Integrated Field Development Planning Using Risk and Decision Analysis To Minimise the Impact of Reservoir and Other Uncertainties: A Case Study

Author(s):  
J.A. Stripe ◽  
Kazuyoshi Arisaka ◽  
Marc Durandeau
2016 ◽  
Vol 19 (03) ◽  
pp. 391-402
Author(s):  
Sunday Amoyedo ◽  
Emmanuel Ekut ◽  
Rasaki Salami ◽  
Liliana Goncalves-Ferreira ◽  
Pascal Desegaulx

Summary This paper presents case studies focused on the interpretation and integration of seismic reservoir monitoring from several fields in conventional offshore and deepwater Niger Delta. The fields are characterized by different geological settings and development-maturity stages. We show different applications varying from qualitative to quantitative use of time-lapse (4D) seismic information. In the first case study, which is in shallow water, the field has specific reservoir-development challenges, simple geology, and is in phased development. On this field, 4D seismic, which was acquired several years ago, is characterized by poor seismic repeatability. Nevertheless, we show that because of improvements from seismic reprocessing, 4D seismic makes qualitative contributions to the ongoing field development. In the second case study, the field is characterized by complex geological settings. The 4D seismic is affected by overburden with strong lateral variations in velocity and steeply dipping structure (up to 40°). Prestack-depth-imaging (PSDM) 4D seismic is used in a more-qualitative manner to monitor gas injection, validate the geologic/reservoir models, optimize infill injector placement, and consequently, enhance field-development economics. The third case study presents a deep offshore field characterized by a complex depositional system for some reservoirs. In this example, good 4D-seismic repeatability (sum of source- and receiver-placement differences between surveys, dS+dR) is achieved, leading to an increased quantitative use of 4D monitoring for the assessment of sand/sand communication, mapping of oil/water (OWC) front, pressure evolution, and dynamic calibration of petro-elastic model (PEM), and also as a seismic-based production-logging tool. In addition, 4D seismic is used to update seismic interpretation, provide a better understanding of internal architecture of the reservoirs units, and, thereby, yield a more-robust reservoir model. The 4D seismic in this field is a key tool for field-development optimization and reservoir management. The last case study illustrates the need for seismic-feasibility studies to detect 4D responses related to production. In addition to assessing the impact of the field environment on the 4D- seismic signal, these studies also help in choosing the optimum seismic-survey type, design, and acquisition parameters. These studies would possibly lead to the adoption of new technologies such as broad-band streamer or nodes acquisition in the near future.


2020 ◽  
Author(s):  
Okiemute Amuboh ◽  
Suleiman Ahmed ◽  
Dolapo Enya ◽  
Gbolade Ibikunle ◽  
Imonite Imorame ◽  
...  

2019 ◽  
Vol 23 (1) ◽  
pp. 77
Author(s):  
Nurhadi Susanto

Although numerous studies have established the importance of public participation in development, in practice, the government or companies in charge of infrastructure development often obscure public perception about its potential impact on development outcomes. This research aims to provide a more detailed description of the impact of toll road construction projects with low public participation. This research is study is a case study that employed qualitative research design approach. The study provides a deeper understanding the impact that ignoring public engagement has on the construction toll road. Results of this study underscore the importance of participatory public project planning and implementation on project outcomes and impact. Specifically, results of the study showed that public disengagement in the construction of road toll impacts public perception [during the project preconstruction and construction stages; willingness to accept change in land use change that is necessary to realize the project; and ultimately the social impact of similar project. Study results are valuable inputs into decision making process on the need for participatory infrastructure development to enhance project acceptability, effectiveness and social impact; the importance of good development planning that involves taking into consideration all the scenarios during the implementation phase. 


2018 ◽  
Author(s):  
Mohamad Alkhatib ◽  
Abdulla Ali Al Ali ◽  
Muhammad Mukhtar ◽  
Sangseok Park ◽  
Kassem Ghorayeb ◽  
...  

2019 ◽  
Author(s):  
Ekaterina Eliseeva ◽  
Fabien Hauchart ◽  
Scott Wilson ◽  
Sergey Mukhin

Sign in / Sign up

Export Citation Format

Share Document