Increasing Matrix Stimulation Effectiveness in the Caspian Using Real-Time Downhole Measurements (Russian)

2014 ◽  
Author(s):  
Mansur Aglyamov ◽  
Daniyar Agrynov ◽  
Artemy Savin ◽  
Nikolay Kulinich ◽  
Anton Burov ◽  
...  
2021 ◽  
Author(s):  
Stefan Dinger ◽  
Andrei Casali ◽  
Frank Lind ◽  
Azwan Hadi Keong ◽  
Johnny Bårdsen ◽  
...  

Abstract Coiled tubing (CT) operations in the Norwegian continental shelf (NCS) often require a long and large-outside-diameter pipe due to big diameter completions, deep wells, and the need for high annular velocity during fluid circulation. However, getting the CT string onboard becomes a challenge when the crane lifting limit is 35 t, and using a standalone crane barge increases the cost of the operation. The alternative is spooling the CT from a vessel to the platform. Boat spooling is done by placing the CT string on a floating vessel with dynamic positioning while the standard CT injector head is secured at the edge of the platform to pull the pipe from the vessel to an empty CT reel on the platform. The boat is equipped with a CT guide; special tension clamps; and an emergency disconnect system, which consists of a standard CT shear-seal blowout preventer. The technique requires careful study of the platform structure for placement of the injector head support frame, metocean data of the field, and equipment placement on the vessel and platform. The boat spooling operation of a 7,700-m long, 58.7-t, 2.375-in.-outside-diameter CT string was successfully executed for a platform at 70-m height from mean sea level. The total operating time from hooking up the vessel to successfully spooling the string only took 12 hours. Historically for the region, the method has been attempted in sea state of up to 4-m wave height and 16 knots maximum wind speed. For this operation, the spooling was carried out during an average sea state of 2-m wave height and 15-knot wind speed. The continuous CT string allows a telemetry cable to be installed inside the pipe after the CT is spooled onto the platform reel, enabling real-time downhole measurements during the intervention. Such installation is not possible or presents high risk if the CT string is taken onboard by splicing two sections of pipe together with a spoolable connector or butt welding. From a cost perspective, the boat-spooling operation had up to 80% direct cost saving for the operator when compared to other methods of lifting a single CT string onboard, such as using a motion-compensated barge crane. The planning for the boat spooling included several essential contingency plans. Performing a CT boat spooling operation in a complex environment is possible and opens new opportunities to use longer and heavier CT strings, with lower mobilization costs. Such strings enable more advanced and efficient interventions, with the option of using real-time CT downhole measurements during the execution of a wide range of production startup work. This, in turn, is critical to support the drilling of more extended reach wells, which allow access to untapped reservoirs.


2019 ◽  
Author(s):  
Carlos Eduardo Guedes ◽  
Marcia Benavides ◽  
Carlos Baumann ◽  
Fernando Garcia-Osuna ◽  
Sharif Aboelnaga ◽  
...  

2021 ◽  
Author(s):  
Tesleem Lawal ◽  
Pradeepkumar Ashok ◽  
Eric van Oort ◽  
Dandan Zheng ◽  
Matthew Isbell

AbstractMud motor failure is a significant contributor to non-productive time in lower-cost land drilling operations, e.g. in North America. Typically, motor failure prevention methodologies range from re-designing or performing sophisticated analytical modeling of the motor power section, to modeling motor performance using high-frequency downhole measurements. In this paper, we present data analytics methods to detect and predict motor failures ahead of time using primarily surface drilling measurements.We studied critical drilling and non-drilling events as applicable to motor failure. The impacts of mud motor stalls and drill-off times were investigated during on-bottom drilling. For the off-bottom analysis, the impact of variations in connection practices (pick up practices, time spent backreaming, and time spent exposing the tools to damaging vibrations) was investigated. The relative importance of the various features found to be relevant was calculated and incorporated into a real-time mud motor damage index.A historical drilling dataset, consisting of surface data collected from 45 motor runs in lateral hole sections of unconventional shale wells drilled in early to mid-2019, was used in this study. These motor runs contained a mix of failure and non-failure cases. The model was found to accurately predict motor failure due to motor wear and tear. Generally, the higher the magnitude of the impact stalls experienced by the mud motor, the greater the probability of eventual failure. Variations in connection practices were found not to be a major wear-and-tear factor. However, it was found that connection practices varied significantly and were often driller-dependent.The overall result shows that simple surface drilling parameters can be used to predict mud motor failure. Hence, the value derived from surface sensor information for mud motor management can be maximized without the need to run more costly downhole sensors. In addition to this cost optimization, drillers can now monitor motor degradation in real-time using the new mud motor index described here.


2012 ◽  
Author(s):  
Ernesto Franco ◽  
Nestor Jesus Molero ◽  
Miguel Gerardo Romandia ◽  
Cesar Nevarez Carmona ◽  
Arturo Martinez-Ballesteros ◽  
...  

2021 ◽  
Author(s):  
Børge Engdal Nygård ◽  
Espen Andreassen ◽  
Jørn Andre Carlsen ◽  
Gunn Åshild Ulfsnes ◽  
Steinar Øksenvåg ◽  
...  

Abstract Over the last few years, multiple wells have been drilled in the Norwegian Continental Shelf (NCS) and the United Kingdom Continental Shelf (UKCS) using wired drill pipe (WDP). This paper captures highlights from using real-time downhole measurements provided by WDP, for improved drilling operations. It presents learnings on how WDP measurements have been used in the operator's decision process. As part of WDP, along-string measurement subs (ASM) are equipped with temperature, annular/internal pressure, rotation and vibrations sensors. Data is transmitted to surface at high speed and is available in real-time, even when flow is off. The data provide great insight into the hole conditions along the drill string and at the bottom hole assembly (BHA). Based on this insight, drilling parameters at surface can be accurately adjusted, resulting in increased overall efficiency. Large data amounts can be communicated to and from surface with negligible time delay and independent from fluid circulation. Displaying the downhole measurements in real-time, both at the rig site and in remote operations centers has proven essential when optimising well construction activities. All parties need to access the same information in real-time. Moreover, the data need to be presented in an intuitive manner that enable improved operational decisions. To maximize WDP values, the Operator has learned that downhole data must be used to adjust drilling operations in real-time.


Sign in / Sign up

Export Citation Format

Share Document