, has completed a successful field testing of the coiled tubing microhole drilling technology. In this paper we report results of field testing of the system in 25 wells drilled in the Niobrara unconventional gas play of Kansas and Colorado. The objective of the field test was to measure and document the rig performance under actual drilling conditions. In these tests, a coiled tubing drilling rig (designed and built by T Gipson with Advanced Drilling Technologies Inc.) was utilized. The rig operations have continued to improve to the point where it now drills a 3100ft well in a single day. Well cost savings of approximately 30% over conventional rotary well drilling have been documented. A description of the rig and a summary of its performance in the Niobrara unconventional gas play are included. In addition, an estimate of economic advantages of widespread application of microhole drilling technology in the lower 48 states is presented.


Author(s):  
Kent F. Perry

Although The Microhole Coiled Tubing Drilling rigs have been used extensively in Canada, their application in the U.S. has been very limited. In an effort to introduce this technology to the U.S. operators; GTI, with the support of DOE/NETL has completed successful field testing of coiled tubing microhole drilling technology. In this paper we report results of field testing of the system in 25 wells drilled in the Niobrara unconventional gas play of Kansas and Colorado. The objective of the field test was to measure and document the rig performance under actual drilling conditions. In these tests, a coiled tubing drilling rig (designed and bulit by Tom Gipson with Advanced Drilling Technologies Inc. (ADT)) was utilized. The rig operations have continued to improve to the point where it now drills a 3,100-foot well in a single day. Well cost savings of approximately 30% over conventional rotary well drilling have been documented. A description of the rig and a summary of its performance in the Niobrara unconventional gas play are included. In addition, an estimate of economic advantages of widespread application of microhole drilling technology in the Lower 48 States is presented.


2021 ◽  
Author(s):  
Ahmad Zahid Murshidi Zakaria ◽  
Muhammad Idham Khalid ◽  
Shahrul Nizam Mohd Effendi ◽  
Mark Arathoon ◽  
Mohamad Zakwan Zainal Abidin ◽  
...  

Abstract With the current uncertain situation regarding the stability of oil prices in the world, operators have been pushed to develop their available resources in a cost-effective way. Lately, there has been increased interest in the application of Coiled Tubing Drilling, especially for accessing bypassed hydrocarbon in mature or late-stage fields. This paper describes the feasibility study done to examine the possibility of using Coiled Tubing Drilling package/equipment to drill and complete a sidetrack well in a karstic carbonate reservoir with total losses issue by applying the principles of Pressurized Mud Cap Drilling (PMCD). This will be the first time that such method is being utilized for developing karstic carbonate reservoirs in Offshore Malaysia. The paper will go through the background of the project (generic field information, reservoir properties, well design and architecture), the critical design elements for the system (technical requirements, safety standards, operational and logistical factors) and the contingency scenarios considered. Based on the aforementioned items, a fit-for-purpose Coiled Tubing Drilling equipment arrangement together with suitable PMCD method and light annular mud (LAM) selection were proposed to cater for the specific challenges of the well. It was concluded that the application of PMCD using Coiled Tubing Drilling Package is feasible with some modification to the equipment, line up and operational procedures.


2021 ◽  
Author(s):  
Mikhail Yakovlevich Gelfgat ◽  
Aleksandr Sergeevich Geraskin

Abstract The geothermal energy is one of the most promising sources of electricity on the planet; it is available almost anywhere on the continents and resources are inexhaustible. The realization of these possibilities requires solving the problems of deep wells (6-10 km) construction, when the lower horizons are practically impermeable crystalline basement rocks. For effective use of the Earth's heat, bottomhole temperatures must be within 200-300°C. World experience of such deep wells construction is very limited, some examples are given in this work. Known schemes of geothermal energy application requires at least two wells construction - for cold fluid injection and superheated fluid production. The rock - circulating fluid heat exchange in the bottomhole requires drilling of inclined, horizontal, or multi-lateral boreholes and hydraulic fracturing application. Such technologies are widely used in the oil and gas fields, but not in crystalline rocks. The article presents an analysis of the prospects for the geothermal wells construction efficiency increasing by using modern directional drilling systems, drilling with casing, technologies for complications eliminating. The possibilities of using alternative hard rock drilling methods by enhancing the standard formation destruction with drill bits are discussed. These are hydraulic hammers, high-pressure abrasive and fluid jets, laser drilling. A fundamentally new plasma drilling technology is considered. The most serious limitation of alternative drilling prospects is the need of additional "supply lines" to the bottom: high-pressure fluid; electricity; a plasma forming agent, etc. In this regard, options are being considered for the development of continuous drill strings such as coiled tubing, umbilical, flexible composite systems like subsea pipelines. Some of technological solutions for deep geothermal wells construction, and implementation of petrothermal energy schemes for potential projects are proposed. The paper provides an idea of the geothermal well construction technologies, which can ensure the implementation of advanced geo-energy schemes. The problems of geothermal engineering and possible solutions to overcome them, which will contribute to the development of geothermal energy, as the most effective option for decarbonization, are indicated.