Recompletions Using Large-Diameter Coiled Tubing: Prudhoe Bay Case History and Discussion

1991 ◽  
Author(s):  
C.G. Blount ◽  
S.L. Ward ◽  
T.D. Weiss ◽  
C.M. Hightower
2007 ◽  
Author(s):  
Jennifer Yvonne Julian ◽  
Kirk Charles Forcade ◽  
Taylor L. West ◽  
Kevin yeager ◽  
Robert Lee Mielke ◽  
...  

2007 ◽  
Author(s):  
Jennifer Yvonne Julian ◽  
Janet Sack ◽  
Joel E. Johns
Keyword(s):  

2011 ◽  
Author(s):  
Victor Gerardo Vallejo ◽  
Aciel Olivares ◽  
Pablo Crespo Hdez ◽  
Eduardo R. Roman ◽  
Claudio Rogerio Tigre Maia ◽  
...  

2021 ◽  
Author(s):  
Bipin Jain ◽  
Abhijeet Tambe ◽  
Dylan Waugh ◽  
Moises MunozRivera ◽  
Rianne Campbell

Abstract Several injection wells in Prudhoe Bay, Alaska exhibit sustained casing pressure (SCP) between the production tubing and the inner casing. The diagnostics on these wells have shown communication due to issues with casing leaks. Conventional cement systems have historically been used in coiled-tubing-delivered squeeze jobs to repair the leaks. However, even when these squeeze jobs are executed successfully, there is no guarantee in the short or long term that the annular communication is repaired. Many of these injector wells develop SCP in the range of 300-400 psi post-repair. It has been observed that the SCP development can reoccur immediately after annulus communication repair, or months to years after an injector well is put back on injection. Once SCP is developed the well cannot be operated further. A new generation of cement system was used to overcome the remedial challenge presented in these injector wells. This document provides the successful application of a specialized adaptive cement system conveyed to the problematic zone with the advantage of using coiled tubing equipment for optimum delivery of the remedial treatment.


2021 ◽  
Vol 73 (06) ◽  
pp. 41-41
Author(s):  
Alex Crabtree

Last year, this feature opened, almost inevitably, with comments on the effects the COVID-19 pandemic might have on our industry. Unfortunately, a year later, we probably have all experienced the effects, both personal and work-related. One of these effects is that there has been re-evaluation of what’s important. To understand what is important takes some reflection and evaluation of the past. In previous features, the focus has been on what is new or reimagined. Therefore, I thought that, in selecting papers for this year’s feature, it would be useful to select ones that look at coiled tubing operations performed and that have been evaluated in one way or another. From Bolivia comes a paper that reviews some 25 well interventions performed. Most of these operations are of a type that will be familiar to the reader. Also, some of the challenges that were faced in performing these coiled tubing operations will be familiar. These operations used a range of established types of coiled tubing operations and blended the techniques to meet particular operating conditions, especially location and logistics challenges. All conclusions and best practices that resulted, however, may not be familiar to all readers. During the past few years, many coiled tubing papers have focused on the use of coiled tubing in multizone fracturing operations, especially plug milling. An area of coiled tubing use in fracturing operations that has had less of an audience recently has been the use of coiled tubing in annular fracturing operations. This activity is still routinely being performed, particularly in Canada. The question has long existed about how the pipe is being eroded. In the related paper in this feature, the authors explain how they have tried to answer that question and have shared some of their review insights. In the past decade, coiled tubing size, weight, and grade all have continued to increase. Looking back at this trend and thinking about its effect on pressure control equipment led the developers in the third of this year’s papers to work on solutions for shear rams. This is particularly relevant after having just passed the 11th anniversary of the tragic Macondo disaster. Again, this year, I ask everyone to stay well. Recommended additional reading at OnePetro: www.onepetro.org. OTC 30408 Design and Safety Considerations To Perform Coiled Tubing Operations in Large-Diameter, High-Temperature Geothermal Wells by Ishaan Singh, Schlumberger, et al. SPE 204446 Implementing Business Analytics Software To Optimize Coiled Tubing Operations: A Digital Approach to Operations Efficiency by Xaymaca Bautista Alarcon, Royal Oaks Energy Services, et al. SPE 203272 The Reinvention of a Well-Established Coiled Tubing Intervention Work Flow Creates New Perspectives for Acidizing Openhole Horizontal Tight Carbonate Water Injectors by Sameer Punnapala, ADNOC, et al.


Sign in / Sign up

Export Citation Format

Share Document