The Second Long-Term Horizontal Well Test in Troll: Successful Production From a 13-in. Oil Column With the Well Partly Completed in the Water Zone
1991 ◽
Vol 43
(08)
◽
pp. 914-973
◽
1992 ◽
Vol 29
(2)
◽
pp. A91
2022 ◽
Keyword(s):
2013 ◽
Vol 295-298
◽
pp. 3183-3191
Keyword(s):
2011 ◽
Vol 28
(2)
◽
pp. 493-501
◽
2011 ◽
Vol 8
(3)
◽
pp. 464-476
◽