GLDA/HF Facilitates High Temperature Acidizing and Coiled Tubing Corrosion Inhibition

Author(s):  
Enrique A. Reyes ◽  
Alyssa L. Smith ◽  
Aaron Beuterbaugh ◽  
Tristen Calabrese
2021 ◽  
pp. 1-13
Author(s):  
Wang Xiaoyan ◽  
Zhao Jian ◽  
Yin Qingguo ◽  
Cao Bao ◽  
Zhang Yang ◽  
...  

Summary Achieving effective results using conventional thermal recovery technology is challenging in the deep undisturbed reservoir with extra-heavy oil in the LKQ oil field. Therefore, in this study, a novel approach based on in-situ combustion huff-and-puff technology is proposed. Through physical and numerical simulations of the reservoir, the oil recovery mechanism and key injection and production parameters of early-stage ultraheavy oil were investigated, and a series of key engineering supporting technologies were developed that were confirmed to be feasible via a pilot test. The results revealed that the ultraheavy oil in the LKQ oil field could achieve oxidation combustion under a high ignition temperature of greater than 450°C, where in-situ cracking and upgrading could occur, leading to greatly decreased viscosity of ultraheavy oil and significantly improved mobility. Moreover, it could achieve higher extra-heavy-oil production combined with the energy supplement of flue gas injection. The reasonable cycles of in-situ combustion huff and puff were five cycles, with the first cycle of gas injection of 300 000 m3 and the gas injection volume per cycle increasing in turn. It was predicted that the incremental oil production of a single well would be 500 t in one cycle. In addition, the supporting technologies were developed, such as a coiled-tubing electric ignition system, an integrated temperature and pressure monitoring system in coiled tubing, anticorrosion cementing and completion technology with high-temperature and high-pressure thermal recovery, and anticorrosion injection-production integrated lifting technology. The proposed method was applied to a pilot test in the YS3 well in the LKQ oil field. The high-pressure ignition was achieved in the 2200-m-deep well using the coiled-tubing electric igniter. The maximum temperature tolerance of the integrated monitoring system in coiled tubing reached up to 1200°C, which provided the functions of distributed temperature and multipoint pressure measurement in the entire wellbore. The combination of 13Cr-P110 casing and titanium alloy tubing effectively reduced the high-temperature and high-pressure oxygen corrosion of the wellbore. The successful field test of the comprehensive supporting engineering technologies presents a new approach for effective production in deep extra-heavy-oil reservoirs.


2015 ◽  
Vol 733 ◽  
pp. 51-54
Author(s):  
Chao Gao ◽  
Guang Sheng Cao ◽  
Cheng Yan Sun

In order to overcome the disadvantages of rapid acid-rock reaction rate, short penetration distance, and poor acidification results exist in the process of traditional acidification in Putaohua reservoir, this paper has developed research on retarded acidification technique and optimized its formula and injection parameters. With the operations of complex formulation, screening and optimization among main agent, scale-fromingion inhibitor clay stabilizer corrosion inhibitor retardant, a kind of retarded unplugging formula with good combination property suits for environment of high temperature has been developed. According to research, this developed formula system has permeability improving rate of 60% on natural core, suggest good characteristics of corrosion inhibition, retardation and permeability increasing.


2021 ◽  
Vol 73 (07) ◽  
pp. 51-52
Author(s):  
Chris Carpenter

This article, written by JPT Technology Editor Chris Carpenter, contains highlights of paper OTC 30408, “Design and Safety Considerations To Perform Coiled Tubing Operations in Large-Diameter, High-Temperature Geothermal Wells,” by Ishaan Singh, SPE, Danny Aryo Wijoseno, SPE, and Kellen Wolf, Schlumberger, et al., prepared for the 2020 Offshore Technology Conference Asia, originally scheduled to be held in Kuala Lumpur, 17–19 August. The paper has not been peer reviewed. Copyright 2020 Offshore Technology Conference. Reproduced by permission. The productive section in a high-pressure, high-temperature (HP/HT) geothermal Field A in the Philippines features shallow and deep reservoirs separated by a low-permeability formation. However, recent years have seen a reduction in production levels. To activate and enhance well production, coiled tubing (CT) nitrogen-lift operations were required. CT simulations were combined with simulations from the geothermal reservoir to overcome modeling limitations. The outcome helped the design of a new cooling-loop system and allowed optimization of the nitrogen-lift technique. As a result, two large-diameter geothermal wells were lifted safely with 2-in. CT. Introduction This study describes design and safety considerations in performing CT operations in high-temperature, large- diameter geothermal wells. The customized high-temperature-grade seal material was chosen to withstand high bottomhole temperatures (BHT) (600°F), and a heat exchanger riser system was designed and tested on the job to handle high-surface-temperature steam (350–400°F), thus mitigating potential well-control incidents. Challenges of Seal Damage Caused by High Surface Temperatures in Live Well Intervention The CT interventions in quenched HP/HT geothermal wells reduce the risk of surface equipment failure. The seal material readily available in the market is rated to 250°F, but, if quenching is not possible, the high-temperature steam (approximately 350–400°F) may flow into the pressure-control equipment, leading to seal damage and CT contingencies. At high temperatures (400°F), these seals are unusable. It becomes essential to use a surface heat exchange riser (HER) system to prevent this issue. Design and Execution of HER Systems in Field A To avoid any well contingency and to keep pressure-control equipment safe, HER systems can be used. Some basic designs for HERs are described in the complete paper. For this study, a customized 4.06-in. HER cooling system (Design 1, shown in Fig. 1) was designed to accommodate 2-in. CT pipe. Design 1 was chosen from an evaluation of three design candidates outlined in the complete paper. The wellhead stack featured seal elements rated to high temperatures (400°F). To prevent high- temperature steam from entering the wellhead stack, the blowout preventer, and other surface- equipment elements, an efficient HER system was designed wherein, while the CT is still in the well performing CT operations, the cold water can be pumped into the CT-stack annulus from the top flow cross through the cooling riser to the bottom flow cross and back to the return tank. The temperature of the cooling loop was continuously monitored to ensure that it was well below 212°F (the boiling point of water).


2010 ◽  
Author(s):  
Walter Nunez Garcia ◽  
Ricardo Solares ◽  
Jairo Alonso Leal Jauregui ◽  
Jorge E. Duarte ◽  
Alejandro Chacon ◽  
...  

2010 ◽  
Author(s):  
Gildardo Ramirez ◽  
Guillermo Arredondo ◽  
Jaime Chapa ◽  
Ricardo Macias ◽  
J. Eduardo Soriano

2014 ◽  
Author(s):  
Sean Quinn ◽  
Christina Chrysovulou ◽  
Daniel Erickson ◽  
Basant K. Singh ◽  
Dwi Haryanti ◽  
...  

Sign in / Sign up

Export Citation Format

Share Document