Field Case: Match of a 600 Bars Depletion and 40 Years of History in a Fractured Carbonate Sour Gas Field

Author(s):  
F. Paux ◽  
H. Zhou
2019 ◽  
Author(s):  
Azis Hidayat ◽  
Dwi Hudya Febrianto ◽  
Elisa Wijayanti ◽  
Diniko Nurhajj ◽  
Ahmad Sujai ◽  
...  

2021 ◽  
Author(s):  
Bashirul Haq

Abstract Sour gas reservoirs are vital sources for natural gas production. Sulphur deposition in the reservoir reduces a considerable amount of gas production due to permeability reduction. Consequently, well health monitoring and early prediction of Sulphur deposition are crucial for effective gas production from a sour gas reservoir. Dynamic gas material balance analysis is a useful technique in calculating gas initially in place utilizing the flowing wellhead or bottom hole pressures and rates during the well's lifetime. The approach did not apply to monitor a producing gas's health well and detect Sulphur deposition. This work aims to (i) modify dynamic gas material balance equation by adding the Sulphur deposition term, (ii) build a model to predict and validate the issue utilizing the modified equation. A unique form of the flowing material balance is developed by including Sulphur residue term. The curve fitting tool and modified flowing gas material balance are applied to predict well-expected behaviour. The variation between expected and actual performance indicates the health issue of a well. Initial, individual components of the model are tested. Then the model is validated with the known values. The workflow is applied to active gas field and correctly detected the health issue. The novel workflow can accurately predict Sulphur evidence. Besides,the workflow can notify the production engineers to take corrective measures about the subject. Keywords: Sulfur deposition, Dynamic gas material balance analysis, Workflow


2014 ◽  
Author(s):  
Ardian Nengkoda ◽  
Mofeed Awwami ◽  
Xiaolong Cai ◽  
Jamal Mufleh ◽  
Bader Harbi ◽  
...  

2013 ◽  
Vol 712-715 ◽  
pp. 1096-1099
Author(s):  
Ling Feng Li

For natural gas well in sour gas reservoirs, very serious corrosion in the completed well system is an important factor of gas production system life. In order to ensure the long-term development of gas wells, this paper mainly introduces material corrosion prevention technology in the completed well system, such as corrosion-resistant alloy steel corrosion control technology, bimetallic combination tubing, corrosion inhibitor technology and so on. By taking LJ Gas Field as an example, this paper introduces the material corrosion prevention technology in the completed well system in LJ Gas Field. For application in the completed well system in LJ Gas Field, the technology above have good performance of corrosion resistance.


2020 ◽  
Author(s):  
Hongzhi Guo ◽  
Huigeng Li ◽  
Zhiyong Weng ◽  
Ke Tao ◽  
Dong Wang
Keyword(s):  

Sign in / Sign up

Export Citation Format

Share Document