Well Integrity Management: Challenges in Extending Life of a Mature Gas Condensate Field – A Case Study

Author(s):  
S. Jain ◽  
M. A. Al Hamadi ◽  
H. Saradva ◽  
J. Asarpota ◽  
S. J. Sparke ◽  
...  
2021 ◽  
Author(s):  
Mohamed Ibrahim Mohamed ◽  
Ahmed Mahmoud El-Menoufi ◽  
Eman Abed Ezz El-Regal ◽  
Ahmed Mohamed Ali ◽  
Khaled Mohamed Mansour ◽  
...  

Abstract Field development planning of gas condensate fields using numerical simulation has many aspects to consider that may lead to a significant impact on production optimization. An important aspect is to account for the effects of network constraints and process plant operating conditions through an integrated asset model. This model should honor proper representation of the fluid within the reservoir, through the wells and up to the network and facility. Obaiyed is one of the biggest onshore gas field in Egypt, it is a highly heterogeneous gas condensate field located in the western desert of Egypt with more than 100 wells. Three initial condensate gas ratios are existing based on early PVT samples and production testing. The initial CGRs as follows;160, 115 and 42 STB/MMSCF. With continuous pressure depletion, the produced hydrocarbon composition stream changes, causing a deviation between the design parameters and the operating parameters of the equipment within the process plant, resulting in a decrease in the recovery of liquid condensate. Therefore, the facility engineers demand a dynamic update of a detailed composition stream to optimize the system and achieve greater economic value. The best way to obtain this compositional stream is by using a fully compositional integrated asset model. Utilizing a fully compositional model in Obaiyed is challenging, computationally expensive, and impractical, especially during the history match of the reservoir numerical model. In this paper, a case study for Obaiyed field is presented in which we used an alternative integrated asset modeling approach comprising a modified black-oil (MBO) that results in significant timesaving in the full-field reservoir simulation model. We then used a proper de-lumping scheme to convert the modified black oil tables into as many components as required by the surface network and process plant facility. The results of proposed approach are compared with a fully compositional approach for validity check. The results clearly identified the system bottlenecks. The model can be used to propose the best tie-in location of future wells in addition to providing first-pass flow assurance indications throughout the field's life and under different network configurations. The model enabled the facility engineers to keep the conditions of the surface facility within the optimized operating envelope throughout the field's lifetime.


2021 ◽  
Author(s):  
Fianti Ramadhani ◽  
Syaiful Nurdin ◽  
Michael Olu Etuhoko ◽  
Yang Zhi ◽  
Sugeng Mulyono ◽  
...  

Abstract Four high-pressure-high temperature (HPHT) and sour gas wells are currently operating at Madura offshore as the only productive assets for Husky-CNOOC Madura Limited (HCML). Each well performance is very crucial to fulfill the demand of the gas customers in East Java, Indonesia. Since starting production in 2017, the wells experienced two main well integrity challenges, high annulus pressure and wellhead growth. Both challenges are very dependent to the well flow rate and the flow duration. A continuous operation monitoring is highly required in order to keep the wells operating safely. To overcome the challenges, HCML established a Well Integrity Management System (WIMS) document that approached several international standards as its basis. As company grows, development plan challenged the WIMS to perform faster and more efficient as compared to the existing manual system. From there, the journey of WIMS digitalization began. The journey started with the alignment of the existing WIMS document to the ISO-16530-1 at Operational Phase with more stringent boundary to operate the wells safely. The alignment covers, but not limited to the organizational structure, well barriers and criteria, monitoring and surveillance, annulus pressure management, and maintenance. The document also covered risk assessment and management of well integrity failure, which was the backbone of the WIMS digitalization. The current digital solutions allow production data to be accessed and retrieved directly from the system for analysis purposes. It compares the recorded data with pre-determined rules and parameters set in the system. It triggers a notification to the responsible personnel to perform the required action should any anomaly occurs. It also can send a reminder to users to schedule and complete a well Integrity test to ensure that a well is always in compliance with the WIMS. All test reports and documentation are stored in the system as preparation for any future audit. A key requirement of the expert software system was access to future developments that can offer enhanced functionality of the well integrity platform through additional near time capabilities such as predictive erosion and corrosion for downhole flow wetted components. This is being developed to enhance workover scheduling for existing wells and material selection for new wells and is planned to update automatically critical well integrity criteria such as tubing burst, collapse and MAASP.


Sign in / Sign up

Export Citation Format

Share Document