Optimizing Automated Well Testing for the Unconventional Oil Field using a Modular Approach

2019 ◽  
Author(s):  
Sander Baaren ◽  
Ryan Malone
2021 ◽  
Author(s):  
Gabriela Chaves ◽  
Danielle Monteiro ◽  
Virgilio José Martins Ferreira

Abstract Commingle production nodes are standard practice in the industry to combine multiple segments into one. This practice is adopted at the subsurface or surface to reduce costs, elements (e.g. pipes), and space. However, it leads to one problem: determine the rates of the single elements. This problem is recurrently solved in the platform scenario using the back allocation approach, where the total platform flowrate is used to obtain the individual wells’ flowrates. The wells’ flowrates are crucial to monitor, manage and make operational decisions in order to optimize field production. This work combined outflow (well and flowline) simulation, reservoir inflow, algorithms, and an optimization problem to calculate the wells’ flowrates and give a status about the current well state. Wells stated as unsuited indicates either the input data, the well model, or the well is behaving not as expected. The well status is valuable operational information that can be interpreted, for instance, to indicate the need for a new well testing, or as reliability rate for simulations run. The well flowrates are calculated considering three scenarios the probable, minimum and maximum. Real-time data is used as input data and production well test is used to tune and update well model and parameters routinely. The methodology was applied using a representative offshore oil field with 14 producing wells for two-years production time. The back allocation methodology showed robustness in all cases, labeling the wells properly, calculating the flowrates, and honoring the platform flowrate.


2021 ◽  
Author(s):  
Babalola Daramola

Abstract This publication presents how an oil asset unlocked idle production after numerous production upsets and a gas hydrate blockage. It also uses economics to justify facilities enhancement projects for flow assurance. Field F is an offshore oil field with eight subsea wells tied back to a third party FPSO vessel. Field F was shut down for turnaround maintenance in 2015. After the field was brought back online, one of the production wells (F5) failed to flow. An evaluation of the reservoir, well, and facilities data suggested that there was a gas hydrate blockage in the subsea pipeline between the well head and the FPSO vessel. A subsea intervention vessel was then hired to execute a pipeline clean-out operation, which removed the gas hydrate, and restored F5 well oil production. To minimise oil production losses due to flow assurance issues, the asset team evaluated the viability of installing a test pipeline and a second methanol umbilical as facilities enhancement projects. The pipeline clean-out operation delivered 5400 barrels of oil per day production to the asset. The feasibility study suggested that installing a second methanol umbilical and a test pipeline are economically attractive. It is recommended that the new methanol umbilical is installed to guarantee oil flow from F5 and future infill production wells. The test pipeline can be used to clean up new wells, to induce low pressure wells, and for well testing, well sampling, water salinity evaluation, tracer evaluation, and production optimisation. This paper presents production upset diagnosis and remediation steps actioned in a producing oil field, and aids the justification of methanol umbilical capacity upgrade and test pipeline installations as facilities enhancement projects. It also indicates that gas hydrate blockage can be prevented by providing adequate methanol umbilical capacity for timely dosing of oil production wells.


2021 ◽  
Author(s):  
Nagaraju Reddicharla ◽  
Subba Ramarao Rachapudi ◽  
Indra Utama ◽  
Furqan Ahmed Khan ◽  
Prabhker Reddy Vanam ◽  
...  

