Effects of Completion Scenarios and Formation Damage on Two-Phase Inflow Performance of A Horizontal Well

1996 ◽  
Author(s):  
Pudji Permadi
1999 ◽  
Author(s):  
Habib Menouar ◽  
Abdulaziz Al-Majed ◽  
Syed Sajid Hasan

2004 ◽  
Vol 19 (02) ◽  
pp. 100-104 ◽  
Author(s):  
Frederic Gallice ◽  
Michael L. Wiggins
Keyword(s):  

2013 ◽  
Vol 2013 ◽  
pp. 1-5
Author(s):  
M. H. Alawi ◽  
M. M. El-Qadi ◽  
M. A. El-Ameen

Porous asphalt is a standard asphalt built on aggregate storage bed which allows water to drain through it and reduces stormwater runoff. However, porosity of the porous asphalt and the storage bed may be effectively reduced due to trapping suspended solids from the water or from the asphalt damage. In this paper, we present mathematical modeling and numerical simulation of flow and damage of porous asphalt-paved roads. A mathematical model to describe the fine-particles transport carried by a two-phase flow in a porous medium is presented. The buoyancy, capillarity, and mixed relative permeabilities correlations to fit with the mixed-wet system are considered. Throughout this investigation, we monitor the changing of the fluids properties such as water saturation and solid properties such as porosity and permeability due to trapping the fine-particles.


1983 ◽  
Vol 23 (1) ◽  
pp. 164
Author(s):  
M. David Agostini

The North Rankin gas field discovered in 1971, has been evaluated by a series of appraisal wells and refinement of this is underway through the use of a 3D seismic survey. Extensive production testing on two wells was used to establish reservoir fluid characteristics, inflow performance and to predict reservoir behaviour.The North Rankin 'A' platform has been constructed of a standard steel jacket design. Components of the structure were built in Japan, Singapore, Geraldton, Jervoise Bay and Adelaide. Provision exists for 34 wells to be drilled from the structure to exploit the southern end of the North Rankin field.Simultaneous drilling and producing activities are planned, requiring well survey and deviation control techniques that will provide a high level of confidence. Wells will be completed using 7 inch tubing, fire resistant christmas trees, and are designed to be produced at about 87 MMSCFD on a continuous basis. Process equipment on this platform is designed to handle 1200 MMSCFD and is intended primarily to dry the gas and condensate and to transfer gas and liquid to shore in a two phase 40 inch pipeline. The maintenance of offshore equipment is being planned to maximise the ratio between planned and unplanned work.The commencement of drilling activities is planned for mid 1983, with commissioning of process equipment occurring in the second quarter of 198 The North Rankin 'A' platform will initially supply the WA market at some 400 MMSCFD offshore gas rate, requiring 7 wells. The start of LNG exports is planned for April 1987. The intial gas for this will be derived from the North Rankin 'A' platform.


Sign in / Sign up

Export Citation Format

Share Document