Case Histories: Drilling and Completing Multilateral Horizontal Wells in the Middle East

1997 ◽  
Author(s):  
R.W. Taylor ◽  
Rick Russell
2021 ◽  
Author(s):  
Marco A Aburto Perez ◽  
Anurag S Yadav ◽  
Steven R Farley

Abstract Based on input from key operators in the Middle East region, a new rotary steerable system (RSS) was launched after a compressed development schedule. This paper describes the development and introduction of the larger tool sizes needed for both onshore and offshore hole sections, including hole sizes from 12 in. and up, in the Middle East. It also outlines the deliberate design of the tool for local assembly and repair. Large diameter (9-1/2 and 11 in.) RSS designs used an existing, smaller design for Middle East applications in both offshore and onshore wells as a basis. When designing these new sizes, engineers took note of lessons learned with smaller sizes of the tool and incorporated design elements for local manufacturing, assembly, and repair. The resulting simple, modular construction enables increased levels of local content and provides for significant reductions in transportation, and therefore associated emissions. Of course, although local content and sustainability are highly desirable, performance is essential, and this paper describes case histories demonstrating how well the new tool worked in real-world Middle East applications. In one notable example, the newly introduced 9 1/2-in. diameter RSS was used to drill an offshore section in the Gulf of Arabia. The tool was mobilized after two older generation RSS had become stuck for days. Consisting primarily of argillaceous limestone, the formation had a history of stuck-pipe events. The new RSS was recommended for this application because of a slicker construction, with a fully rotational bias unit, minimal bottom hole assembly (BHA) stabilization, and an optimized junk slot area, which together help to reduce stuck-pipe risks. The tool drilled to the target depth in a single run, thereby achieving all directional requirements. Notably, after reaching the target depth, the assembly was tripped out of the hole without any requirement for backreaming. This seamless exit, in turn, indicated achieving a smooth wellbore. Other case histories demonstrate results with both new sizes of this tool. The paper also discusses in detail the ability to repair locally and engage the local supply chain. Specifically with Middle East applications in mind, a new, simple RSS design in large diameter versions has demonstrated success in offshore and onshore applications across the region. The design has also proven capabilities for manufacturing and repair local to operations, which enables maximizing in-country value, optimizing use of the tools, and energizing local supply chains.


2020 ◽  
Author(s):  
Ajay Kumar Addagalla ◽  
Prakash Jadhav ◽  
Prahlad Yadav ◽  
Pranjal Sarmah ◽  
Iain Maley ◽  
...  

2021 ◽  
Author(s):  
Alexey Ruzhnikov ◽  
Edgar Echevarria

Abstract In the Middle East many of the matured fields have fractured or vugular formations where the drilling is continued without return to a surface. This situation has been commonly interpreted as lack of hole cleaning and high risk of stuck pipe. The manuscript describes a study performed to analyze the hole cleaning while blind drilling horizontal sections. Most of the losses while drilling across fractured or vugular formations happen sudden, and this represents a risk of formation instability and stuck pipe. Additionally, the cuttings accumulation may lead to a potential pack off. To understand the hole cleaning the annular pressure while drilling was introduced in different sections, what via change of the equivalent static and dynamic densities describes the cutting and cavings accumulation in the annulus. Additionally, the hole cleaning behavior with different fluids pumped through the drillstring (i.e. drilling fluid, water, water with sweeps) was studied. The proposed study was performed in 4 different fields, 9 wells, across horizontal 6⅛-in. sections with total lost circulation. It was identified that while drilling with full returns ECD vs ESD variations are within 1.5 ppg, those variations are matching with the modeling of hydraulics. Once total losses encountered the variations between ECD and ESD are very low - within 0.2 ppg - indicating that annular friction losses below the loss circulation zone are minimal. This support the theory that all the drilled cuttings are properly lifted from bottom and carried to the karst into the loss circulation zone and not fluctuating above the loss zone. Additionally, minor to no relation found in hole cleaning while drilling with mud or a water with sweeps. This finding also is aligned with the stuck pipe statistics that shows higher incidents of stuck pipe while drilling the with full circulation due to pack off. The manuscript confirms the theory of the hole cleaning in total lost circulation and application of different hole cleaning practices to improve it. The results of the study can be implemented in any project worldwide.


Sign in / Sign up

Export Citation Format

Share Document