Full Integrated Model as a Tool for Strategy Evaluation of the Greenfield

2021 ◽  
Author(s):  
Denis Nikolaevich Platon ◽  
Aidar Ramilovich Gatin ◽  
Matvei Nikolaevich Fomin ◽  
Nikita Sergeevich Korostelev

Abstract The main goal of this work is to evaluate and select the best strategy for the development of the field in the first stage of development. To solve this problem, a full-scale integrated model was created that takes into account the physics of the reservoir, wells and surface infrastructure, as well as their mutual influence. The integrated model was calculated for the full development of the asset. The integrated model of the A. Zhagrin field is based on three simulation models, well models and surface infrastructure, which are linked through an integrator program. All constituent parts of the model are configured to accurately reproduce their actual operation. Greenfield is characterized as active drilling, so the planned well count is modeled by replacing wells with "typical" well models, which are selected by taking into account the expected input flow rate, well design, well completion and well trajectory. Fields of the first stage of development are characterized by limitations related to oil transportation and treatment. These constraints are also specified and taken into account in the model The concept of surface infrastructure is formed depending on the potential production capabilities of the reservoir and has considerable variability. The total number of actual and planned wells in the field is more than 1,300, including more than 700 production wells and about 600 injection wells. All wells are ESP lifted. Considering infrastructure capacity constraints and requirements for optimal pipeline utilization, the use of different numbers of drilling rigs directly affecting the utilization of oil treatment and delivery facilities was evaluated. 29 main variations of the field development strategy until 2060 were formed and calculated, based on the integrated model. The main parameters of variation were the capacity of preparation facilities, the degree of oil separation, the scheme of product transportation, gas utilization capabilities, drilling rigs and subsurface equipment. All scenarios in the integrated model took into account constraints - on target bottomhole, wellhead and line pressures, in order to operate real facilities in accident-free mode. In the course of calculations, an optimal scenario was selected, which made it possible to increase oil production in 2021 by optimizing the transportation of produced products to the treatment facilities. This scenario formed the basis of the asset development strategy.

Neft i gaz ◽  
2020 ◽  
Vol 1 (121) ◽  
pp. 69-76
Author(s):  
M.ZH. DOSZHANOV ◽  
◽  
B.N. ALYBAEV ◽  
M. K. KARAZHANOVA ◽  
D.A. AKHMETOV ◽  
...  

As the experience of field development shows, the unplanned growth of cracks in injection wells does not always have a positive effect on the development of oil reserves, but on the contrary, causes premature flooding of producing wells. At present, most of the fields are in the final stage of development, and increasing the coverage of the reservoir by flooding is an important task for the development of oil fields. The article considers and analyzes the influence of injection wells on the growth of hydraulic fracturing cracks and the relationship with oil production on the example of the Karazhanbas field (hereinafter referred to as the KBM).


2021 ◽  
Author(s):  
Aqib Qureshi ◽  
Kushal Gupta ◽  
Salim Abdalla Al Ali ◽  
Yoshito Uchiyama ◽  
Rohit Singh Negi

