Holistic Customized Approach to Address Practical Challenges for the Large Scale Implementation of Limited Entry Liners Completions at ADNOC Onshore Fields
Abstract Limited entry liners (LEL) implementation strategy is one of the key solutions to to improve the well productivity by maximizing the reservoir contact and matrix stimulation carbonate reservoirs. This strategy requires conducting high rate and high volume acid stimulation with high pressure pump after the installation of limted entry liner, that poses practical concerns to be addressed for adopting conventional well completions and existing resources. In addition, implementation of the LEL completion and stimulation for a large scale application within the minimum time frame and limited resources is a challenge. This paper provides the detail of challenges faced and solutions adopted to implement the LEL completions amd stimulation at onshore fields. Challenges including suitable candidate selection, completion design, limited materials for well construction to handle high-volume acid stimulation, limited well head injection pressure, contractual limitations for securing the tools and pumping equipment. Further, this paper discusses about the temporary solutions adopted for executing the LEL implementation in the best economical way within near future and provide the long term solutions for LEL implementation in the next 5 years business. The first three LEL completion wells that were successfully installed and stimulated at ADNOC Onshore are currently producing at more than 2 times higher PI (productivity index) compared to the pre-stimulation rate. The same apply to the injector wells, in which significant improvement on the injection rate of up to 18bbl/min (26000 bwpd) was observed. Currently ADNOC Onshore is planning to execute the LEL completion and stimulation in additional 15 wells during 2021 along with plan for up to 300 LEL completions during the next 5 years. The LEL technology is a key technology to support ADNOC lower completion strategy which aim to minimize the bare foot completions in order to increase the horizontal wellbore accessibility and effective stimulation. Overall, the first LEL installation and stimulation completed within 8 months from the candidate finalization using the existing resources available in ADNOC Onshore. This paper describes an economical solution for implementation of LEL completion strategy at large scale for major fields within minimum time frame by utilizing the existing resources while adhering to HSE rules.