An Operational Overview of the Use of High Pressure Coiled Tubing in the Gulf of Mexico

1997 ◽  
Author(s):  
Henrik Aslak Larsen
2015 ◽  
Author(s):  
Alexander Rudnik ◽  
Carlos Alberto Torres Nava ◽  
Renny Alexis Ottolina Grunichev ◽  
Travis Gortmaker ◽  
Charles Nwabuzor

2012 ◽  
Author(s):  
Rick L. Giunta ◽  
Cam Van Le ◽  
Martin F. Schoener-Scott ◽  
Ryan Neal Anderson ◽  
Joshua Monroe Glass

2021 ◽  
pp. 1-13
Author(s):  
Wang Xiaoyan ◽  
Zhao Jian ◽  
Yin Qingguo ◽  
Cao Bao ◽  
Zhang Yang ◽  
...  

Summary Achieving effective results using conventional thermal recovery technology is challenging in the deep undisturbed reservoir with extra-heavy oil in the LKQ oil field. Therefore, in this study, a novel approach based on in-situ combustion huff-and-puff technology is proposed. Through physical and numerical simulations of the reservoir, the oil recovery mechanism and key injection and production parameters of early-stage ultraheavy oil were investigated, and a series of key engineering supporting technologies were developed that were confirmed to be feasible via a pilot test. The results revealed that the ultraheavy oil in the LKQ oil field could achieve oxidation combustion under a high ignition temperature of greater than 450°C, where in-situ cracking and upgrading could occur, leading to greatly decreased viscosity of ultraheavy oil and significantly improved mobility. Moreover, it could achieve higher extra-heavy-oil production combined with the energy supplement of flue gas injection. The reasonable cycles of in-situ combustion huff and puff were five cycles, with the first cycle of gas injection of 300 000 m3 and the gas injection volume per cycle increasing in turn. It was predicted that the incremental oil production of a single well would be 500 t in one cycle. In addition, the supporting technologies were developed, such as a coiled-tubing electric ignition system, an integrated temperature and pressure monitoring system in coiled tubing, anticorrosion cementing and completion technology with high-temperature and high-pressure thermal recovery, and anticorrosion injection-production integrated lifting technology. The proposed method was applied to a pilot test in the YS3 well in the LKQ oil field. The high-pressure ignition was achieved in the 2200-m-deep well using the coiled-tubing electric igniter. The maximum temperature tolerance of the integrated monitoring system in coiled tubing reached up to 1200°C, which provided the functions of distributed temperature and multipoint pressure measurement in the entire wellbore. The combination of 13Cr-P110 casing and titanium alloy tubing effectively reduced the high-temperature and high-pressure oxygen corrosion of the wellbore. The successful field test of the comprehensive supporting engineering technologies presents a new approach for effective production in deep extra-heavy-oil reservoirs.


2014 ◽  
Author(s):  
Carlos Torres ◽  
Renny Ottolina ◽  
Alexander Rudnik ◽  
Carl Creppel ◽  
Ernest Bergeron ◽  
...  
Keyword(s):  

2021 ◽  
Vol 73 (03) ◽  
pp. 60-61
Author(s):  
Judy Feder

This article, written by JPT Technology Editor Judy Feder, contains highlights of paper OTC 30558, “Development and Implementation of Heavy-Wall, High-Strength, Sour-Service Accessory and Risers for HP/HT Application in the Gulf of Mexico,” by Carine Landier, Jonathas Oliveira, and Christelle Gomes, Vallourec, et al., prepared for the 2020 Offshore Technology Conference, originally scheduled to be held in Houston, 4–7 May. The paper has not been peer reviewed. Copyright 2020 Offshore Technology Conference. Reproduced by permission. As oil and gas development in the Gulf of Mexico increasingly requires high-pressure/high-temperature (HP/HT) applications, the need for sour-service (SS) resistance also has grown. To meet these needs, continual innovation and improvement is needed in SS-grade materials from a technical and cost-effectiveness perspective. The complete paper discusses the material properties achieved with several large-diameter, heavy-wall SS pipes. The complete paper presents a detailed, illustrated discussion of the applications for the high-strength SS pipe and its manufacturing process. Applications The authors write that improved materials to meet HP/HT requirements such as those in the Gulf of Mexico are needed particularly for two applications: for risers, which require high-strength, thick-wall sour service; and as a substitute for corrosion-resistant alloy (CRA) with sour carbon material on defined accessories. Vallourec has developed high-strength [125,000-psi specified minimum yield strength (SMYS)] and resistant carbon steel pipes in sizes with outer diameter (OD) up to 23 in. and wall thickness up to 2.5 in. These sizes are common in lower-strength material, but meeting the high-pressure requirements with higher-grade material enables cost savings and eliminates some CRA components. It also enables the use of much-lighter-weight pipe than the 80,000-psi SMYS material that is standard for SS applications in oversize OD and heavy wall. Risers. Most deepwater drilling is performed with classic subsea blowout-preventer (BOP) systems. Access to the well through the BOP is accomplished with low-pressure, large-diameter (19-in. internal diameter) drilling riser pipe. Pipes are supplied in weldable grades (API 5L X65–X80). Large-diameter forged flanges are then welded onto the tubes. Connections are made by multiple bolts. High pressures, required as part of the drilling process, are supplied by small-diameter choke-and-kill lines. This system has served the industry well, but, as well pressures increase, so have cost and feasibility requirements of subsea BOP technology. These costs, driven by the complexity of redundant systems, have driven a desire to explore an alternative solution—a surface BOP with high-pressure drilling riser pipe. Using a surface BOP reduces the complexity and cost of the system significantly because of the ability to inspect it. The drilling riser then carries the pressure to the surface and must be able to contain it. The high-pressure environment that instigated a new solution was based on a 15,000-psi well pressure with NACE Region 2 SS performance. Because of the requirement for weldable grades for attaching the flange as well as SS, the maximum yield strength has been limited to 80,000 psi. At that strength, a very high wall thickness is required to meet 15,000 psi and greater. This becomes very heavy and can be limited by the rig hook-load capacity. Alternatives in weldable grades are nickel-based alloys with SS performance. A full string, however, is prohibitively expensive.


Sign in / Sign up

Export Citation Format

Share Document