Abstract In multilayered reservoirs, major focus has been on the usage of smart well completion technologies to help improve recoveries, particularly with technological improvements and an increasing expanse of opportunities in more challenging and rewarding assets. The fundamental focus has been to design well completions that integrate several surface/subsurface sub zones and automate the flow control from each zone. In Multi zone Smart Completion Wells where significant investment is made to complete smart wells with remotely controlled inflow control valves (ICV), reservoir sweep & drain accessibilities becomes decisive when evaluating the efficiency of recovery and long-term field development strategy. Smart completion designs for multi-lateral wells present many challenges in terms of completion deployment and interventions in life of well. The complexity of operations increases with deviation, type of completion equipment, number of zones and planned interventions. In offshore, UAE a similar multilateral well was designed to be completed with 4 zone smart completion and had a mandatory requirement of accessibility to lower most drain (for future interventions) with the ability to plug the lower drain till future requirements arises. A solution is to utilize nipple & blanking plug in lower most drain, which was implemented in this well. Upon successful deployment of completion, plug was retrieved on coil tubing and lower drain accessibility was confirmed. However, during re-installation of blanking plug on coil tubing in deviated section, issues were encountered to pass through the ICV profiles. In attempts to pass through ICV profiles, blanking plug and running tool got disconnected from coil tubing, leaving the fish inside one of ICV valve. Several attempts were made to retrieve the blanking plug with rig on coil tubing without success by using thru-tubing fishing equipment options available in country. Well was suspend to work-out fishing strategy & evaluate availability of fishing equipment worldwide. Consideration was done for design and manufacture application specific fishing tools to perform workover with barge for such smart completion, as it includes a number of downhole components that makes its retrieval more challenging, and there are no standard procedure or provision in place to retrieve such complex completions in highly deviated section. A barge was mobilized with coil tubing, which performed the fishing operation as planned. Careful selection of equipment's, BHA and operational parameters resulted in successful retrieval of blanking plug & running tools. Accessibility to well was gain and confirmed. This paper presents the situation that was faced, the remedial work done to complete well, fishing operations and the subsequent factors considered for choice of equipment and operation on well. This paper concludes a detailed account of factors to consider for planning smart completions in horizontal multilateral wells & the successful fishing operation – an excellent example of how careful planning, dedicated project management, specialized design fishing tools, experienced personnel and a collaborative relationship between team's leads to a successful operation and prevented an extremely expensive workover of a high technology completion well.


2019 ◽  
Vol 11 (19) ◽  
pp. 5283 ◽  
Author(s):  
Gowida ◽  
Moussa ◽  
Elkatatny ◽  
Ali

Rock mechanical properties play a key role in the optimization process of engineering practices in the oil and gas industry so that better field development decisions can be made. Estimation of these properties is central in well placement, drilling programs, and well completion design. The elastic behavior of rocks can be studied by determining two main parameters: Young’s modulus and Poisson’s ratio. Accurate determination of the Poisson’s ratio helps to estimate the in-situ horizontal stresses and in turn, avoid many critical problems which interrupt drilling operations, such as pipe sticking and wellbore instability issues. Accurate Poisson’s ratio values can be experimentally determined using retrieved core samples under simulated in-situ downhole conditions. However, this technique is time-consuming and economically ineffective, requiring the development of a more effective technique. This study has developed a new generalized model to estimate static Poisson’s ratio values of sandstone rocks using a supervised artificial neural network (ANN). The developed ANN model uses well log data such as bulk density and sonic log as the input parameters to target static Poisson’s ratio values as outputs. Subsequently, the developed ANN model was transformed into a more practical and easier to use white-box mode using an ANN-based empirical equation. Core data (692 data points) and their corresponding petrophysical data were used to train and test the ANN model. The self-adaptive differential evolution (SADE) algorithm was used to fine-tune the parameters of the ANN model to obtain the most accurate results in terms of the highest correlation coefficient (R) and the lowest mean absolute percentage error (MAPE). The results obtained from the optimized ANN model show an excellent agreement with the laboratory measured static Poisson’s ratio, confirming the high accuracy of the developed model. A comparison of the developed ANN-based empirical correlation with the previously developed approaches demonstrates the superiority of the developed correlation in predicting static Poisson’s ratio values with the highest R and the lowest MAPE. The developed correlation performs in a manner far superior to other approaches when validated against unseen field data. The developed ANN-based mathematical model can be used as a robust tool to estimate static Poisson’s ratio without the need to run the ANN model.


2018 ◽  
Vol 56 ◽  
pp. 02014
Author(s):  
Maksim Rasskazov ◽  
Marina Potapchuk ◽  
Gennady Kursakin ◽  
Denis Tsoy

The paper presents the results of geomechanical studies on the assessment of the potential rockburst hazard of the rock massif of the South Khingan deposit of manganese ore at the stage of development. Geodynamic zoning has been performed, mining and technical, mining and geological conditions of field development have been studied, and parameters of physical and mechanical properties of enclosing rocks and ores have been determined. Numerical simulation methods have been used to estimate the stress state of a rock massif at various stages of the deposit development. The tendency of the lower part of the South Khingan deposit to rockburst has been established. The complex of effective organizational and technical security measures has been substantiated in the development of this field.