Abstract Well testing is one of the vital process as part of reservoir performance monitoring. As field matures with increase in number of well stock, testing becomes tedious job in terms of resources (MPFM and test separators) and this affect the production quota delivery. In addition, the test data validation and approval follow a business process that needs up to 10 days before to accept or reject the well tests. The volume of well tests conducted were almost 10,000 and out of them around 10 To 15 % of tests were rejected statistically per year. The objective of the paper is to develop a methodology to reduce well test rejections and timely raising the flag for operator intervention to recommence the well test. This case study was applied in a mature field, which is producing for 40 years that has good volume of historical well test data is available. This paper discusses the development of a data driven Well test data analyzer and Optimizer supported by artificial intelligence (AI) for wells being tested using MPFM in two staged approach. The motivating idea is to ingest historical, real-time data, well model performance curve and prescribe the quality of the well test data to provide flag to operator on real time. The ML prediction results helps testing operations and can reduce the test acceptance turnaround timing drastically from 10 days to hours. In Second layer, an unsupervised model with historical data is helping to identify the parameters that affecting for rejection of the well test example duration of testing, choke size, GOR etc. The outcome from the modeling will be incorporated in updating the well test procedure and testing Philosophy. This approach is being under evaluation stage in one of the asset in ADNOC Onshore. The results are expected to be reducing the well test rejection by at least 5 % that further optimize the resources required and improve the back allocation process. Furthermore, real time flagging of the test Quality will help in reduction of validation cycle from 10 days hours to improve the well testing cycle process. This methodology improves integrated reservoir management compliance of well testing requirements in asset where resources are limited. This methodology is envisioned to be integrated with full field digital oil field Implementation. This is a novel approach to apply machine learning and artificial intelligence application to well testing. It maximizes the utilization of real-time data for creating advisory system that improve test data quality monitoring and timely decision-making to reduce the well test rejection.


2012 ◽  
Author(s):  
Zhang Wensheng ◽  
Wang Lin ◽  
Wang Fengshan ◽  
Huang Youquan ◽  
Cao Gang ◽  
...  

2019 ◽  
Vol 3 (2) ◽  
pp. 41-51
Author(s):  
Maha Hamoudi ◽  
Akram Humoodi ◽  
Bashdar Mohammed

Production logging tools (PLTs) in oil and gas industries are used for obtaining fluid types and measuring fluid rates in the borehole for both production and injection wells and to better understand the well productivity or the well injectivity of the interest zones. Additionally, it can be used to detect well problems, such as early water or gas breakthrough, channeling behind casing or tubing, and water or gas coning. The Khurmala field is a big oil field in the Kurdistan region of Iraq. PLTs have been acquired in many of the Khurmala oil wells, and the log records took into consideration the production technique decisions. In this study, results of the PLT log will be discussed in one of the Khurmala oil wells. Owing to the long history of production of oil or gas wells, many problems have been seen, such as coning either water or gas, formation damage, casing corrosion, and well obstruct. This research will evaluate the production profile across the slotted liner interval of (W1) well in the Khurmala oil field in the Iraq-Kurdistan region and detect possible water entry points, verify the distribution and nature of fluids, and estimate fluid segregation after the shut-in period. This was done by applying PLTs and interpreting the data by using Emeraude software. The performance of each choke size was studied and assessed. It was found that a choke size of 48/64̎gives the best favorable production gas, oil ratio, and profile. Results from the PL survey showed that no water entry was detected across the logged interval. All the water was coming from below a depth of 990 m; most of the hydrocarbons were coming from the slotted interval across 981.8-982.9 m, and the flowing pressure across the logged interval using maximum choke was less than the saturation pressure.


2021 ◽  
Author(s):  
Adhi Naharindra ◽  
Zalina Ali ◽  
Nik Fazril Ain Sapi’an ◽  
Latief Riyanto ◽  
Fuziana Tusimin ◽  
...  

Abstract Increased HSE concerns and global economic efficiency from well testing activities especially on its environmental impact have left several oil and gas industries’ facing critical challenges to develop and monetize oil reserves. Some of these challenges include handling well effluents from well test unloading operations after well completion with high contaminants such as H2S and CO2 which will exacerbate environmental impact to safety, pollution, and oil spill risks. In addition, mitigation to environmental impact will be constrained to limited deck space and topside loads for offshore wellhead facilities and eventually restricts the footprint of well test unloading equipment. The scope of the paper is to examine the evolution of well deliverability testing from conventional well test facilities’ flaring practices to contemporary smokeless and zero flaring operations applied in a giant sand stones oil field in Malaysian water, which is surrounded by a world class environmentally protected marine and coastal ecosystem. The zero-flaring approach allows a demonstration of the safety & emission reduction, cost saving, technical viability, and economic benefits over traditional flaring techniques for 20 to 30 well testing during the life of field. Previous wells clean up method require flaring of oil and gas before the production facilities and flow lines were operational.commissioned. The application of environment friendly well testing system using the completed flow lines and production facilities enable zero-flaring option to be technically and economically viable. Zero-flaring well testing system provides several attractive benefits, with potential reduction in flaring equivalent of ±1000 barrels of oil, pollution avoidance, 40 - 50% schedule reduction and over 40% reduction in total project costs for the field development..


