Flood Control Method in Fields with Hard-To-Recover Reserves
Keyword(s):
Abstract This paper presents a method for predicting the development of Auto-HF (crack) in injection wells of the reservoir pressure maintenance system during the development of low-permeable reservoirs, in order to ensure the optimal front of oil displacement by water by regulating the bottom-hole pressure of injection wells based on the derived dependence of the half-length of the Auto-HF (crack).
2010 ◽
pp. 20-24
2017 ◽
Vol 156
◽
pp. 575-581
◽
2021 ◽
Keyword(s):
1962 ◽
Vol 27
(2)
◽
pp. 42-44