2021 ◽  
Author(s):  
Vinicius Gasparetto ◽  
Thierry Hernalsteens ◽  
Joao Francisco Fleck Heck Britto ◽  
Joab Flavio Araujo Leao ◽  
Thiago Duarte Fonseca Dos Santos ◽  
...  

Abstract Buzios is a super-giant ultra-deep-water pre-salt oil and gas field located in the Santos Basin off Brazil's Southeastern coast. There are four production systems already installed in the field. Designed to use flexible pipes to tie back the production and injection wells to the FPSOs (Floating Production Storage and Offloading), these systems have taken advantage from several lessons learned in the previous projects installed by Petrobras in Santos Basin pre-salt areas since 2010. This knowledge, combined with advances in flexible pipe technology, use of long-term contracts and early engagement with suppliers, made it possible to optimize the field development, minimizing the risks and reducing the capital expenditure (CAPEX) initially planned. This paper presents the first four Buzios subsea system developments, highlighting some of the technological achievements applied in the field, as the first wide application of 8" Internal Diameter (ID) flexible production pipes for ultra-deep water, leading to faster ramp-ups and higher production flowrates. It describes how the supply chain strategy provided flexibility to cover the remaining project uncertainties, and reports the optimizations carried out in flexible riser systems and subsea layouts. The flexible risers, usually installed in lazy wave configurations at such water depths, were optimized reducing the total buoyancy necessary. For water injection and service lines, the buoyancy modules were completely removed, and thus the lines were installed in a free-hanging configuration. Riser configuration optimizations promoted a drop of around 25% on total riser CAPEX and allowed the riser anchor position to be placed closer to the floating production unit, promoting opportunities for reducing the subsea tieback lengths. Standardization of pipe specifications and the riser configurations allowed the projects to exchange the lines, increasing flexibility and avoiding riser interference in a scenario with multiple suppliers. Furthermore, Buzios was the first ultra-deep-water project to install a flexible line, riser, and flowline, with fully Controlled Annulus Solution (CAS). This system, developed by TechnipFMC, allows pipe integrity management from the topside, which reduces subsea inspections. As an outcome of the technological improvements and the optimizations applied to the Buzios subsea system, a vast reduction in subsea CAPEX it was achieved, with a swift production ramp-up.


2021 ◽  
Author(s):  
Vil Syrtlanov ◽  
Yury Golovatskiy ◽  
Ivan Ishimov

Abstract In this paper the simplified way is proposed for predicting the dynamics of liquid production and estimating the parameters of the oil reservoir using diagnostic curves, which are a generalization of analytical approaches, partially compared with the results of calculations on 3D simulation models and with actual well production data.


2021 ◽  
Vol 3 (8) ◽  
pp. 70-72
Author(s):  
Jianbo Hu ◽  
◽  
Yifeng Di ◽  
Qisheng Tang ◽  
Ren Wen ◽  
...  

In recent years, China has made certain achievements in shallow sea petroleum geological exploration and development, but the exploration of deep water areas is still in the initial stage, and the water depth in the South China Sea is generally 500 to 2000 meters, which is a deep water operation area. Although China has made some progress in the field of deep-water development of petroleum technology research, but compared with the international advanced countries in marine science and technology, there is a large gap, in the international competition is at a disadvantage, marine research technology and equipment is relatively backward, deep-sea resources exploration and development capacity is insufficient, high-end technology to foreign dependence. In order to better develop China's deep-sea oil and gas resources, it is necessary to strengthen the development of drilling and completion technology in the oil industry drilling engineering. This paper briefly describes the research overview, technical difficulties, design principles and main contents of the completion technology in deepwater drilling and completion engineering. It is expected to have some significance for the development of deepwater oil and gas fields in China.


2021 ◽  
Author(s):  
Subba Ramarao Rachapudi Venkata ◽  
Nagaraju Reddicharla ◽  
Shamma Saeed Alshehhi ◽  
Indra Utama ◽  
Saber Mubarak Al Nuimi ◽  
...  