2007 ◽  
Vol 10 (02) ◽  
pp. 112-121 ◽  
Author(s):  
Enzo Beretta ◽  
Alessandro Tiani ◽  
Gaetano Lo Presti ◽  
Francesca Verga

Summary Environmental constraints and high costs, especially offshore, are making conventional-well testing less and less feasible and accepted by the public administration. New options were thoroughly evaluated to find a viable alternative to standard production tests for characterizing the well productivity without surface production. An accurate investigation demonstrated that injection tests could provide all the information needed to calculate the well productivity at reasonably low costs and with a good degree of reliability. On the basis of the results of laboratory and field pilot tests, it was proved that injectivity tests could be applied successfully to a real sour-oil field. Laboratory tests proved that brine could be a suitable injection fluid because there were no compatibility problems with the oil and the reservoir rock. It was verified that the interpretation of the pressure transients should be referred to the falloff period rather than to the injection phase. The formation permeability-thickness product (kh) could be identified correctly from the pressure-derivative analysis only if multiphase flow was assumed. The total skin value could also be obtained from the test interpretation. The total skin comprises two components: a mechanical component resulting from permeability damage and a biphase component resulting from fluid interaction in the reservoir. Except for a limited number of cases, the biphase skin can be evaluated only with numerical well testing, provided that the fluid relative permeability curves are available. It was also demonstrated that the biphase component depends mainly on the injection rate but is independent of the formation permeability. Then, the well-known transient equation was applied to determine the well productivity index (PI) based on the kh and the mechanical skin. PI values calculated from injection tests compared satisfactorily with PI values measured from six drillstem tests (DSTs) performed on appraisal wells. Introduction In the vast majority of situations associated with exploration activities, there is no infrastructure and no equipment in place to collect the hydrocarbons produced during well tests; thus, it is common practice to burn the produced fluids. However, the demands (if not requirements) to reduce or avoid hydrocarbon emissions and the restrictive environmental regulations in place make conventional well testing less and less feasible for appraisal wells (Levitan 2002; Hollaender et al. 2002). In addition, the general target of reducing the time and cost of operations, especially for challenging oilfield developments, requires evaluating whether conventional well testing is always the optimal cost-effective option. Therefore, the potential value of alternatives that might be used as a substitute to conventional well testing needs to be investigated. It is likely that individually, these alternatives do not fulfill all the targets of conventional tests; thus, a clear understanding of the capabilities of each is necessary. The work presented in this paper refers to a real, naturally fractured reservoir with more than 200 development wells to be tested after final completion. Standard production tests are not allowed by local regulations because of the environmental concerns and the risks associated with the presence of high percentages of H2S. Possible alternatives to conventional well testing were investigated, with the principal goal being the estimation of the productivity of the field's main geological units (Pool 1, Pool 2, and Pool 3).


Author(s):  
Jack D. Marrelli ◽  
Ram S. Mohan ◽  
Shoubo Wang ◽  
Luis Gomez ◽  
Ovadia Shoham

First oil production from a deep-water oil field is to be achieved by the installation of an Initial Development System (IDS). Well testing is required for field development and reservoir management. The well testing system requires high accuracy oil and water rates to provide the data needed for decision analysis in ongoing drilling programs. The well testing system must also be integrated with other platform operations such as well clean up after drilling. The concept of a certain type of multiphase meter in a feedback control loop with conventional separation technology for process control is simulated to extend the capabilities of both technologies. The principle of GVF control as a supplementary to level control system has been developed for performance enhancement of oil field well testing. Concepts demonstrated here can also be easily applied as retro-fits to existing separation facilities which show accuracy or upset problems because of the simplicity and compact size of the additional multiphase meter component and non-disruptive supplementary integration with existing level control systems.


Sign in / Sign up

Export Citation Format

Share Document