Abstract Matured hydrocarbon fields are continuously deteriorating and selection of well interventions turn into critical task with an objective of achieving higher business value. Time consuming simulation models and classical decision-making approach making it difficult to rapidly identify the best underperforming, potential rig and rig-less candidates. Therefore, the objective of this paper is to demonstrate the automated solution with data driven machine learning (ML) & AI assisted workflows to prioritize the intervention opportunities that can deliver higher sustainable oil rate and profitability. The solution consists of establishing a customized database using inputs from various sources including production & completion data, flat files and simulation models. Automation of Data gathering along with technical and economical calculations were implemented to overcome the repetitive and less added value tasks. Second layer of solution includes configuration of tailor-made workflows to conduct the analysis of well performance, logs, output from simulation models (static reservoir model, well models) along with historical events. Further these workflows were combination of current best practices of an integrated assessment of subsurface opportunities through analytical computations along with machine learning driven techniques for ranking the well intervention opportunities with consideration of complexity in implementation. The automated process outcome is a comprehensive list of future well intervention candidates like well conversion to gas lift, water shutoff, stimulation and nitrogen kick-off opportunities. The opportunity ranking is completed with AI assisted supported scoring system that takes input from technical, financial and implementation risk scores. In addition, intuitive dashboards are built and tailored with the involvement of management and engineering departments to track the opportunity maturation process. The advisory system has been implemented and tested in a giant mature field with over 300 wells. The solution identified more techno-economical feasible opportunities within hours instead of weeks or months with reduced risk of failure resulting into an improved economic success rate. The first set of opportunities under implementation and expected a gain of 2.5MM$ with in first one year and expected to have reoccurring gains in subsequent years. The ranked opportunities are incorporated into the business plan, RMP plans and drilling & workover schedule in accordance to field development targets. This advisory system helps in maximizing the profitability and minimizing CAPEX and OPEX. This further maximizes utilization of production optimization models by 30%. Currently the system was implemented in one of ADNOC Onshore field and expected to be scaled to other fields based on consistent value creation. A hybrid approach of physics and machine learning based solution led to the development of automated workflows to identify and rank the inactive strings, well conversion to gas lift candidates & underperforming candidates resulting into successful cost optimization and production gain.


2021 ◽  
Author(s):  
Kirill Bogachev ◽  
Aleksandr Zagainov ◽  
Evgeny Piskovskiy ◽  
Iuliia Moshina ◽  
Aleksei Grishin ◽  
...  

Abstract The creation and matching of an integrated field model including a model for part of a giant field, well models and surface network model is considered here. The integrated model was created using an innovative method of solving a unified system of equations that cover all the physical processes in the reservoir-well-surface network system; no integrator software was involved. The project involves a history-matched dynamic model covering part of a giant field, a surface network layout and well constructions with the subsurface equipment parameters. These data were fed to a single software product to create a digital twin which would allow simultaneous work with both the reservoir and the network. The approach enabled quick creation and matching of an integrated model with a lot of wells which can create forecasts for various operation modes and estimate the base case production for the infrastructure in place, as well as offers an option to connect new project wells to the current surface network.


2021 ◽  
Vol 0 (3) ◽  
pp. 65-70
Author(s):  
M.V. SHMAKOVA ◽  

The relevance of this study is determined by the need to improve the tools for developing strategies for the development of territorial socio-economic systems, taking into account the realities of the current stage of development. Among these realities are the formation of the economic space of the region and the limited resources for development, which determined the logic, goal and objectives of this study. The purpose of this study is to develop theoretical, methodological and practical recommendations for the formation of a regional development strategy taking into account the spatial component. To achieve this goal, the following tasks were formulated and solved: clarification of the essence and content of the category "economic space" as the basis for accounting for this category in strategic developments; identification of the features of regional development, taking into account the spatial component; development of principles and prerequisites for regional strategy taking into account the spatial component of development; formation of a scheme for accounting for the spatial component in the development of strategies for multi-level territorial entities; development and testing of a modified model of resource provision for territorial development strategies as an updated toolkit for regional strategy. The novelty of the results of this study lies in the development of theoretical, methodological and practical recommendations for using the spatial component in the formation of a regional development strategy, which, unlike existing developments, allow taking into account the properties and characteristics of economic space when developing a block for the distribution of territorial resources and thereby provide conditions for increasing the resulting parameters multilevel territorial entities and the region as a whole.


Sign in / Sign up

Export Citation Format

Share Document